NGWMN_FY24_Attachment_C_Proposal Checklist.pdf

PDF 96 KB Posted

Attached to
Groundwater and Streamflow Information Program, National Ground-Water Monitoring Network
Opportunity number
G24AS00405
Issued by

About this file

This document contains a checklist for proposals being submitted to the National Ground-Water Monitoring Network (NGWMN) federal grant opportunity. The checklist outlines numerous requirements for proposals, including page limits, budget formats, letters of support, staff qualifications, data management plans, and more. It also provides guidance on general submission requirements, such as the proposal due date of 4pm EST and applicant eligibility. Additionally, it lists specific requirements for each of the six funding objectives, including necessary tables, maps, justifications, cost limits, and match requirements. Adherence to the extensive proposal guidelines detailed in this checklist is necessary to be considered for funding under the NGWMN federal grant program administered by the United States Geological Survey.

NGWMN_FY24_Attachment_C_Proposal Checklist.pdf

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

State

Agency

Principal Investigator Name Checklist items

(Enter 'Y' or 'NA' in each light grey box) 1 2A 2B 3 4 5 6

Proposal has been proofread

Budgets have been checked for accuracy and use of the suggested format

Proposed project start and end dates are within range

Federal funding is less than $150,000 per year

Proposal is less than 20 pages excluding figures and tables. Font size is at least 12 pt (even on tables) Proposal is in PDF Format and includes all tables, figures, budgets, the Data Management Plan, and letters of support.

Adequate background information is provided

Agencies that provide data to the NGWMN through another agencies database must describe the delivery in the Background Information section

Includes table of recent NGWMN projects

Framework document or Tip Sheets are referenced

References NGWMN Well Density guidelines when proposing gap filling activities Letter of support from local USGS WSC if monitoring is part of a USGS Cooperative Matching Funds project Letter of support from other agencies that will be participating in the project

Staff qualifications are shown for staff listed in budgets

Data Management plan is included

If indirect costs exceed 10%, a current Negotiated Rate Agreement is included

General Requirements

Reminders Proposal must be submitted by 4 pm EST on the proposal due date. Late proposals will not be considered for funding

Check applicant eligibility requirements in section C1 of the Program Announcement to be sure you are eligible for funding

Proposals that do not include a detailed budget for each Objective applied for will not be reviewed

NGWMN Proposal Checklist

Overall Proposal

Objectives included in Proposal

Includes a table of sites for which work is proposed

Tables of sites include the NGWMN ID, the Principal Aquifer, and the well depth

Includes a map of all sites for which work is proposed

Maps have a scale bar, north arrow, and explanation

Maps include the Principal Aquifer

Zoomed in maps include an inset map

1 2A 2B 3 4 5 6

Includes overall project budget

Includes detailed budget for each objective

Uses budget formats in the Program Announcement

Detailed budgets include the Objective summary table

Costs and hours for the work are reasonable

Tasks in workplan are listed in detailed budget Budgets are separated out by individual task and by staff member (not lumped for each staff member) In-kind services work tasks are itemized

Costs for tasks done by contractors are itemized

Describes existing monitoring networks

Describes data storage and IT infrastructure

Describes approach for developing web services Discusses how new sites will help fill gaps in NGWMN (references well density guidelines) Includes map of potential sites that includes existing NGWMN sites References site selection and classification tip sheets

No work is proposed under Objectives 4, 5, or 6

Maps and Tables

ObjectivesOverall Proposal

Checklist items

Budgets

New Data Provider Project Requirements

No Federal funds are requested for data collection, data entry, or data management for routine data collection The need for the work is justified All sites for which work is proposed are in NGWMN Registry Includes a table of sites for which work will be done under the objective Includes a map of sites for which work will be done under the objective States the benefits of the work to the NGWMN

Workplan for objective includes detailed tasks

Tasks in workplan are in detailed budgets

Includes timeline for each objective.

Timelines include annual progress report (for multi-year projects) and the final project report Equipment with a single item cost of more than $5,000 has a quote included in the proposal Data collection methods are described in the Data Management Plan Data collection quality assurance is described in the Data Management Plan Workplan includes task for final report

Objective requirements

1 2A 2B 3 4 5 6

No match is required for Objectives 1, 2A, 2B, or 3

Provides at least 25% in-kind services match for Objectives 4, 5, or 6

No funding for travel under Objectives 1, 2A, or 2B

2A: Includes task to verify that data is flowing to the

NGWMN

2A: Funding is less than $20,000 per year for agencies serving less than 500 sites 2A: Agencies with more than 500 sites that are requesting more than $20,000 under Objective 2A must justify the additional costs 3-6: Data from agency is flowing to the NGWMN.

4: A paragraph is included for each well for which well rehabilitation, redevelopment, or repair is proposed

4-5: Equipment rental fees are reasonable and justified

5: Includes a table of proposed wells to be drilled with the cost per well shown 5: Map shows proposed new sites and all existing NGWMN sites 5: A paragraph is included for each well for for which drilling is proposed 5: Drilling costs are split out in budget table (mobilization, per foot cost, travel, casing, grout, etc)

5: Construction Assurances Form (SF-424D) is attached

5: Newly drilled wells that will be added to the Water-level Network are to be equiped with water-level monitoring equipment 6: Make, model, and cost of proposed equipment is provided

6: Per well limits are not exceeded

6: Costs of cable are listed separately in budget

ObjectivesOverall Proposal

Checklist items

Requirements for specific objectives

Date Completed

Name of Principal Investigator who completed checklist

Sheet1

File details come from the government source that posted it. Updated .