NGF SOW 4-19-21.pdf

PDF 210 KB Posted

Attached to
Next Generation Fathometer Federal contract opportunity
Solicitation number
N0025321R0020
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to Next Generation Fathometer, newest first.
File Type Posted
Market Questionnaire_N0025321R0020_November2022.docx DOCX document
Market Questionnaire_June2021.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

For

SONAR Sounding Set Equipment

23 March 2021

Naval Undersea Warfare Center (NUWC), Division Keyport 610 Dowell Street

Keyport, WA 98345

Table of Contents

1.0 SCOPE

1.1 Background

2.0 APPLICABLE DOCUMENTS

3.0 CONTRACT DATA REQUIREMENTS LIST ITEMS

4.0 REQUIREMENTS

4.1 General

4.2 First Article

4.2.1 First Article Receiver-Transmitter and Remote Depth Indicators

4.2.2 First Article NTDS-A Converter Box

4.2.3 First Article Reporting

4.2.4 Functional Testing

4.3 Production

4.3.1 Production Hardware Performance Requirements

4.3.2 SONAR Receiver-Transmitter

4.3.3 SONAR Receiver-Transmitter Mounting Bracket (Mounting Bracket)

4.3.4 Remote Depth Indicator

4.3.5 SONAR Simulator

4.3.6 NTDS-A converter box

4.4 Test, Acceptance, and Evaluation

4.5 Test and Inspection Program

4.6 Test and Inspection Procedures and Reports

4.7 Production Product Baseline Configuration Control

4.8 Information Assurance (IA)

4.9 Controlled Unclassified Information (CUI)

5.0 SUPPLY SUPPORT

5.1 Item Unique Identification Program

5.2 Diminishing Manufacturing Sources and Material Shortages (DMSMS) Program

5.3 Provisioning Parts List

5.4 Packing, Handling, Storage and Transportation

6.0 PROGRAM MANAGEMENT

6.1 Risk Management

7.0 MATERIALS, PROCESSES, AND PARTS

8.0 HUMAN ENGINEERING

9.0 FAMILIARIZATION TRAINING SUPPORT

10.0 CONTRACT DATA DELIVERABLES

11.0 CONTRACTOR PERFORMANCE ASSESSMENT

1.0 SCOPE

This Statement of Work (SOW) defines the efforts required for the production, testing (as applicable), and delivery of a SONAR Sounding Set, which includes SONAR receiver-transmitter, receiver-transmitter mounting bracket, remote depth indicator(s), SONAR simulator (test set with cables that connect to the receiver-transmitter and transducer), NTDS-A converter boxes, and associated technical documentation for ARLEIGH BURKE Class Destroyers and other navy ship classes.

1.1 Background

The SONAR Sounding Set measures the depth of water beneath the lowest projection on a vessel. The water depth is continually presented on a graphical and a numeric display, and shall be retained in memory and available for archiving. A pulse of electrical energy is converted to sound energy and transmitted downward by a transducer. When the energy strikes bottom (or any other object having acoustic properties different from those of water), a portion is reflected back to the transducer as an echo. This energy is re-converted to electrical energy for presentation. Because the speed of sound in water is assumed to be nearly constant, the amount of time which elapses between the transmission of a pulse and the reception of its echo is a measure of the distance travelled, or in this case, depth.

2.0 APPLICABLE DOCUMENTS

In the event of a conflict between documents referenced herein and contents of this SOW, contents of this SOW shall be the superseding requirement. Copies of military specifications and standards can be obtained from the Acquisition Streamlining and Standardization Information System (ASSIST) at https://assist.daps.dla.mil/online/start/. Copies of other publications not listed on the ASSIST website should be directed to the Procuring Contracting Officer (PCO).

8291204_RevB Bracket, Receiver-Transmitter, Mounting Configuration 2 8291205_RevA Bracket, Receiver-Transmitter, Bottom Plate, 90 Degree 8291355_RevA Bracket, Receiver-Transmitter, Back Plate MIL-DTL-15090E Enamel, Equipment, Light Gray (Navy Formula No 111) MIL-DTL-28840 Connectors, Electrical, Circular, Threaded, High Density, High Shock, Shipboard Class D, General Specification for MIL-DTL-901E Detail Specification: Shock Tests H.I. (High Impact)

Shipboard Machinery, equipment, and systems, requirements for

MIL-STD-129R Military Marking for Shipment and Storage MIL-STD-130N Change 1 DoD Standard Practice Identification Marking of U.S.

Military Property MIL-STD-1472G Human Engineering MIL-STD-167-1A Mechanical Vibrations of Shipboard Equipment—Type I

Environmental and Type II Internally Excited MIL-STD-1397C Input/Output Interfaces, Standard Digital Data, Navy

Systems MIL-STD-2073-1E(1) Standard Practice for Military Packaging MIL-STD-3018 (Change 2) Parts Management

3.0 CONTRACT DATA REQUIREMENTS LIST ITEMS

Contract Data Requirements List (CDRL) items are specified in Section J Exhibit A and B.

Whenever a CDRL requirement is referenced in this SOW, the CDRL number is provided.

The Contractor shall deliver all unclassified CDRL(s) electronically. CDRL(s) are Controlled Unclassified Information (CUI) and must be encrypted when sent via email. CDRL(s) too large for delivery by e-mail shall be delivered in CD/DVD-ROM format in accordance with the applicable CDRL.

4.0 REQUIREMENTS

4.1 General

The Contractor shall provide the necessary facilities, materials, equipment, travel, resources, and management required to manufacture, test, and deliver the following: SONAR receiver-transmitter and mounting bracket, remote depth indicator, SONAR simulator and NTDS-A converter box. Each SONAR receiver-transmitter shall support one (1) to three (3) remote depth indicator(s), depending on the Navy vessel configuration. Each SONAR receiver-transmitter, receiver-transmitter mounting bracket, remote depth indicator, NTDS-A converter box and SONAR simulator shall meet the specifications detailed below. Technical documents and CDRL deliverables shall be delivered with each order, or as specified on the individual CDRL.

4.2 First Article

4.2.1 First Article Receiver-Transmitter and Remote Depth Indicators The Contractor shall design, fabricate, assemble, inspect, and test, one (1) SONAR receiver-transmitter, and one (1) remote depth indicator for the purpose of First Article Testing. The First Article Units shall be tested to meet, or exceed, the performance and environmental requirements of MIL-DTL-901E, MIL-STD-167-1A, MIL-STD-461G, MIL-STD-810G, and as detailed in the Statement of Work paragraphs: 4.3.2a through 4.3.2e including Table 2, and 4.3.4a through 4.3.4e including Table 2. The Government reserves the right to observe the first article testing; therefore, the Contractor shall notify the Government two (2) weeks prior to the start of the testing. Concurrently, the Contractor shall arrange and perform Navigation Sensor System Interface (NAVSSI) testing to demonstrate SOW paragraph 4.3.2f with Space

MIL-STD-461G Requirements for the Control of Electromagnetic Interference Characteristics of Subsystems and Equipment

MIL-STD-810G (Change 1) Environmental Engineering Considerations and Laboratory Tests; Method 501.6 High Temperature and 502.6 Low Temperature

OSHA 29 CFR

1910.1001 to 1910.1101

OSHA Regulation Standard Part 1910 Occupational Safety and Health Standards

TR-355 UQN Transducer 53711-6396636

Critical Item Product Specification (CIPS) for TR-355 / UQN Transducer or equivalent

COMNAVAIRLANTINST

3530.4E

Surface Ship Navigation Department Organization and Regulations Manual and Naval Warfare Systems Center-Pacific in San Diego, California. The Contractor shall travel, perform testing, and coordinate with the Government for use of Government owned testing equipment/facilities. In the event that the receiver-transmitter or remotes fail to meet/demonstrate the acceptance criteria, the Contractor shall be responsible for redesign, rework, retest, or candidate replacement as necessary, at no additional cost to the Government. The SONAR receiver-transmitter and SONAR simulator shall operate with the legacy 12 kHz TR-355/UQN Transducer (refer to 53711-6396636 CIPS) or equivalent. Upon completion of first article receiver-transmitter and remote testing, the Contractor shall deliver these items to the Government.

The Government reserves the right to waive the requirement for First Article Hardware (FAR 52.209-3 and HQ M-2-0011 WAIVER OF FIRST ARTICLE REQUIREMENTS

(CONTRACTOR TESTING) (NAVSEA) (JUL 2000)).

4.2.2 First Article NTDS-A Converter Box

The Contractor shall design, fabricate, assemble, inspect, and test, one (1) NTDS-A converter box for the purpose of First Article Testing. This First Article Unit shall meet, or exceed, the performance and environmental requirements of MIL-DTL-901E, MIL-STD-167-1A, MIL- STD- 461G, MIL-STD-810G, and as detailed in the Statement of Work paragraphs: 4.3.6a through 4.3.6e including Table 2. The Government reserves the right to observe the first article testing; therefore, the Contractor shall notify the Government two (2) weeks prior to the start of the testing. The Contractor shall travel, perform testing, and coordinate with the Government for use of Government owned testing equipment/facilities. In the event that the NTDS-A converter box fails to meet/demonstrate the acceptance criteria, the Contractor shall be responsible for redesign, rework, retest, or candidate replacement as necessary, at no additional cost to the Government. Upon completion of first article NTDS-A converter box testing, the Contractor shall deliver this item to the Government.

4.2.3 First Article Reporting

Prior to the start of First Article testing, the Contractor shall submit a Contractual Baseline Report (CDRL A001) to include a listing of all contractor drawing numbers and their revision letters. The Contractor shall submit a First Article Qualification Test Plan and Procedures Report (CDRL A002). This Test Plan shall include a description and schedule of all tests.

The procedures shall establish applicable accept/reject criteria for First Article tests and inspections to ensure that the hardware meets all the requirements as detailed in paragraphs

4.2.1 and 4.2.2 above. Upon successful completion of First Article testing, the Contractor shall prepare a Qualification Test Report (CDRL A003). The Qualification Test Report shall summarize applicable accept/reject criteria for each test/inspection performed, and shall show actual test results for each item.

4.2.4 Functional Testing

The Contractor shall demonstrate SOW paragraph 4.3.2f, the SQQ-89 interface functionality of the SONAR Sounding Set, to include SONAR receiver-transmitter, NTDS-A converter box and associated cables between items using an AEGIS test system at Naval Undersea Warfare Center, Newport or Naval Surface Warfare Center, Dam Neck, Virginia. The Contractor shall prepare an Acceptance Test Plan (CDRL A004) for Government approval robert.wax Highlight prior to the testing. The Government reserves the right to observe the functional testing;

therefore, the Contractor shall notify the Government two (2) weeks prior to the start of the testing. The Contractor shall travel, perform testing, and coordinate with the Government for use of Government owned testing equipment/facilities. In the event that the Functional Testing fails to demonstrate functionality, or if the SONAR Sounding Set does not meet the performance requirements identified in the SOW, the Contractor shall be responsible for redesign, rework, retest, re-demonstration, or candidate replacement as necessary, at no additional cost to the Government. Upon successful completion of testing, the Contractor shall prepare a Qualification Test Report (CDRL A003).

4.3 Production

4.3.1 Production Hardware Performance Requirements

This section includes the required interfaces, performance, and physical characteristics, as well as the critical item definitions of the SONAR Sounding Set.

Specifications are identified as a threshold set of requirements, with the requirements viewed as the minimum performance requirement.

4.3.2 SONAR Receiver-Transmitter

The SONAR receiver-transmitter will be considered a Lowest Replacement Unit (LRU). The SONAR receiver-transmitter, mounted on the bracket described in paragraph 4.3.3, shall meet all of the following requirements:

a. The SONAR receiver-transmitter shall be able to operate in air temperatures between 0°

Celsius (C) to 50° C (32° Fahrenheit (F) to 122° F). SONAR receiver-transmitter shall have a storage temperature between -20° C to 60° C (-4° F to 140° F). MIL-STD-810G, Methods 501 and 502 will be used for guidance to demonstrate conformance.

b. The SONAR receiver-transmitter shall pass MIL-DTL-901E Grade A, Class II, Type A, or Light Weight Grade A, Class I, Type A, hull or deck mounted shock testing.

c. The SONAR receiver-transmitter shall meet MIL-STD-167-1A Vibration Type I testing.

d. The SONAR receiver-transmitter shall be able to operate when exposed to 95% maximum humidity.

e. All SONAR receiver-transmitter equipment and cables shall conform to the Applicable requirements for Surface Ships in accordance with MIL-STD-461G, TABLE V (Requirement Matrix) and Emission and Susceptibility requirements as specified below in Table 2. Testing shall be performed per the guidance provided in the applicable standard.

f. The SONAR receiver-transmitter shall provide external muting capability by means of a single ended signal from the external equipment, for inhibiting transmit and depth digitization functions of the receiver-transmitter.

g. The SONAR receiver-transmitter shall provide one (1) or more interfaces capable of being used for NTDS-A conversion (using a converter box) to provide depth data. This interface must conform to criteria outlined in MIL-STD-1397C standards for NTDS-A usage and employment in order to allow for data to be sent to the SQQ-89 and Command and Decision.

h. The SONAR receiver-transmitter shall provide two (2) or more RS-422 interfaces (9600

Baud Rate with no parity, 8 data bits, and one stop bit). In addition, the SONAR receiver-transmitter shall have the capability of providing depth data to a NTDS-A converter box (in addition to the two (2) or more RS-422 interfaces of the previous sentence.)

i. The SONAR receiver-transmitter shall not exceed 95 pounds.

j. The SONAR receiver-transmitter dimensions shall not exceed 16.5” Wide x 17.5” High x

9.5” Deep and shall be mountable to the receiver-transmitter mounting bracket described in paragraph 4.3.3 below.

k. The SONAR receiver-transmitter shall measure and display depth with an accuracy of at least 10% of the selected range scale down to 3000 fathoms. Operators shall have the ability to ensure safe navigation IAW COMNAVAIRLANTINST 3530.4E.

l. The SONAR receiver-transmitter shall be able to be manually adjusted by a single operator: Pulse Duration, Power Level, Gate Width, Gain, Active Window Range and Keel Offset.

m. The SONAR receiver-transmitter shall have the ability to compensate for keel depth/transducer offset from zero (0) to a minimum of 99 feet to support various naval ship class architectures.

n. The SONAR receiver-transmitter shall have operator controlled designation of single pulse or continuous operation transmission.

o. The SONAR receiver-transmitter shall have capability for up to three (3) remote depth indicators. Note: Maximum cable run specifications will not exceed 150 feet.

p. The SONAR receiver-transmitter shall be both output short-circuit protected and capable of operating into an open circuit with full drive applied, without sustaining damage.

q. The SONAR receiver-transmitter shall have a standard ¼” headphone jack, to supply an audio output and allow the ability to monitor aural soundings via head-phone.

r. The SONAR receiver-transmitter heat dissipation shall not exceed 1100 BTU/hour.

s. The SONAR receiver-transmitter shall have a power input of 115VAC 60Hz 1PH.

t. The SONAR receiver-transmitter power consumption shall not exceed 920W starting and

320W operating.

u. The SONAR receiver-transmitter power connectors shall be MIL Spec connectors

(MS3470W12-3P or equivalent). All connectors shall be accompanied by EMI/environmentally protected backshells and provided with equipment.

v. The receiver-transmitter shall use MIL-DTL-28840 type; Grade A, Shock Type connectors. All connectors shall be accompanied by EMI/environmentally protected backshells.

w. The SONAR receiver-transmitter shall operate compatibly with current TR-355/UQN 12 kHz transducers and power connectors in accordance with TR-355/UQN Transducer Critical Item Product Specification (CIPS). Requests for TR-355/UQN CIPS may be obtained by contacting NUWC Division, Newport, Code 1535, (401) 832-2805.

x. All exposed parts of metal or electrically conductive material shall be at ground (ship’s hull) potential at all times.

y. The SONAR receiver-transmitter shall have Feet, Fathoms, and Meters as individual selectable units of measure. Operator-selectable parameters shall be stored, even upon loss of power.

robert.wax Highlight

z. The SONAR receiver-transmitter shall have data storage for at least 720 hours of depth history and shall have the ability to manually transfer data files at any time. As an example, an internal USB drive or CD from an internal drive with transfer via industry standard connections is acceptable. In order to manage risks related to the use, processing, storage, and transmission of information or data, the SONAR receiver-transmitter shall not have any external USB ports or external network connectors.

aa. The SONAR receiver-transmitter shall have the ability to automatically over-write navigation data (in a continuous recording loop) once 90% +/- 2% of the drive capacity has been reached, deleting the oldest files first until the drive is at 80% capacity +/- 5%.

bb. The SONAR receiver-transmitter data that is stored shall consist of Depth vs. Time data only. The SONAR receiver-transmitter shall not have internal Global Positioning System (GPS) or other positioning capability.

cc. The SONAR receiver-transmitter shall have the following two (2) types of alarms available to the operator, which operate independently and concurrently, each of which can be enabled/disabled by the operator:

I. Lost Bottom Tracking Alarm.

II. Depth Alarm that trigger when the water depth is less than a minimum threshold, settable by the operator.

dd. The threshold (mandatory requirement) value of depth measurement is 3,000 fathoms per

Surface SONAR Technical Warrant Holder for ships with antisubmarine warfare (ASW) missions to support SONAR analysis.

ee. The contractor shall certify that SONAR receiver-transmitter components are used which support a mean time between failures (MTBF) of at least 6,000 hours.

ff. The SONAR receiver-transmitter periodic maintenance shall be completed within one (1) hour or less.

gg. The SONAR receiver-transmitter shall not require additional or unique shipboard equipment for maintenance.

hh. The SONAR receiver-transmitter shall be able to be operated by one (1) individual.

ii. The SONAR receiver-transmitter shall not use ship supplied water or forced air cooling.

jj. The Contractor shall certify that the SONAR receiver-transmitter shall meet stringent wartime operational requirements of 120 days or 2,880 hours of continuous operation without interruption. Upon certification, the Contractor shall agree that failure will constitute a latent defect.

kk. The SONAR receiver-transmitter shall be capable of fully operational status within three

(3) minutes of power-on.

ll. The SONAR receiver-transmitter brightness shall be dimmable to permit operation during tactically reduced lighting evolutions (i.e., “rig for red”) and in other navigationally mandated environments. Display shall be dimmable to a fully blackened condition.

mm. The SONAR receiver-transmitter shall have the ability for data to be marked by the operator at any significant event.

nn. A certificate of compliance (CDRL B001) shall be packed and shipped with each SONAR receiver-transmitter.

oo. If an operation system is used, the SONAR receiver-transmitter shall use Windows 10 or equivalent navy accredited system.

pp. The system must also be able to communicate with the Undersea Warfare Control Functional Segment (UCFS), returning the last depth recorded when tracking has been lost.

During this time, the last depth recorded needs to be continuously displayed on screen while also giving “LOST TRACKING” alerts. Once tracking has been regained, the alerts will clear and the system will continue to operate as intended.

qq. The system needs to be designed with (10) adjustable Power Level controls. The power output level (wattage) will range from 10-950W.

Table 2: Emission and Susceptibility Requirement Matrix for Surface Ships Test Number

Test Range / Level Test Type Test Applicability

CE101 30 Hz to 10 kHz Conducted Emissions, AC Power Leads

Receiver-Transmitter and Cabling, Remote Depth Indicator and Cabling, and NTDS-A converter box and Cabling

CE102 10 kHz to 10 MHz Conducted Emissions, AC Power Leads

Receiver-Transmitter and Cabling, Remote Depth Indicator and Cabling, and NTDS-A converter box and Cabling

CS101 30 Hz to 150 kHz

Conducted Susceptibility, AC Power Leads

Receiver-Transmitter and Cabling, Remote Depth Indicator and Cabling, and NTDS-A converter box and Cabling

CS114

10 kHz to 200 MHz

Conducted Susceptibility, Bulk Cable Injection

Receiver-Transmitter and Cabling, Remote Depth Indicator and Cabling, and NTDS-A converter box and Cabling

CS116

10 kHz to 100 MHz

Conducted Susceptibility, Damped Sinusoidal Transients, Cables and Power Leads

Receiver-Transmitter and Cabling, Remote Depth Indicator and Cabling, and NTDS-A converter box and Cabling

RE101 30 Hz to 100 kHz Radiated Emissions, Magnetic field

Receiver-Transmitter and Cabling, Remote Depth Indicator and Cabling, and NTDS-A converter box and Cabling

RE102 10 kHz to 18 GHz Radiated Emissions, Electric Field

Receiver-Transmitter and Cabling, Remote Depth Indicator and Cabling, and NTDS-A converter box and Cabling

RS101 30 Hz to 100 kHz Radiated Susceptibility, Magnetic Field

Receiver-Transmitter and Cabling, Remote Depth Indicator and Cabling, and NTDS-A converter box and Cabling

RS103 2 MHz to 30MHz Radiated Susceptibility, Electrical Field

Receiver-Transmitter and Cabling, Remote Depth Indicator and Cabling, and NTDS-A converter box and Cabling

RS105

Radiated Susceptibility, Transient electromagnetic field

Receiver-Transmitter and Cabling, Remote Depth Indicator and Cabling, and NTDS-A converter box and Cabling

4.3.3 SONAR Receiver-Transmitter Mounting Bracket (Mounting Bracket)

a. The mounting bracket shall be manufactured in accordance with drawings

8291204_RevB configuration 2; 8291355_RevA, and 8291205_RevA.

b. The mounting bracket shall have two coats of primer formula 84 per TT-P-645B(SH) and two coats of top coat formula 111 (Light Gray) per MIL-DTL-15090E.

c. A certificate of compliance (CDRL B001) shall be packed and shipped with each mounting bracket.

4.3.4 Remote Depth Indicator

a. Remote depth indicator shall have operating air temperature between 0° to 50° C and shall have a storage temperature between -20° to 60° C. MIL-STD-810G, Methods 501 and 502 will be used for guidance to demonstrate conformance.

b. Remote depth indicator shall pass MIL-DTL-901E Grade B shock testing.

c. Remote depth indicator shall meet MIL-STD-167-1A Vibration Type I testing.

d. Remote depth indicator equipment shall conform to the Applicable requirements for

Surface Ships in accordance with MIL-STD-461G, TABLE V (Requirement Matrix) and Emission and Susceptibility requirements as specified above in Table 2. Testing shall be performed per the guidance provided in the applicable standard.

e. Remote depth indicator shall be able to operate when exposed to 95% maximum humidity.

f. Remote depth indicators shall be identical and interchangeable with each other.

g. Remote depth indicator weight shall not exceed twenty-one (21) pounds.

h. Remote depth indicator dimensions shall not exceed 9.5” Wide x 5.75” High x 2.25”

Deep.

i. Remote depth indicator brightness shall be dimmable to permit operation during tactically reduced lighting evolutions (i.e., “rig for red”) and in other navigationally mandated environments. Display shall be dimmable to a fully blackened condition.

j. Remote depth indicator heat dissipation shall not exceed 80 BTU/hour.

k. Remote depth indicator shall have a power input of 115VAC 60Hz 1PH.

l. Remote depth indicator power consumption shall not exceed 23W starting or operating.

m. Remote depth indicator power connectors shall be in accordance with MIL Spec Connectors (MS3470W12-3P or equivalent). All connectors shall be accompanied by EMI/environmentally protected backshells.

n. Remote depth indicator(s) shall use MIL-DTL-28840 type; Grade A, Shock Type connectors. All connectors shall be accompanied by EMI/environmentally protected backshells.

o. Remote depth indicators shall be paperless real time.

p. A certificate of compliance (CDRL B001) shall be packed and shipped with each remote depth indicator.

4.3.5 SONAR Simulator

a. In order to manage risks related to the use, processing, storage and transmission of information or data, the SONAR simulator shall not have any external USB ports or external network connectors.

b. The SONAR simulator shall operate compatibly and simulate the TR-355/UQN-4/4A 12 kHz transducer or equivalent.

c. The SONAR simulator shall provide simulated echo in response to transmit pulse (to test overall system functionality). No transmit energy shall go to the transducer. The SONAR simulator shall measure voltage, amperage, pulse width, and frequency pulse characteristics for display on the system.

d. The SONAR simulator shall have pulse length (the duration of the transmit pulse) specified in milliseconds or fractions of a millisecond.

e. The SONAR simulator shall be able to transmit test signals to the transducer and measure impedance magnitude.

f. The SONAR simulator shall be able to simulate a transducer transmitting an acoustic pulse and receiving the echo in a specified depth of water.

g. The SONAR simulator shall be testable and display in feet, fathoms, and meters as designated by the user.

h. The SONAR simulator shall use Method III of MIL-STD-2073-1E(1) for unit packaging. The unit package shall be designated as the shipping and storage container.

i. The SONAR simulator ships power connector shall be a MIL Spec connector.

Connector shall be provided. All connectors shall be accompanied by EMI/environmentally protected backshells.

j. The SONAR simulator transducer connector shall be a MIL Spec connector.

Connector shall be provided. All connectors shall be accompanied by EMI/environmentally protected backshells.

k. The SONAR simulator receiver-transmitter connector shall be a MIL Spec connector.

Connector shall be provided. All connectors shall be accompanied by EMI/environmentally protected backshells.

l. A certificate of compliance (CDRL B001) shall be packed and shipped with each

SONAR simulator.

4.3.6 NTDS-A converter box

a. The NTDS-A converter box shall provide one (1) or more interfaces capable of being used for NTDS-A conversion to provide depth data. This interface must conform to criteria outlined in MIL-STD-1397C standards for NTDS-A usage and employment.

b. NTDS-A converter box shall have operating air temperature between 0° to 50° C and shall have a storage temperature between -20° to 60° C. MIL-STD-810G, Methods 501 and 502 will be used for guidance to demonstrate conformance.

c. NTDS-A converter box shall pass MIL-DTL-901E Grade A, Class II, Type A, or Light Weight Grade A, Class I, Type A, hull or deck mounted shock testing.

d. NTDS-A converter box shall pass MIL-STD-167-1A Vibration Type I testing.

e. All NTDS-A converter box equipment and cables (connecting the receiver-transmitter to the NTDS-A converter box) shall conform to the Applicable requirements for Surface Ships in accordance with MIL-STD-461G, TABLE V (Requirement Matrix) and Emission and Susceptibility requirements as specified above in Table 2. Testing shall be performed per the guidance provided in the applicable standard.

f. All cables which would connect the receiver-transmitter to the NTDS-A converter box, EMI backshells and MIL Spec connectors shall be supplied with equipment.

g. A certificate of compliance (CDRL B001) shall be packed and shipped with each NTDS- A converter box.

4.4 Test, Acceptance, and Evaluation

The Contractor shall provide and maintain a facility suitable for carrying out a test and inspection program. The Government reserves the right to verify the tests and inspections of the Contractor’s Test and Inspection program as required by section 4.5 and any resulting product baseline where such verifications are deemed necessary by the Government to ensure that supplies conform to prescribed requirements. Verification may consist of (a) surveillance of the Contractor's operations to determine that practices, methods, and procedures used in the execution of this contract are being properly applied, and/or (b) Government product inspections that will measure the quality of the products to be offered for acceptance.

4.5 Test and Inspection Program

The Contractor shall establish and maintain an internal Test and Inspection Program. The Contractor shall establish uniform requirements and criteria for Failure Reporting, Analysis, and Corrective Action Taken to provide management visibility and control for reliability and maintainability improvement of hardware and associated software by using failure and maintenance data to generate and implement effective corrective actions to identify failure trends, improve repair procedures, and to simplify or reduce the maintenance tasks.

4.6 Test and Inspection Procedures and Reports

The Contractor shall provide a complete Technical Data Package (CDRL B005), Product Drawings/Models and Associated Lists (CDRL B006) and Commercial Drawings/Models and Associated Lists (CDRL B007).

4.7 Production Product Baseline Configuration Control

Upon receipt and approval of the Technical Data Package (CDRL B005), the Product Drawings/Models and Associated Lists (CDRL B006), and the Commercial Drawings/Models and Associated Lists (CDRL B007), the Government will establish a Product Baseline and will assume responsibility for configuration control during production of the SONAR Sounding Set.

Once the Product Baseline is established, the contractor shall submit revisions using Engineering Change Proposals (ECPs) (CDRL B008) to describe the proposed changes to technical documents and a Notice of Revision (CDRL B009).

An ECP should be submitted whenever the detail level physical configuration, material quality, operational or functional performance of equipment or installed systems will not be in compliance with baseline design related documents (Specifications, Contract Drawings, etc.), and a change to the baseline document is considered an appropriate means of resolving a design related issue. Documentation shall be developed in sufficient detail to enable Government review and evaluation of the merits of the proposed change, including cost and scheduling impact, ship class impact, and consequences if disapproved. All existing drawings and technical manuals impacted by the change shall be listed along with a brief narrative explanation of needed changes to incorporate the ECP if approved. Weight and moment data incidental to the change shall be provided. The Contractor shall also prepare applicable baseline document insert sheets, with specific word changes or proposed re write, to facilitate baseline documentation changes.

There are two (2) types of ECP classifications:

Class 1 Criteria:

•An ECP proposing a change to approved configuration documentation for which the government is the Configuration Documentation Configuration Authority (CDCA), and •Affects any physical or functional requirement in approved functional or allocated configuration documentation, •Affects any approved functional, allocated or product configuration documentation, and cost, warranties or contract milestones, or Affects approved product configuration documentation

Class 2 Criteria:

An ECP proposing a change to approved configuration documentation for which the government is the CDCA or that which is not a Class 1.

Class I ECPs must be dispositioned (approved or disapproved) for implementation by a properly constituted Government Configuration Control Board (CCB). After the CCB direction is issued, it is important to proceed expeditiously with the “definitization” process (obtaining a pricing proposal, auditing, fact finding, and negotiating the final price) for this change and issuing a supplemental agreement. Until the contract modification is received and bi-laterally agreed to by the Government and the contractor, the contractor is not authorized to proceed with the implementation of the proposed change. If concurrence or non-concurrence of Class II ECPs is not provided within the timeframe, the Contractor shall not consider Government concurrence.

Whenever the cost of implementing a proposed change is less than the threshold requiring certified cost or pricing data, the Contractor shall provide documentation explaining the nature of related costs as shown on the change document. Whenever the contract cost changes by an amount greater than the threshold requiring certified cost or pricing data, the Contractor shall complete such cost and pricing data as the Contracting Officer shall require detailing all related costs, and attach it to the change document. Requirements for cost and pricing data shall be determined by the gross amount of the change unless otherwise directed by the contracting officer.

Deviations and Waivers - In the event that a baseline design related document requirement cannot be met, and a change to the baseline document is considered inappropriate, the Contractor shall submit a Request for Variance (RFV)(CDRL B010). The explanation of "need for deviation" should provide detailed justification and consequences of approval, to include technical details explaining the degree of non-compliance or effect on ship equipment or system operation constraints. In a similar manner, a waiver shall document an "as built" configuration that departs from baseline documentation and should include any proposed corrections or modifications to better meet the intent of the baseline document (CDRL B011).

Non Engineering Change Proposals (NECPs) - An NECP should be submitted whenever necessary to document administrative, procedural, scheduling, or documentation changes that do not directly impact the physical configuration of the equipment. The NECP shall explain the nature of the problem, identify the applicable baseline document (i.e., CDRL, Contract Clause, etc.) and provide a detailed explanation justifying the proposed course of action desired to resolve the problem. Insert sheets for applicable documents shall also be attached to facilitate change action in the event the NECP is approved.

4.8 Information Assurance (IA)

In order to address IA requirements, any SONAR Sounding Set equipment shall not have any external USB ports, or external laptop computers. The design of all units shall ensure users shall not have access to a Windows bar without going through a changeable password protection means.

4.9 Controlled Unclassified Information (CUI)

The Contractor shall require access to CUI. CUI is official information that requires the application of controls and protective measures for a variety of reasons and has not been approved for public release, to include technical information, proprietary data, information requiring protection under the Privacy Act of 1974, and Government-developed privileged information involving the award of contracts. CUI is a categorical designation that refers to unclassified information that does not meet the standards for National Security Classification under Executive Order 13526, but is (a) pertinent to the national interest of the United States or to the important interests of entities outside the Federal Government, and (b) under law or policy requires protection from unauthorized disclosure, special handling safeguards, or prescribed limits on exchange or dissemination.

Access to CUI

Contractor personnel requiring access to CUI or user level access to DOD networks and information systems, system security and network defense systems, or to system resources providing visual access and/or ability to input, delete, or otherwise manipulate sensitive information without controls to identify and deny sensitive information, shall have security clearance eligibility.

The contractor shall comply with the most recent version of and revisions thereto of DOD Manual (DODM) 5200.01, DOD Information Security Program: CUI.

DOD Security classification guides and unclassified limited documents (e.g., For Official Use Only (FOUO), Distribution Statement Controlled) are not authorized for public release and, therefore, cannot be posted on a publicly accessible webserver or transmitted over the internet unless appropriately encrypted. At a minimum, the Contractor shall handle all data received or generated under this contract as FOUO material.

Operations Security (OPSEC)

Performance under this contract requires the contractor to adhere to OPSEC requirements.

Explanation of these requirements is detailed in the Operations Security Guide for Defense Contractors, available online at:

http//www.navsea.navy.mil/Home/WarfareCenters/NUWCKeyport/Resources.aspx ; click on the OPSEC guide for Defense Contractors on the left hand side.

5.0 SUPPLY SUPPORT

5.1 Item Unique Identification Program

Using MIL-STD-3018(2) for guidance, the Contractor shall implement an Item Unique Identification (IUID) program for all end-item Lowest Replaceable Units (LRUs) in accordance with DFARS 252.211-7003, provided within thirty (30) days of contract award.

LRU identification marking is required on all LRUs. Development of specific item markings shall be in accordance with the criteria in MIL- STD-130N Change 1.

5.2 Diminishing Manufacturing Sources and Material Shortages (DMSMS) Program The Contractor shall establish an obsolescence management program over the entire period of the contract that includes an on-going review and identification of actual and potential obsolescence issues including, but not limited to, obsolescence of components, Commercial-off- the-Shelf (COTS) components, assemblies, sub-assemblies, piece parts and material including production, spare and repair requirements. The Contractor shall provide a report and update as required, Bill of Materials (BOM) for Logistics and Supply Chain Risk Management (CDRL B013).

5.3 Provisioning Parts List

The Contractor shall provide and update as changes are identified, the Provisioning Parts List (PPL) (CDRL B014). The Contractor shall identify, as applicable, the parts used in the production of the SONAR receiver-transmitter, remote depth indicator, sonar simulator, NTDS- A converter box, and associated items. The information documented shall be updated as the design changes or progresses and be sufficient to enable forecasting and management of any associated DMSMS.

5.4 Packing, Handling, Storage and Transportation

The Contractor shall utilize existing Packing, Handling, Storage and Transportation (PHS&T) infrastructure to the maximum extent possible. The Contractor’s PHS&T shall prevent damage to the material and physical harm to personnel, and shall not adversely affect the material operating characteristics.

6.0 PROGRAM MANAGEMENT

The Contractor shall manage and provide the Government insight into the program schedule, performance, cost, risks, subcontracts, vendors, and data to ensure the correct and timely delivery of all supplies and services specified in this contract, using appropriate management techniques to support program control.

6.1 Risk Management

The Contractor shall implement a comprehensive risk management process that is focused on program risk areas and the program’s critical path(s) to systematically identify and mitigate cost, schedule, and technical risks.

7.0 MATERIALS, PROCESSES, AND PARTS

Use of commercial-off-the-shelf (COTS) and non-developmental items (NDI) are encouraged and shall be used when such products meet program requirements and are cost-effective over the entire system life cycle.

8.0 HUMAN ENGINEERING

All SONAR Sounding Set equipment shall conform to the human engineering criteria of MIL- STD-1472G and support and foster effective procedures, work patterns, and personnel safety.

9.0 FAMILIARIZATION TRAINING SUPPORT

The Contractor shall provide initial system familiarization training to include set-up, operation, and maintenance and repair services. Training shall be provided to personnel located at NUWC Keyport. Contractor can assume a maximum of one (1) training classroom of 20 students.

The Government reserves the right to waive the requirement for familiarization training.

10.0 CONTRACT DATA DELIVERABLES

Table 3 below, lists the required contract deliverables. For specific information on the Data Item Description (DID) and submission requirements, refer to specific CDRL attachments (form DD-1423). Data deliverables shall contain all information required by the authorities cited in the CDRL attachments except where expressly limited in the attachments or by this Statement of Work.

Table 3: Contract Data Requirements Listing CDRL Title

A001 Contractual Baseline Report

A002 First Article Qualification Test Plan and Procedures

A003 Qualification Test Report (QTR)

A004 Acceptance Test Plan

B001 Certificate of Compliance

B005 Technical Data Package (TDP)

B006 Product Drawings / Models and Associated Lists

B007 Commercial Drawings / Models and Associated Lists

B008 Engineering Change Proposals (ECP)

B009 Notice of Revision (NOR)

B010 Request for Variance (RFV)

B011 Request for Waiver (RFW)

B013 Bill of Materials (BOM) for Logistics and Supply Chain Risk Management

B014 Provisioning Parts List (PPL)

11.0 CONTRACTOR PERFORMANCE ASSESSMENT

The Contractor Performance Assessment Reporting System (CPARS) will be utilized by the Government to track Contractor’s performance on the contract. CPARS is a web-based application that collects and manages a library of automated contractor performance evaluations. In general, contractor performance assessments or evaluations provide a record, both positive and negative, for a given contract during a specified period of time. The Government will evaluate contractor performance in the following areas:

• Quality of Product or Service

• Schedule

• Management/Management Responsiveness

• Management of Key Personnel

• Utilization of Small Business

Complete information regarding access to and use of CPARS is provided at http://www.cpars.navy.mil.

File details come from the government source that posted it. Updated .