NOAA/NATIONAL MARINE FISHERIES SERVICE

NORTHWEST FISHERIES SCIENCE CENTER

FISH ECOLOGY DIVISION

Statement of Work Purchase Request NFFP7300-22-00252

SUMMARY

Title of Project: R/V Emmett Repair and Service Performance Site: Shipyard/Dry dock within 7 hours of waterway transit distance from zip code 98112 Performance Period: Date of Award to March 31, 2022

BACKGROUND

The National Ocean Atmospheric Administration (NOAA), National Marine Fisheries Service (NMFS) at the Northwest Fisheries Science Center in Seattle, WA currently operates the NOAA R/V EMMETT, a 37-foot long aluminum Bristol Bay style vessel. This vessel is in need of maintenance and service as follows: pre-prep (e.g. sand, scrape, power spray) bottom plating and hull, prep/prime and recoat with suitable antifoul bottom coat paint, and remove old anodes and install new anodes.

PLACE AND PERIOD OF PERFORMANCE:

NOAA does not have haul-out or dry dock facilities. As such, all work must be performed at the CONTRACTOR’S location (either their base of operation or a suitable location); NOAA will be responsible for vessel transits.

This is a firm fixed price non-personal service order. Government personnel will be responsible for the overall scheduling of project activity and will provide the Contractor’s liaison / project manager with scheduling information as appropriate. Invoicing shall be upon completion. Travel costs are not authorized.

REQUIRED SERVICES

A. Required Knowledge and Experience

Selected individual(s) must have the following minimum qualifications:

Contracting company to have all necessary certifications to complete the work to Coast Guard Standards. Contractor must comply with all OSHA, Occupational Safety and Health Administration requirements and meet NOAA Small Boat Program Specifications and Guidelines (see contacts for information).

4. Schedule and Performance Period

Performance Period: Date of Award to March 31, 2022

The estimated effort for this requirement is approximately 160 hours. Overtime is not applicable to this requirement.

5. Access, Equipment and Security

Government Furnished Material/Equipment/Services. The government will make the vessel available at the agreed place and time as mentioned above.

Vessel Access. NOAA personnel shall be granted access to the vessel during working hours for the purposes of moving the vessel if necessary and inspecting and evaluating the work tasks. The Contractor is responsible for securing the vessel cabin against unauthorized access outside of working hours.

If contractors need physical access to vessel prior to dry-docking, personnel performing work must wear visible identification at all times when on board the vessel. However, personnel performing work will:

• work off-site.

• not require access to NOAA facilities other than the vessel.

• not require a PIV or CAC.

• not require a NOAA email address.

• not require use of DOC owned IT Equipment (Laptop, Desktop Computer).

• not require Non-Government IT equipment to interconnect with a DOC network.

• not require access to non-public DOC/NOAA data.

Additionally, the government shall not furnish any other materials, services, equipment, labor, supplies, facilities/facility access or similar to fulfill this contract, except as otherwise indicated. The Contractor shall provide all materials, services, equipment, labor, supplies, facilities/facility access or similar to fulfill this contract

6. Description of Services and Deliverables

The Contractor shall provide the following services throughout the period of performance and complete the following projects and deliver them to the NMFS no later 03/31/2022.

The National Ocean Atmospheric Administration (NOAA), National Marine Fisheries Service (NMFS) at the Northwest Fisheries Science Center in Seattle, WA currently operates the NOAA R/V EMMETT, a 37 foot long aluminum Bristol Bay style vessel. This vessel is in need of maintenance and service as follows:

a. Task A

1) Description: Remove bottom plating on hull (e.g. power spray, sand blast, scrape, etc.), prep/prime/antifoul bottom coat and repaint.

2) Deliverable: End result

b. Task B

1) Description: Remove sacrificial anodes and replace. Approximately 2 stern plate, 2 rudder, and 3 keel. Pictures available upon request. This aluminum vessel spends time in both fresh and saltwater so replacement will most likely be with aluminum (but can consider zinc upon recommendation from vendor)

2) Deliverable: End result

7. Additional Requests:

Condition Found Reports (CFR). The COTR must be notified in writing of any conditions found which may impact the performance of the work or administration of the contract, including a detailed description of the found condition and any proposed or requested solutions. No changes to the statement of work are authorized without written approval from NOAA.

Smoking. Smoking aboard the vessel is prohibited.

Quality Control. Quality assurance/control is the sole responsibility of the Contractor. The COTR will monitor the progress of work done by the Contractor. If, during the performance of work the NOAA Inspectors witness work that fails to meet the specifications, work that is otherwise unsatisfactory, or conditions which may lead to an unsatisfactory end product, the inspectors will advise the Contractor of the deficiency.

Interferences. The Contractor is responsible any and all interferences. The contractor shall remove all interferences and obstructions necessary to complete the required work without regard to whether interferences are indicated under specification work items. This may include the removal of machinery, piping, ducts, wiring, insulation, structure and anything else which interferes with the proper accomplishment of a work item. While awaiting reinstallation and restoration, the Contractor shall maintain and protect interferences. Unless otherwise authorized by NOAA, upon completion of required work, the Contractor shall reinstall/restore interferences to their original configuration and condition.

Damages. Any damages caused by the Contractor in performance of this contract shall be repaired at the Contractor’s expense.

Compliance. All work must be performed in strict compliance with Federal, State, and Local laws and regulations.

2. Protective Coverings.

Prior to starting work on all spaces, the Contractor will protect the decks and deck coverings of spaces in which contract work is to be performed and spaces through which workers will traverse by covering the decks and deck coverings with temporarily fitted heavy plastic, cardboard, plywood or particle board.

The Contractor will protect all compartments, machinery, equipment, furnishings, vent terminals, insulation, glass, cables, piping systems, coatings, structures, and other boat components from damage and from entry of dust, dirt, grit, sand, and other foreign particles. Methods of protection include, but are not limited to fire-retardant blanket (if required due to sparks or slag), canvas, or plastic coverings.

Any protective coverings which are damaged during the course of work shall be immediately repaired or renewed by the Contractor.

Any damage or contamination resulting from failure to provide adequate protection shall be corrected at the Contractor’s expense.

After completion of all other work the Contractor will remove and dispose of all protective coverings and waste materials.

3. Clean-up, Control and Disposal of Wastes

Upon completion of work the Contractor shall clean-up and remove from the vessel all dust, dirt, debris, scrap, and other materials incidental to the work performed.

All non-hazardous wastes and demolished materials become the Contractor’s property and shall be removed from the job site at the Contractor’s expense.

All hazardous wastes generated by work under this contract are considered to be generated by the Contractor. As the generator of these wastes, the Contractor is solely responsible for containment, management, clean-up, transportation, and proper disposal of said hazardous waste at the Contractor’s expense. Likewise the Contractor is solely responsible for any spill response, containment, cleanup and disposal resulting from contract related spills.

4. Onboard Storage.

Contractor may not store paint, primer, solvents, or any other flammable or hazardous materials aboard the vessel.

5. Pre-prep bottom plating (power spay, sand blast, scrape or equivalent to industry standard)/hull and prep/prime antifoul bottom coat paint

Bottom Paint- Contractor shall remove all hull paint, down to white metal, from the water line to bottom of keel. New primer and paint will be applied in accordance to manufactures specifications.

The NOAA Inspector will examine surface preparation prior to painting to assure conformance with specifications. Re-preparation due to oxidation bloom shall be the responsibility of the contractor at no charge to the government. Bottom paint shall be 2 coats of Pettit Hydrocoat-Eco (Black #1804).

Primer shall be 3 coats of alternating colors of Amaron 235 barrier coat epoxy.

All preparation, cleaning, and painting is to be conducted in strict compliance with the coating manufacturer’s specifications, especially pertaining to recoat and cure times, surface preparation, and environmental conditions of application.

Bottom paint shall be Pettit Hydrocoat-Eco. Primer shall be Amaron 235 barrier coat epoxy. Amaron 235 barrier coat epoxy primer will be applied to all bare metal areas prior to top coating.

Apply coatings only to dry surfaces and when there is a low chance of precipitation until after the paint has cured. The temperature of the surface to be painted shall be at least 5 degrees Fahrenheit above the dew point. Painting is permitted only when the humidity is less than 85 percent.

The Contractor is responsible for providing and installing any coverings, enclosures, or shelter which may necessary to protect the work from the weather and provide and maintain suitable environmental conditions for painting. These conditions shall be maintained until the paint has fully cured.

The Contractor is responsible for providing and installing any coverings, enclosures, or shelter which may necessary to protect the work from the weather and provide and maintain suitable environmental conditions for painting. These conditions shall be maintained until the paint has fully cured.

Bottom Paint- Sandblast (or equivalent) to coating manufacturer’s specifications. Clean and immediately apply the first coat of primer to the areas to be painted. Primer shall be three coats, 4-5 mils DFT each. Apply three top coats 3-4 mils DFT each.

Selected individual(s) must have the following minimum qualifications: