Vendor Question 1:

Will there be 220V 100Amp 3-phase electrical power available for floor grounding machine and for general use by the flooring contractor?

Government Answer 1:

YES

Vendor Question 2:

What needs to be done for the finish of existing floor drain grille coves, should these floor drain grilles be covered with epoxy flooring material?

Government Answer 2:

COVERED WITH EPOXY

Vendor Question 3:

The room is full of stored boxes and equipment. Will the room be emptied before the start of the implementation work?

Government Answer 3:

YES

Vendor Question 4:

Will you accept “equal or better” product for the Armor Shield product?

Government Answer 4:

YES

Vendor Question 5:

How far up the wall do you want the epoxy to go?

Government Answer 5:

CLARIFICATION. EPOXY SHOULD BE 4 FEET UP THE WALL.

Vendor Question 6:

Will the Statement of Work be revised to reflect changes?

Government Answer 6:

YES, SEE REVISED SOW WITH OUTLINED AREA UNDER “SPECIFIC TASKS” FOR DETAILS.