NFFKAE402102396 Statement of Work RFQ.docx
DOCX document 693 KB Posted
- Attached to
- Dock Crane Removal Ketchikan AK
- Solicitation number
- NFFKAE402102396CM2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NFFKAE402102396 Statement of Work RFQ.docx | DOCX document | |
| NFFKAE402102396 CONSTRUCTION CLAUSES PROVISIONS FAC 2021-06.docx | DOCX document | |
| NFKAE402102396 SF 18 Quote Form.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
NFFKAE40-21-02396
PURPOSE: To remove the aged un-certified marine/dock crane & repair concrete dock, using environmentally safe procedures, located at the NOAA OLE Field Office in Ketchikan, Alaska.
BACKGROUND: The NOAA Office of Law Enforcement building houses the OLE Patrol Vessel. It is considered unsafe and is mounted on a concrete dock. (See pictures below).
SCOPE:
All necessary labor, materials/supplies, equipment, services, and supervision necessary to accomplish all tasks necessary for the completion of the work set forth in this Statement of Work (SOW). These services include, but are not limited to providing: construction, testing, documentation, and construction management necessary for the successful completion of the required work.
The Contractor Shall:
· Remove & dispose of the existing crane & controls
· Terminate & remove electrical wires from the crane to the main breaker panel/electrical box. Secondary panel to be left.
· Prevent pollution with environmental barriers
· Drain & dispose of any & all hazardous fluids
· Repair dock for use
· Remove all environmental barriers & materials upon completion
PERIOD OF PERFORMANCE: Work to be completed within 60 days from date of award.
PLACE OF PERFORMANCE: 624 Mill Street Ketchikan, Alaska 99901-6541
SPECIAL REQUIREMENTS: Pictures included below and Specifications will/can be provided.
Existing crane at southeast corner of concrete deck. NOAA building location on right. Looking toward southeast.
Existing crane at southeast corner of concrete deck. Thomas Basin marine waterbody in background. Looking toward south.
Existing crane base plate. Electrical supply penetrates through concrete deck. Crane controls at left. Looking toward south.
Existing crane at southeast corner of concrete deck. NOAA building at left. Thomas Basin in background. Looking toward northeast.
Existing crane base plate. Black crane control cables hanging at right to operation stand. Looking toward northeast.
Looking from water level toward northwest at existing crane, operation stand at right, and underside of dock structure.
Looking from water level toward northwest at underside of dock structure. Note supplemental framing under crane.
Looking from water level toward southwest at underside of dock. Note crane base plate anchors through supplemental framing.
POINTS OF CONTACT (POC):
TBD
SECURITY:
The contractor(s) will be required check in with the Primary POC prior to starting the job to set up a secure entrance and exit of the area.
STANDARD INFORMATION:
A. Compliance
| The Contractor shall comply with all local, state, and Federal environmental, health, and safety regulations while conducting this work. In addition, the Contractor shall ensure that all work is in compliance with the applicable codes and be responsible for all licenses, permits and fees required to complete this project. |
| The Contractor and all employees must be in compliance with all State and Local COVID19 guidelines. Masks must be worn in any of the NMFS buildings and maintain social distance from NWS employees and other onsite contractors. Please notify the TPOC and CO immediately if any of the Contractor’s employees or subcontractors have tested positive for COVID19 and provide a plan for continuing the work as specified in this Statement of Work. |
In accordance with Federal COVID-19 protocols, all on-site contractor employees will be required to complete the non-Federal Employee and Visitor Certification Form attached and carry a copy with them when reporting to any Department of Commerce (DOC) worksite. Additionally, those who do not certify they are fully vaccinated, or who decline to provide vaccination status, must obtain a negative COVID-19 test in order to access a DOC operating location or facility, per attached Senior Procurement Executive Message. Contractors are required to attest to their CO/COR or TPOC, in writing, that all on-site contractor employees are following this guidance.
B. Disposal The Contractor will be required to properly remove and dispose of all waste material in an environmentally friendly manor.
C. Guidelines The Project shall follow the guidelines stated in the Statement of Work, site diagrams, blueprint, and any contractor provided quoted documents. All modifications must be submitted and approved by the Contracting Officer.
D. Hours of Operation
| Work shall be performed between 7:00am & 5:00pm Monday thru Friday unless otherwise approved by the POC. Contractor agrees to observe all Federal Holidays, and any other day off work designated by Federal Statute, Executive Order, or Presidential Proclamation: |
| New Year’s Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving, Christmas, Memorial Day, Presidents Day, Independence Day & Martin Luther King Day. |
E. Government Contact The primary Point of Contact will serve as the Government’s point of contact for all submissions.
F. Documents The Government does not warrant that any documents provided as attachments to be free from discrepancies, ambiguities, errors, omissions, or changing conditions. It is the responsibility of the Contractor to confirm existing conditions and resolve discrepancies between documents.
G. Project Duration Project shall be completed within 60 days of award.
H. Davis Bacon Act.
The Contractor shall comply with the current wages of the Davis- Bacon Act for Ketchikan Gateway, AK County, Heavy type.
SAFETY AND EMERGENCY PLAN:
| A. | The Contractor shall observe and institute all applicable OSHA safety requirements and procedures to prevent accidents and injuries to both Contractor and Government employees including 40 CFR 1926 Subpart M for fall protection requirements. |
| B. | The Contractor shall designate one person as Safety Coordinator for purposes of communication between the Contractor and the Primary Contact. |
GOVERNMENT PROVIDED MATERIALS AND/OR SERVICES:
A. EXCLUSIONS:
Unless otherwise indicated elsewhere in this SOW, the Government will provide no data, materials, equipment and/or services to the Contractor. Any and all research required to fulfill the SOW described herein, shall be the responsibility of the Contractor. The Government retains the right to request the Contractor to acquire additional information on behalf of the Government.
B. WARRANTY:
The Government does not warrant that any documents provided as attachments to be free from discrepancies, ambiguities, errors, omissions, or changing conditions. It is the responsibility of the Contractor to confirm existing conditions and resolve discrepancies between documents.
C. SUBMITTALS:
Shall be sent to POC.
image6.emf image7.emf image8.emf image1.emf image2.emf image3.emf image4.emf image5.emf