Newfield_Boat_Ramp_Construction.pdf
PDF 204 KB Posted
- Attached to
- Newfield Boat Ramp Construction
- Solicitation number
- ENB045266
- Issued by
- Fairfield County, Bridgeport City, Connecticut
About this file
This is an Invitation to Bid (ITB) issued by the City of Bridgeport, Connecticut Department of Public Purchases for the reconstruction of the Newfield Boat Ramp located at 421 Seaview Avenue. The project involves complete demolition of the existing deteriorated ramp and support structures, followed by construction of a new 41' x 88' concrete boat ramp extending to four feet below mean low water. Reconstruction activities include site preparation with erosion controls, removal of existing asphalt ramp and concrete block wall, construction of a geotextile and stone base, installation of a concrete headwall, placement of precast concrete planks and curbing, installation of a composite sheet pile wall on the western edge, installation of timber guide piles and floating docks with five 10'x20' floats, repaving of the asphalt roadway, and delivery of as-built survey documentation. The bid consists of 15 line items plus one bid alternative for chain-link fence installation. Electronic submissions are required through the OpenGov procurement portal and must be received by 2:00 p.m. Eastern Standard Time on Tuesday, June 2, 2026. The question cutoff date is 4:00 p.m. on Wednesday, May 20, 2026, with all answers published as addenda.
All bids exceeding $100,000 require submission of a 10 percent bid bond or certified check and must include Connecticut Department of Labor prevailing wage rates. The successful bidder must post payment and performance bonds equal to 100 percent of the contract price, obtain a Connecticut contractor's license, and comply with all municipal, state, and federal requirements. Contractors must furnish all labor, materials, equipment, tools, transportation, and supplies necessary for project completion. The City reserves the right to reject any or all bids and is not liable for respondent damages. Bidders must complete and submit multiple required documents including contractor's designation of compliance officer, good standing certification, wage certification, equal opportunity policy statement, and no conflicts/disclosure form. Out-of-state bidders must provide a Certificate of Authority to Do Business in Connecticut within five days of receiving a Notice of Intent to Award. No work shall commence until a purchase order is issued by the Purchasing Department.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID
ENB045266
NEWFIELD BOAT RAMP CONSTRUCTION
CITY OF BRIDGEPORT
DEPARTMENT OF PUBLIC PURCHASES
999 BROAD STREET
BRIDGEPORT CT 06604
Submission Deadline:
Tuesday, June 2, 2026 by 2:00 pm
Table Of Contents
1. Introduction
2. Bid Information
3. Scope of Work
4. Bid Sheet
5. Submission Instructions
6. Terms and Conditions
7. Vendor Questionnaire & Submission
Attachments:
A - Newfield Boat Ramp Bid Drawings_3.23.26
B - NewfieldBoatLaunch_RampCompleteRepair_HeavySchedule
C - RAMP Revised Construction Contract, Ins and GC 03112026 (JTM)
1. Introduction
The City of Bridgeport seeks bids for Newfield Boat Ramp Construction.
The requirements of this bid are outlined in greater detail under Bid Information & Statement of Work Section.
The selected awardee must meet all municipal, State and Federal practices and requirements.
1.1. Invitation to Bid
The City of Bridgeport seeks bids for Newfield Boat Ramp Construction. Interested firms should respond to this request on or before the time due for submission. Submissions will be received by the City of Bridgeport, Department of Public Purchases, 2nd floor, 999 Broad Street, Bridgeport, CT 06604 until 2:00 pm on Tuesday, June 2, 2026, at which time and then at said office will be publicly opened.
Any questions regarding this bid must be presented in writing and may be posted directly on the
OpenGov Procurement https://procurement.opengov.com/portal/bridgeportct website question sections. The cut-off date for questions and answers is 4:00 pm on Wednesday, May 20, 2026.
All answers will be published in the form of an addenda. All bidders shall check https://procurement.opengov.com/portal/bridgeportct regularly to see if any addendums are issued.
2. Bid Information
The Invitation to Bid (ITB) is to obtain pricing for Newfield Boat Ramp Construction
The City of Bridgeport reserves the right to reject any bid when the product information submitted with the bid is incomplete.
No work or deliveries shall be performed under the contract award until the purchase order has been issued by the purchasing department.
2.1. Bid Bond
Include with the submitted bid, a ten (10%) percent bid bond or a certified check made payable to the City of Bridgeport with bid submission if the bid is $100,000.00 or more.
2.2. Payment and Performance Bond
The successful bidder, prior to permission to proceed, will be required to post payment & performance bonds of 100% of the contract price if the contract price is $100,000.00 or more.
2.3. Contractors Requirements and Responsibilities
Contractor must be licensed in the State of Connecticut and all employees must be properly certified and qualified to perform the work. Out of state bidder must provide the City of
Bridgeport with a Certificate of Authority to Do Business in the State of Connecticut within five https://procurement.opengov.com/portal/bridgeportct https://procurement.opengov.com/portal/bridgeportct https://procurement.opengov.com/portal/bridgeportct days of a Notice of Intent to Award. This can be obtained from the Connecticut Secretary of
State.
The contractor will be responsible for the safety of the work site.
The contractor is responsible obtaining and paying for any and all permits as required.
This contract award will require that the successful vendor have a valid SAM, DUNS, CT and
Federal Tax ID numbers prior to commencing work.
The Contractor is prohibited from assigning, transferring, conveying, subletting, or otherwise disposing of the ultimate contract award or its rights, title or interest therein or its power to execute such agreement to any other person, company or corporation without the prior consent and approval in writing by the City.
2.4. CT DOL Prevailing Wage Rates
Bids in excess of $100,000 must include Prevailing Wage Rates. See section attachment section for latest CTDOL Prevailing Wage Rates.
3. Scope of Work
Please see attachments section for a more detailed Scope of Services.
3.1. Project Description
The work of this Contract consists of the Newfield Boat Ramp Construction. The intent of the contract is to provide for construction and completion, in every detail, of the work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the work in accordance with the plans, specifications, and terms of the contract. The work of this contract is located in the City of
Bridgeport. Details of the project are presented in plans and specifications that have been prepared by GZA Geoenvironmental, Inc.
Please see the following attachments for a more detailed Scope of Work.
A. GZA - Drawings - Newfield Boat Ramp Drawings, B. CTDOL Prevailing Wage Rates, C.
Ramp Construction Contract, Construction Insurance Rider, and General Conditions for
Construction.
3.2. Scope of Work
The City of Bridgeport seeks Bids/Proposals for Newfield Boat Ramp Construction. The
Newfield boat ramp, located at 421 Seaview Avenue, is currently in disrepair and will need to be reconstructed. The existing ramp and associated support structures will first need to be removed.
This includes the removal of support floats and excavation to remove sediment, stone block wall, and pavement for upland disposal.
Following demolition, a new 41' x 88' boat ramp will need to be constructed and installed to four feet below mean low water (-7.6' NAVD88). Reconstruction includes the following activities:
A. grade to place geotextile fabric and crushed stone base;
B. install a concrete headwall;
C. drive a 64 linear foot sheet pile wall on the western edge of the ramp to replace the existing concrete block;
D. install pre-cast concrete planks and curbing; a stone revetment at a slope of 3:1 along the western edge of the ramp; and, a 4' wide scour pad at the base of the ramp; and, E. place five 10'x20' floats supported by five 1' piles to be attached via a transition plate from an existing concrete landing.
4. Bid Sheet
Line Item Description Quantity Unit of
Measure Unit Cost Total
1 Obtain appropriate town building permits (include cost of fees)
1 LS
2 Mobilization 1 LS
3 Perform site preparation including the placement and installation of S&E controls (including, but not limited to hay bales, silt fencing, and turbidity curtain), the set up of working points, and dewatering considerations.
1 LS
4 Demolition, removal, and disposal of the existing bituminous asphalt boat ramp and subgrade material to grades and extents specified on the project drawings.
1 LS
5 Demolition, removal, and disposal of the existing concrete block wall as specified on the project drawings.
1 LS
Line Item Description Quantity Unit of
Measure Unit Cost Total
6 Construct the subgrade base to the lines and grades specified in the project notes and drawings. Work shall include, but not necessarily be limited to, subsurface regrading, installation of geotextile fabric, placement of filter stone, installation of the scour pad, final regrading as required, testing and construction of the side slopes.
1 LS
7 Construct concrete headwall in accordance with the project notes and drawings. Work shall include, but not necessarily be limited to, excavation of subgrade materials, placement of crushed stone, geotextile fabric, installation of reinforcement bars and concrete, installation of drainage pile, backfill, compaction and testing.
1 LS
8 Construct concrete ADA ramp and platform in accordance with the project notes and drawings. Work shall include, but not necessarily be limited to, excavation of subgrade materials, placement of crushed stone, geotextile fabric, installation of reinforcement bars and concrete and testing.
1 LS
9 Furnish and install precast concrete planks to the lines and grades specified in the project notes and drawings. Work shall include, but not necessarily be limited to delivery, placement of pre-cast planks, testing and confirmation survey of placement elevations.
1 LS
10 Furnish and install composite sheet pile wall with cap.
1 LS
11 Repave asphalt roadway in accordance with the project notes and drawings.
Line Item Description Quantity Unit of
Measure Unit Cost Total
12 Furnish and install 12-inch-diameter southern yellow pine timber guide piles and pile accessories, driven to the depths specified on the project drawings.
1 LS
13 Furnish and install timber floating docks and all associated connecting hardware. Floating docks and all related components shall be constructed in accordance with the project notes and drawings
1 LS
14 Provide an AutoCAD file and hard copy of an A-2/T-2 survey of the project area upon completion of the project (As-built).
1 LS
15 Demobilization 1 LS
Bid Alt-1 Furnish and install chain-link fence per contract drawings and specifications.
TOTAL
5. Submission Instructions
5.1. Submission Instructions
All submissions must be submitted via the procurement portal.
Special Submission Circumstances: The procurement portal, OpenGov, is the electronic bid submission process of choice for City of Bridgeport purchases. In the event, a bidder is unable to submit electronically through the city’s procurement portal, bids can be submitted, by mail, as outlined below. Non-electronic submissions are accepted on an exception only basis.
5.2. Contacting the City of Bridgeport
The exclusive means by which all prospective respondents may obtain ITB packages, direct inquires, request and receive addenda and supplemental information, and submit proposals shall be through the City of Bridgeport’s bidding platform.
The City of Bridgeport has made it possible for vendors to view our solicitations, download bid packages and ask questions, free of charge.
Instructions to do so are as follows:
1. Go to the procurement portal, OpenGov https://procurement.opengov.com/portal/bridgeportct
2. Click on any bid you see. It will take you that bid’s page.
3. On the right-hand side of the page, click on Register now for free!
4. After you register, you'll be able to view/download or ask questions on any bid you have interest in.
If you have any trouble registering, please contact OpenGov using the chat feature or send an email to procurement-support@opengov.com
General Information: All inquiries regarding this bid must be presented in writing and may be posted directly on the procurement portal, OpenGov. All answers will be published in the form of addenda on the procurement portal.
Addenda Notification: Respondents are required to register on the procurement portal, OpenGov. Once the respondent has completed registration, they will receive addenda notifications in their email. Ultimately, it is the sole responsibility of each respondent to periodically check the site for any addenda.
Late Submissions: The City of Bridgeport will not assume responsibility if a submission is misdirected, or its delivery is delayed. The city will not accept late submission. It shall be the sole responsibility of the submitter to pay for any type of delivery service charge, and to see that the Office of the Purchasing Agent receives his/her submission on time. The clock used shall be the Purchasing Agent’s official date and time stamp clock. The City does not assume financial responsibility for late deliveries by the U.S. Postal System or any other delivery service.
5.3. Electronic Submission Instructions
THIS METHOD IS PREFERRED.
The City of Bridgeport is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup.
Once you have completed account registration, browse back to this page, click on "Submit
Response", and follow the instructions to submit the electronic bid.
5.4. Paper Submission Instructions (Special Submission Circumstances Only)
SEALED ONE (1) ORIGINAL AND ONE (1) ELECTRONIC VIA THUMBDRIVE MUST
BE SUBMITTED.
Bid Submission: Sealed submissions must be received and time-stamped by the Department of
Public Purchases prior to ITB closing time. No submission received after closing time will be considered. The opening will be in the City of Bridgeport Department of Public Purchases’ https://procurement.opengov.com/portal/bridgeportct mailto:procurement-support@opengov.com https://procurement.opengov.com/signup
Conference Room. To ensure proper handling and avoid misdirected delivery, please mark your
ITB envelope as follows:
ENB045266 Newfield Boat Ramp Construction
If your envelope is not marked accordingly, the City will not assume responsibility for late delivery or deliver to the incorrect location.
Mail your submissions to:
Caroline Sanchez City of Bridgeport Department of Public Purchases
2nd floor, 999 Broad Street Bridgeport, CT 06604
ITB submissions are due:
Tuesday, June 2, 2026 no later than 2:00 pm Eastern Standard Time (EST)
Late Submissions: The City of Bridgeport will not assume responsibility if a submission is misdirected, or its delivery is delayed. The city will not accept late submission. It shall be the sole responsibility of the submitter to pay for any type of delivery service charge, and to see that the Office of the Purchasing Agent receives his/her submission on time. The clock used shall be the Purchasing Agent’s official date and time stamp clock. The City does not assume financial responsibility for late deliveries by the U.S. Postal System or any other delivery service.
NOTE: IF THE MARGARET E. MORTON GOVERNMENT CENTER, 999 BROAD STREET
BRIDGEPORT, CT IS CLOSED FOR ANY UNFORESEEN EVENT, BIDS WILL BE DUE AT
THE SAME TIME ON THE NEXT BUSINESS DAY THAT THE MARGARET E. MORTON
GOVERNMENT CENTER IS OPEN
5.5. Submission Compliance
Certificates of Insurance: Certificates of insurance will be required from the awarded contractor prior to the commencement of any work and shall be furnished to the Department of
Public Purchases, Margaret E. Morton Government Center, Second Floor, 999 Broad Street, Bridgeport, Connecticut 06604 and must be shown to the City of Bridgeport as an additional insured with thirty (30) days’ notice for cancellation or non-renewal of policy. A copy of the endorsement insurance will also be required for this project.
No Conflicts| Disclosure: the awarded contractor must accurately complete and submit the No
Conflicts/Disclosure Form when it receives a Notice of Intent to Award. Failure to submit the No
Conflicts within three (3) business days of receipt of the Notice of Intent may result in the loss of the award.
Non-Collusion Affidavit: all bidders must accurately complete and submit non-collusion affidavits with all bids or bids will be considered non-responsive.
Addendums: all bidders shall check the procurement portal regularly to see if any addendums are issued.
Contract Award Requirements: the contract award will require that the successful will require that the successful vendor have a valid SAM, DUNS, CT, and Federal Tax ID numbers prior to commencing work.
5.6. Reservation of Rights
This solicitation is for an “Invitation to Bid (ITB) only”. This invitation to bid is not to be construed as a specific proposal or an offer to buy any products or services. Notwithstanding anything else herein to the contrary, the City expressly reserves all rights in its sole discretion and in the best interests of the City at any time prior to the selection of a preferred respondent and purchase order:
Bid Rejection: The City of Bridgeport reserves the right to reject any and all bids in whole or in part or to accept any bid, in its sole discretion if doing so deemed to be in the best interest of the
City of Bridgeport. This includes the right to reject any or all bids or to decline to make an award. Further, the City of Bridgeport reserves the right to make an award to more than one bidder or make awards not based solely on low bid when time is of the essence.
Expenses: The City shall not be responsible for and/or shall not pay any costs associated with the preparation, submission, or presentation of any submission, or costs incurred by the responding firms during the interview and negotiations phase of the solicitation process
Information and Materials: Any information or materials submitted to this ITB shall become the property of the City of Bridgeport and will not be returned. All submitted materials will be available for public review.
MSDS: The City of Bridgeport may request MSDS (Material Safety Data Sheets) or additional product information and literature or samples on any brands or products proposed as equivalents to those listed herein prior to award or to be included with shipment.
Tax Delinquency: The City of Bridgeport reserves the right to ensure bidders are not delinquent on any City real estate and personal property taxes, ate the time of bid opening.
Purchase Order: No work of deliveries shall be performed under the contract award until a
Purchase Order has been issued by the Purchasing Department.
Contract Award: The City of Bridgeport reserves the right to award a purchase order to the responsible bidder whose bid, conforming to the solicitation, will be most advantageous to the
City of Bridgeport in terms of cost. Other factors such as lead time, equipment, availability and other factors specified in this solicitation may be considered.
Bid Dates: The City of Bridgeport reserves the right to modify any dates other terms of the ITB upon posting notice. Please keep in mind dates are estimates only and are subject to change.
Liability: The City of Bridgeport is not liable to any Respondent for damages of any type, however arising.
Title: vendors are prohibited from assigning, transferring, conveying, subletting, or otherwise disposing of the ultimate contract award or its rights, title or interest therein or its power to execute such agreement to any other person, company or corporation without the prior consent and approval in writing by the City.
Taxes: bidders should not include any taxes in their quotation for which the city is not liable. The City of Bridgeport will issue tax-exempt certificates covering the work upon request.
6. Terms and Conditions
The selected awardee must meet all municipal, State and Federal practices and requirements.
6.1. Terms and Conditions
All City of Bridgeport contracture terms, conditions, and requirements apply.
6.2. Payment Terms
All payments will be made in accordance with the terms and conditions set forth in the resulting
Agreement.
6.3. Warranty
In addition to any warranty implied by law or fact, and any other express warranties, bidder expressly warrants all items to be free from defects in design, workmanship and materials to conform strictly to applicable specifications and to be fit and sufficient for the purpose intended to be merchantable. All warranties shall survive inspection, test, acceptance of and payment by the City.
6.4. Openness of Procurement Process
Written responses, other discussions, correspondence, and all other pertinent records shall be handled as public records in compliance with State and Federal open records statutes and regulations.
6.5. Errors and Omissions
Once a response is submitted, the City of Bridgeport may consider requests by any contractor to correct errors or omissions but shall retain sole discretionary authority to determine the outcome of such a request.
6.6. Collusion
By offering a response to this ITB the supplier certifies that no attempt has been made or will be made by the consultant to induce any other person or firm to submit or not to submit a proposal for the purpose of restricting competition. All persons interested in this project, principal or principals being named therein, and no other person have an interest in this project or in the
Agreement which they may participate in. No person or agency has been employed or retained to solicit or secure this Agreement upon an agreement or understanding for a commission, percentage, brokerage, or contingent fee, excepting legitimate employees or established commercial agencies maintained by the consultant for the purpose of doing business. All firms interested in this project (including the firm's employees, representatives, agents, lobbyists attorneys and subconsultants) will refrain, under penalty of disqualification, from direct or indirect contact for the purpose of influencing the selection or creating bias in the selection process with any person who may play a part in the selection process, including the evaluation panel and other administrative staff. The policy is intended to create a level playing field for all potential firms; assure that contract decisions are made in public and to protect the integrity of the selection process.
6.7. Suspension and Debarment
The City will not participate in contracts with parties that have been debarred, suspended or excluded from Federal assistance programs per 2 CFR part 180 and part 1532 and 40 CFR part
31.35. Further, the respondent is required to verify that the respondent, or its principals, as defined at 49 CFR 19.995, or affiliates, as defined at 49 CFR 29.905, are excluded or disqualified as defined at 49 CFR 29.40 and 29.945.
The respondent is required to comply with 49 CFR 29, Subpart C and must include the requirement to comply with 49 CFR 29, Subpart C in any lower-tier covered transaction it participates in.
By signing and submitting its bid or proposal, the respondent or proposer certifies as follows:
The certification in this clause is a material representation of fact relied upon by the City if it is later determined that the respondent or proposer knowingly rendered an erroneous certification, in addition to remedies available to the City the Federal Government may pursue available remedies, including but not limited to suspension and/or debarment. The respondent or proposer agrees to comply with the requirements of 49 CFR 29, Subpart C while this offer is valid and throughout the period of any contract that may arise from this offer. The respondent or proposer further agrees to include a provision requiring such compliance in its lower-tier covered transactions.
6.8. Insurance Requirements
Prior to award a satisfactory Certificate of Insurance (COI) will be required. See attachment section for Construction Services insurance coverage.
6.9. Conflict of Interest
The proposer certifies that to the best to their knowledge or belief, no elected/appointed official or employee of the City is financially interested, directly or indirectly, in the purchase of the foods or services specified in this Request for Proposal.
Proposers are required to complete and answer the No Conflict form located in the Vendor
Questionnaire & Submission section.
6.10. City Exempt from Certain Taxes
The City is exempt from certain Connecticut sales taxes under Title 12, Chapter 219 of the
Connecticut General Statues, as amended from time to time. Services and materials for this project are exempt from State of Connecticut sales tax.
7. Vendor Questionnaire & Submission
1. Federal I.D. Number or Social Security Number:*
*Response required
2. Confirmation*
Pursuant to and in compliance with your Invitation To Bid relating thereto, the submitter states that he has examined the Contract Documents and the site of the work, and that he understands the purport and magnitude of the work intended, and the undersigned hereby offers to furnish all plant, materials, supplies, equipment, labor, and other facilities and things necessary or proper for or incidental to, the proper construction of the work, and to construct the said work in strict accordance with the Contract Documents and such detailed directions, plans, and drawings as may be furnished from time to time during the progress of construction by the Engineer at the following unit and lump sum prices which prices include all incidental work, viz.
☐ Please confirm
*Response required
3. Contractor's License Number*
*Response required
4. BID BOND: *
Bidder must Include with the submitted bid, a CURRENT CERTIFIED ten (10%) percent bid bond or a certified check made payable to the City of Bridgeport with their bid submission if the bid is $100,000.00 or more. Bid bonds must reference the current project.
*Response required
5. Contractor's Designation of Compliance Officer*
Please download the below documents, complete, and upload.
• Contractor's_Designation_of...
*Response required
6. Contractor's Good Standing Certification*
Please download the below documents, complete, and upload.
• Contractor's_Good_Standing_...
*Response required
7. Contractor's Wage Certification Form*
Please download the below documents, complete, and upload.
https://government-project.s3.us-west-2.amazonaws.com/115403/3faa8962-fb0f-477e-9640-3d6a6e5da7b5_Contractor%27s_Designation_of_Compliance_Officer.pdf https://government-project.s3.us-west-2.amazonaws.com/115403/c66f2928-6ed1-487c-b379-a483753f60fe_Contractor%27s_Good_Standing_Certification.pdf
• Contractor's_Wage_Certifica...
*Response required
8. Equal Opportunity Policy Statement*
Please download the below documents, complete, and upload.
• Equal_Opportunity_Policy_St...
*Response required
9. No Conflicts / Disclosure Form*
Please download the below documents, complete, and upload.
• NO_CONFLICTS_FORM_10-2018_a...
*Response required
10. Additional Vendor Documents (optional)
Vendor can upload additional documents relevant to solicitation.
https://government-project.s3.us-west-2.amazonaws.com/115403/bc822fc4-8c98-4c44-9c3c-6bbdb5037c4a_Contractor%27s_Wage_Certification_Form.pdf https://government-project.s3.us-west-2.amazonaws.com/115403/c3bb68fd-8bdb-4117-814f-2c90076a67e8_Equal_Opportunity_Policy_Statement_09162025REV.pdf https://government-project.s3.us-west-2.amazonaws.com/115403/31223730-5bed-41f3-bdeb-c2f97ce250c6_NO_CONFLICTS_FORM_10-2018_and_02-2025.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4G5S6ZUBU%2F20260504%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260504T145106Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEKb%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIBi4gXTYeikThmo9HUDPGrENnAjOZ2Lpd%2FOw9NY8SULeAiEA8bzQTo8gjuYznussbQMTHYC0pyLTyiP4T%2FdwAMg0EGMqjAUIbxACGgw4OTIzNjQ2ODc2NzIiDCygUmQ%2F5d1stYLCySrpBIZ34WEjJpgJ%2BDLVLLijR92S0MFptL9jq14oFMZFzponA4xwZ7DmRG2VtfORhmuxzfVMbwUUeI3jYBMBUuRVkfrY1oiM1J%2BKb5thLYndXA3Vj9Ty%2BAsxijBq05eCCX1Y7AUV9AAJBQgqR9KzBO7OMNwS3QuV8Wce13rSYO7T0HMtdOAAgAtS2hMzdWU0xhv5HJr8mnqm1wmjZFu10tMEsrPX1imXf7kTTZjsgYKCEwuH%2FYWpFMIPW0oRDrJeIr6eqaqz8zwuyQ0TsFIqVF0jqEaGIfT3xiKug1kqVQ7m0DjJDGzyFWQd5NE3knpyqplvRAq6GfVubtYjsi4DR3Vhl6%2Ffr5I9ONc5L9bBUsmQGdRqcdNDKiK0XKVT4jBd7DHNHJ6RQfc%2FVRG8tU%2B0yfMVPXJagoJL954E4z5ZV2V4OqhB741eUz%2FiTFGYhDeOfnlghOAN%2BJYc8e1vnrFqrHsL%2Fh2aKG911pOttmlFKXYAm0MWhMCVjnUDRNiB6xvxCIX8r9Cj51Q3yUiNvxLLNTzGoQCW%2FxUZHOW5INt2NQkBghijjZpeUOmu9o8ITQP03jvSwMz62kbnfdmvPHK%2BRSuDiq2gzjDeDkL7EgXk5TBkPOz%2ByUtiQ0vCQ0adOsMX%2FMmRgTcLW0an1hPcPw0h0yxPvHBH6cL3eZhwVelnWGYjrBzAj%2BXZrLelLJCSTJ%2F%2FyclOTSluXCWdwyau4oxsfy%2BNXSI5DAiUnqAkZOIH6zTMzD%2BFZRobnXxYkJyl8DIR3fnzOG4aUV0Mm3VbebF7P%2BI7Poyfw8WfE3U3dgH4Gdob6irt92HgNPbGHGMfMNrA4s8GOpkBjTd5DCag4aFidSvkMnkM2JUsgVKu7ZDP%2B5vLBTE76R3ciiVvnxPUwhQ0jOT6OSbycB1WCFfK2vWn5lBfMRlx48rdGfMi2VPBwDhCMCXlk%2FT3slTkLWliEKOFVX%2FvsMlpyZivveNZHBlphj1UdK8z0cwzP9xzVkRyzEqUZImwiR2QrFvfnkKTuJbtxj3OncdJyiaFl%2F1rrNtX&X-Amz-Signature=e460b9d036f211055d37e3ac408070b6b5659dcac734aca90a0f9a3313e6f6c4&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22NO_CONFLICTS_FORM_10-2018_and_02-2025.pdf%22&x-id=GetObject
| 1. Introduction |
| 1.1. Invitation to Bid |
| 2. Bid Information |
| 2.1. Bid Bond |
| 2.2. Payment and Performance Bond |
| 2.3. Contractors Requirements and Responsibilities |
| 2.4. CT DOL Prevailing Wage Rates |
| 3. Scope of Work |
| 3.1. Project Description |
| 3.2. Scope of Work |
| 4. Bid Sheet |
| 5. Submission Instructions |
| 5.1. Submission Instructions |
| 5.2. Contacting the City of Bridgeport |
| 5.3. Electronic Submission Instructions |
| 5.4. Paper Submission Instructions (Special Submission Circumstances Only) |
| 5.5. Submission Compliance |
| 5.6. Reservation of Rights |
| 6. Terms and Conditions |
| 6.1. Terms and Conditions |
| 6.2. Payment Terms |
| 6.3. Warranty |
| 6.4. Openness of Procurement Process |
| 6.5. Errors and Omissions |
| 6.6. Collusion |
| 6.7. Suspension and Debarment |
| 6.8. Insurance Requirements |
| 6.9. Conflict of Interest |
| 6.10. City Exempt from Certain Taxes |
| 7. Vendor Questionnaire & Submission |
| 1. Federal I.D. Number or Social Security Number:* |
| 2. Confirmation* |
| 3. Contractor's License Number* |
| 4. BID BOND: * |
| 5. Contractor's Designation of Compliance Officer* |
| 6. Contractor's Good Standing Certification* |
| 7. Contractor's Wage Certification Form* |
| 8. Equal Opportunity Policy Statement* |
| 9. No Conflicts / Disclosure Form* |
| 10. Additional Vendor Documents (optional) |
File details come from the government source that posted it. Updated .