NEW FAIRFIELD L0900002 Project Manual bid release 112026.pdf
PDF 3 MB Posted
- Solicitation number
- 40036
- Issued by
- Fairfield County, Connecticut
About this file
Summary
This is a Project Manual and Bid Release document for the Town of New Fairfield, Connecticut, issued by the Public Works Department for the Downtown Sidewalk and Streetscape Improvements II project (State Project No. L090-0002, Bid No. 2026-27PWD3). The project involves installing sidewalk and streetscape improvements including bituminous colored and textured sidewalks and parking pavement, concrete and bituminous curbs, concrete pavers, pedestrian ramps, decorative street lighting, relocated benches, and two-way pedestrian signals. The bid scope includes numerous line items with specified quantities, such as 5,000 linear feet of bituminous concrete pavement cutting, 1,407 square yards of topsoil installation, 17,247 square feet of textured and colored bituminous pavement for sidewalks and parking areas, and six ornamental light standards. A pre-bid conference is scheduled for December 11, 2026, at 10:00 AM at Town Hall. Sealed bids are due by January 8, 2027, at 11:00 AM and will be publicly opened at the Town Hall Conference Room. The selected contractor must complete all work within 120 calendar days from the notice to proceed, with an additional 30-day period to remediate punch list items. The contract will be awarded to the lowest responsible eligible bidder meeting all qualifications.
The project is funded with $1,754,853.00 in state funding, with established spending allocation goals of 9.26% ($162,486.00) for Small Business Enterprises and 5.56% ($97,492.00) for Minority Business Enterprises, requiring the selected contractor to demonstrate good faith effort to meet these goals. Bid security of five percent (5%) of the total bid amount is required via cashier's check, certified check, or bid bond, with a performance and payment bond of 100% of the accepted bid due within 15 days of notice of acceptance. The contractor must hold a current appropriate license from the State of Connecticut and comply with prevailing wage rates established by the U.S. Department of Labor for the New Fairfield area, with certified monthly payroll submissions required. Comprehensive general liability insurance with minimum limits of $1,000,000 per occurrence, workers' compensation insurance, and auto liability insurance are mandatory. The contract includes a one-year maintenance period with five percent (5%) retainage, extended to two years for electrical, mechanical equipment, and plant material. No liquidated damages clause applies to this contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB Downtown Sidewalks and Streetscape 111926.pdf | ||
| 40036_Nov_20_26_solicitation_doc.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NEW FAIRFIELD DOWNTOWN SIDEWALK AND STREETSCAPE
IMPROVEMENTS II
NEW FAIRFIELD, CONNECTICUT
PROJECT MANUAL
BID NO. 2026-27PWD3
PROJECT NO.: L090-0002
NOVEMBER 20, 2026
Patricia Del Monaco, First Selectman Khris Hall, Selectman Jon Russo, Selectman
Antonio Iadarola, P.E., Town Engineer, Didona Associates – Landscape Architects, LLC 70 North Street, Suite 304
Danbury, Connecticut 06812 203.778.1840
TABLE OF CONTENTS
Invitation to Bid
Information for Bidders
Hold Harmless Agreement
Non-Collusion Affidavit of Prime Bidder
Corporate Resolution
Contractor’s Qualification Statement
State of Connecticut Certificate of Compliance with Connecticut General Statute Section 31-57B
Bid Bond
Proposal Form – Proposal Page
Proposal Form – Bid Sheet
Contract
Specifications General Provisions Suggested Minimum Schedule for Acceptance Testing (LOTCIP) Technical Specification Special Provisions
0202502A Removal of Concrete Pavers 0202529A Cut Bituminous Concrete Pavement at 45-degree angle 0601331A Reset Existing Benches with Concrete Pad 0812001A Concrete Curb 0812001A-1 Concrete Curb 0812001A-2 High Concrete Curb 0814001A Reset Belgian Block Curb 0915000A Tree Protection 0915000A-1 Cribbing 0915000A-2 Armoring 0921002A Concrete Sidewalk 0921002A-1 Concrete Sidewalk -8” Thick 091002A-2 Concrete Sidewalk Ramp 0921024A Concrete Pavers 0921024A-1 Concrete Paver Walk on New Base 0921024A-2 Concrete Paver Walk on Existing Base
TABLE OF CONTENTS
0922005A Bituminous Conc. Pavement Textured & Colored 0922005A-1 Bituminous Concrete Pavement Textured & Colored – Crosswalk
0922005A-1 Bituminous Concrete Pavement Textured & Colored – Sidewalk and Parking Areas
0944001A Furnishing and Placing Topsoil 0950005A Turf Establishment 0950005A-1 Turf Establishment 0950005A-2 Turf Establishment Erosion Control Matting- Jute 1003892A Ornamental Light Standard 1009232A Remove/ replace PVC Weatherproof Junction Box, GFCI Exterior Outlet and
120 volt LED uplights 1009232A-1 Remove/Replace PVC Weatherproof Junction Box 1009232A-2 Remove/Replace GFCI Exterior Outlet 1009232A-3 Remove/Replace 120 volt LED uplights 117111A Rectangular Rapid Flashing Beacon (RRFB) – Type B 1204122A Project Sign
I-1
INFORMATION FOR BIDDERS
1. RECEIPT AND OPENING OF BIDS. The Town of New Fairfield, Connecticut, herein called the "Town", invites bids on the forms attached hereto. All blanks on these forms must be appropriately filled in as required. Bids will be received at the New Fairfield Town Hall, Selectman's Office attention Purchasing Agent, New Fairfield Town Hall, 4 Brush Hill Road, New Fairfield, CT 06812 until January 8, 2027, at 11:00 AM. at which time, they will be publicly opened and read aloud.
a. Proposals shall be enclosed in opaque sealed envelopes, addressed to the Purchasing Agent of the Town of New Fairfield, New Fairfield Town Hall, 4 Brush Hill Road, New Fairfield, Connecticut. To ensure proper identification, bid envelopes must indicate the name and address of the bidder, the project name and the bid number. If forwarded by mail, the opaque sealed envelope containing the proposal marked as directed must be enclosed in another envelope addressed as specified herein before.
b. The Town may reject and all bids not prepared and submitted in accordance with the provision hereof. Prior to the public opening of the bids, any bid submitted may be withdrawn by the bidder if said bidder discovers mathematical or clerical errors in his bid. Any such bid withdrawal may be made without penalty or prejudice. After the bids are opened, all offers will be considered firm for a period of ninety days and no bid may be withdrawn for any reason during that period except for such cause as the Town of New Fairfield in its sole discretion deems sufficient.
2. DESCRIPTION OF WORK. Work consists of all labor, tools, materials and equipment necessary to install Sidewalk and Streetscape Improvements, including but not limited to bituminous sidewalks colored and texture, bituminous concrete parking pavement colored and textured, bituminous concrete crosswalks colored and textured, concrete and bituminous concrete curbs, concrete pavers, concrete pedestrian ramps, painted and epoxy crosswalks, decorative street lighting, relocated benches, 2 Way Pedestrian Signals Pole Mounted with lights, and all mechanical equipment and related work and materials.
3. PREPARATION OF COMPLETE PROPOSALS. Price Proposals must be submitted on the prescribed Proposal Form provided in the bid documents. All blank spaces for unit prices, extended totals, lump sum, and summation must be filled in, in ink or typewritten, in both words and figures. Any blank non-filled bid items will constitute an incomplete bid. The following additional documents must be filled out and submitted with the bid in order to deem the bid complete; Hold Harmless Agreement, Non- Collusion Affidavit of Prime Bidder, Corporate Resolution, Contractor’s Qualification Statement, Certificate of Compliance with CT General Statute Section 31-57b and a Bid Bond for the total summation of the bid.
4. ERRORS IN BID. In the event there is a discrepancy between the written words and written figures, the written words shall govern. In case of error in the bidder's extended summation, the computed total using the unit prices and/or lump sum amounts written in words shall govern. If an error is obvious and leaves no confusion as to which amount is correct, the obviously correct amount shall govern. The amount written in words shall govern only when it is unclear or if there is confusion as to which amount is correct.
5. APPROXIMATE QUANTITIES. The quantities given in the Proposal are approximate only, being given as a basis for the uniform comparison of bids, and the Town does not expressly or by implication agree that the actual work will correspond therewith.
6. BIDDERS TO CHECK APPROXIMATE QUANTITIES. Bidders must satisfy themselves by personal examination of the location of the proposed work, and by such other means as they may choose, as to the actual conditions and requirements of the work, and the accuracy of the estimate of the Engineer, and shall not, at any time after the submission of a bid, dispute or complain of such statement or estimate of the Engineer, nor assert that there has been any misunderstanding in regard to the nature or
I-2 amount of the work to be done. Should the Bidder find a quantity that does not match the amount on the proposal sheet, the Bidder must notify the Town.
7. PRICES NOT CHANGED BY CHANGE OF QUANTITIES. A 25% increase or decrease in the quantities listed in the Proposal, for any item shall not be regarded as sufficient grounds for an increase or decrease in the price of that item, nor in the time allowed for the completion of the work, except as provided in the Contract.
8. INTENT OF CONTRACT DOCUMENTS. The intent of the Contract Documents is to obtain a complete job, satisfactory to the Town and the Landscape Architect. It shall be understood that the bidder has satisfied himself as to the full requirements of the Contract and has based his Proposal upon such understanding. Compensation for all work and materials required to complete the Contract shall be considered included in the various unit prices and lump sums bid and stipulated for the items listed in the Proposal.
9. ADDENDA AND INTERPRETATIONS. No interpretations of the meaning of the Contract Documents will be made to any prospective bidder orally. Every request for such interpretation is required to be in writing addressed to the Purchasing Agent, New Fairfield Town Hall, 4 Brush Hill Road New Fairfield, Connecticut, 06812 and to be given consideration must be received by December 18, 2026. Written requests may also be faxed (Fax No. 203-312-5659) or e-mailed to the Purchasing Agent (Patty Mota pmota@newfairfieldct.gov). Any and all such interpretations and any supplemental instructions will be in the form of written addenda to the specifications which will be distributed to all prospective bidders (at the respective address furnished for such purposes) no later than three (3) days prior to the date fixed for the opening of bids. Failure of any bidder to receive any such addenda or interpretations shall not relieve said bidder from any obligations under his bid as submitted. All addenda so issued shall become part of the Contract Document.
10. CONDITIONS OF WORK. Each bidder must inform himself fully of the conditions relating to the construction and labor under which the work will be performed; failure so to do will not relieve a successful bidder of his obligation to furnish all material and labor necessary to carry out the provisions of the Contract Documents and to complete the contemplated work for the consideration set forth in this bid.
a. At the time of the opening of bids each bidder will be presumed to have inspected the site and to have read and to be thoroughly familiar with the Contract Documents, including all addenda. The failure or omission of any bidder to receive or examine any form, instrument, or document shall in no way relieve any bidder from any obligation in respect to his bid.
b. Bidders are notified that it is obligatory upon them to obtain by their own means information which they may require as to the existing physical conditions, and in particular as to subsurface and ground water conditions. The Town will make available to the bidder all information obtained by investigation previous to opening bids but makes no guarantee with respect to the accuracy of such information and each bidder represents that he relies exclusively upon his own investigations and he makes his bid with a full knowledge of all conditions, and the kind, quality, and quantity of work required.
11. TIME LIMIT. The contractor guarantees that he can and will complete all work under Bid No. 2026-
27PWD3 within 120 calendar days from the notice to proceed. Contract time will stop accumulating once a Notice of Substantial Completion is issued by the Town. The contractor will have 30 days from the date the Punch List is issued to remediate all punch list items to the satisfaction of the Town.
12. QUALIFICATIONS OF BIDDERS. The Contractor must hold a current appropriate license from the
State of Connecticut. The Town may make such investigations as it deems necessary to determine the ability of the bidder to perform the work in the manner and within the time limit stipulated, and the bidder shall furnish to the Town all such information and data for this purpose as the Town may request.
The Subcontractor for the installation of the bituminous concrete colored and textured must meet the
I-3 requirements as outlined in Special Provision Item #0922005A Bituminous Concrete Pavement Textured and Colored.
13. CHRO REQUIREMENTS. The contractor who is selected to perform this State project must comply with CONN. GEN. STAT. §§ 4a-60, 4a-60g, and 46a-68b through 46a-68f.
a. This contract is subject to state contract compliance requirements, including nondiscrimination statutes and spending allocation goals. There is $__1,754,853.00 in state-funding for this project.
State law requires project-specific goals be set for this project based on the project’s needs and available Small Business Enterprises (“SBEs”) and Minority Business Enterprises (“MBEs”).
The SBE goal for this project is _9.26%_$162,486.00___. The MBE goal for this project is _5.56% $97,492.00____. The selected contractor must demonstrate good faith effort to meet the spending allocation goals.
14. BID SECURITY. Each bid must be accompanied by cashier's check, certified check of the bidder, or a bid bond prepared on the Bid Bond attached hereto, duly executed by the bidder as principal and having as surety thereon a surety company approved by the Town in an amount not less than five percent (5%) of the amount of the bid. The Surety company must be listed on the most recent IRS Circular 570. Such checks or bid bonds will be returned to all except the three lowest formal bidders within 3 days after the formal opening of bids. The remaining checks or bid bonds will be returned to the 3 lowest bidders within 48 hours after the Town and the accepted bidder have executed the Contract, or if no Contract has been executed, within 90 days after the date of the opening of bids, upon demand of the bidder at any time thereafter so long as he has not been notified of the acceptance of his bid.
15. CONSENT OF SURETY. In addition to the checks or bid bond for bid security, each bid must be accompanied by a bid letter from a surety company, qualified and authorized to do business in the State of Connecticut agreeing, in event of the award of the Contract, to furnish a Performance and Payment Bond of a face value of one hundred percent (100%) of the amount of the bid. I-3
16. PERFORMANCE, LABOR AND MATERIALS BONDS. Within 15 days of receipt of notice of acceptance of his bid, the successful bidder must deliver to the Town an executed bond in the amount of one hundred percent (100%) of the accepted bid as security for the faithful performance of his Contract and for the payment of all persons performing labor or furnishing materials in connection therewith, prepared in the form of Performance and Payment Bond attached hereto and having the security thereon such Surety company or companies as are acceptable to the Town and as are authorized to transact business in the State of Connecticut.
17. AWARD. The Contract will, at the discretion of the Town, be awarded on the basis of competitive bids to the lowest responsible eligible bidder.
a. It is the purpose of the Town not to award the Contract to any bidder who does not furnish satisfactory evidence that he is responsible and that he has sufficient capital, ability, experience, and plant to enable him to prosecute the work successfully, and to fulfill all the requirements of the Contract.
b. The Town of New Fairfield is not obligated for expenditures unless funds have been encumbered by Purchase Order or executed contract. Neither the decision or vote of the Board of Awards, nor the "Notice of Award" letter shall be considered an authorization for shipment or a notice to proceed with services or to order materials. A company or person who proceeds prior to receiving a Purchase Order or signing a contract does so without a contract and at their own risk.
18. REJECTION OF BIDS. The Town reserves the right to reject any and all bids, or to accept any bid should it deem it to be in its best interest so to do. Bids not prepared and submitted in accordance with the provisions of Information for Bidders and/or bids which are incomplete, conditional or obscure, or which contain additions not called for, erasures, alterations or irregularities of any kind, may be rejected as informal.
I-4
19. The Town reserves the right to reject a bid from a Contractor who is in arrears relative to a Town invoice(s) on another project.
20. POWER OF ATTORNEY. Attorneys who sign Contract Bonds must file with each bond a certified copy of their power of attorney to sign said bonds.
21. PRE-CONSTRUCTION CONFERENCE AND NOTICE TO PROCEED. Either before or soon after the actual award of the Contract (but in any event prior to the start of construction), the Contractor or his representative shall attend a Pre-Construction Conference with Representatives from the Town of New Fairfield. The Conference will serve to acquaint the participants with the general plan of Contract administration and requirements under which the construction operation is to proceed, and will inform the Contractor, in detail, of the obligations imposed on him and his subcontractors by the Executive Orders concerning Equal Employment Opportunity. The date, time and place of the Conference will be furnished to the Contractor by the Town of New Fairfield.
TOWN OF NEW FAIRFIELD,
CONNECTICUT
HOLD HARMLESS AGREEMENT
___________________________________________________herein the "CONTRACTOR", assumes responsibility for any and all injury to or death of any and all persons, including the CONTRACTOR'S agents, servants and employees, and in addition thereto, for any and all damages to property caused by or resulting from or arising out of any act or omission in connection with this contract or the prosecution of work hereunder, whether caused by the CONTRACTOR or the CONTRACTOR'S agents, servants or employees, or the
CONTRACTOR'S subcontractors or suppliers, and the CONTRACTOR shall indemnify and hold harmless the owner, the Town of New Fairfield, and Didona Associates – Landscape Architects, LLC the Landscape
Architect from and against any and all loss and/or expense which they or either of them may suffer or pay as a result of claims or suits due to, because of or arising out of any and all such injuries, deaths and/or damage. The
CONTRACTOR if requested, shall assume and defend at the CONTRACTOR'S own expense, any suit, action or other legal proceedings arising therefrom, and the CONTRACTOR hereby agrees to satisfy, pay and cause to be discharged of record any judgment which may be rendered against the owner or architect arising therefrom.
Dated at New Fairfield, Connecticut this _________________ day of ______________________, 2026.
Signed, Sealed and Delivered SIGNED in the presence of: BY:
NON-COLLUSION AFFIDAVIT OF PRIME BIDDER
STATE OF CONNECTICUT)
) ss. New Fairfield 2025
COUNTY OF FAIRFIELD )
________________________________________, being first duly sworn, deposes and says that:
1. He is (owner, partner, officer, representative, or agent) of ________________________________________ the Bidder that has submitted the attached Bid;
2. He is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid;
3. Such Bid is genuine and is not a collusive or sham bid;
4. Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affidavit, has in any way colluded, conspired, connived or agreed, directly or indirectly, with any other Bidder, firm or person to submit a collusive or sham Bid in connection with the
Contract for which the attached Bid has been submitted or to refrain from bidding in connection with such
Contract, or has in any manner, directly or indirectly, sought by agreement or collusion or communication or conference with any other Bidder, firm or person to fix the price or prices in the attached Bid or of any other
Bidder, or, to fix any overhead, profit or cost element in the bid price or the bid price of any other Bidder, or to secure through any collusion, conspiracy, connivance or unlawful agreement any advantage against the
TOWN or any person interested in the proposed Contract; and
5. The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance or unlawful agreement on the part of the Bidder or any of its agents, representatives, owners, employees, or parties in interest, including this affidavit.
(Signed) ____________________________
Title Subscribed and sworn before me
This ___________day of __________, 2026
Title
My commission expires____________
CORPORATE RESOLUTION
The undersigned, being secretary of ____________________________________________________
___________________________________________________________hereby certifies that
___________________________________its __________________________is authorized to execute contracts on behalf of said corporation, and has authority to bind said corporation pursuant to the corporate minutes.
By_____________________________
Secretary
Dated___________________
(SEAL)
Q-1
TOWN OF NEW FAIRFIELD
CONTRACTOR’S QUALIFICATION STATEMENT
BID # _______________________________ DATE _______________________________
BIDDER _____________________________ TAX ID # OR SS # _____________________
Failure to complete this qualification statement, the intentional withholding of pertinent information, or the making of false statements may be considered grounds for rejection of your bid.
1. Has your organization been certified as a Locally Based Enterprise (LBE), Minority Business Enterprise (MBE), Women Business Enterprise (WBE), or Disadvantaged Business Enterprise (DBE) ?
If yes, specify category of firm:
LBE: No ____ Yes ____ - Certified by _______________________ Date __/__/__
MBE: No ____ Yes ____ - Certified by _______________________ Date __/__/__
WBE: No ____ Yes ____ - Certified by _______________________ Date __/__/__
If you answer “Yes” to any of questions 2, 3, or 4, supply details on separate sheet.
2. Has your organization or any of its affiliate firms been the subject of any of the following actions in the past five years by any government agency * :
a. been suspended, debarred, disqualified, or otherwise been declared ineligible to bid?
Yes ____ No ____
b. been barred from bidding or denied a contract as a result of failure to meet statuary affirmative action or MBE/LBE requirements? Yes ____ No ____
c. been prevented or barred from bidding for any other reason?
Yes ____ No ____
d. been denied a contract despite being the low bidder for any other reason?
Yes ____ No ____
e. had liquidated damages assessed against it upon completion of a contract?
Yes ____ No ____
f. been defaulted on any contract? Yes ____ No ____
g. had a contract terminated? Yes ____ No ____
* Government agencies include city, state and federal public agencies, quasi-public agencies, authorities and corporation, public development corporations and local development corporations.
Q-2
3. In the past five years, has your organization or any current or past key people or affiliate firms been a party to any lawsuits from public or private construction projects?
Yes ____ No ____ If “yes”, indicate in the explanation whether your organization, key people or key firms were plaintiffs or defendants.
4 . Claims and Suits: Has your organization ever failed to complete any work awarded to to it? Yes ____ No ____
5. On a separate sheet, list all comparable or larger projects your organization has in progress , giving the name of the project, owner, architect, contract amount, percent complete and scheduled completion date. Also, state total worth of work in progress and under contract. Yes ____ No ____
6. On a separate sheet, list all comparable or larger projects your organization has completed in the past five years, giving the name of the project, owner, architect, contract amount , date of completion and percentage of the cost of the work performed with your own forces.
a. State average annual amount of construction work performed during the past five years.
I certify that to the best of my knowledge the information given in response to each question is full, complete and truthful.
I acknowledge that the Town of New Fairfield (the “Town”) may, by means it deems appropriate, determine the accuracy and truth of the statements made in this application.
I recognize that all the information submitted is for the express purpose of inducing the Town to award a contract.
I authorize the Town to contact any entity named in the application for purposes of verifying the information supplied by the applicant.
Name (print) Date
Signature Title
STATE OF
SS:
COUNTY OF
________________________________________ the signer of the above statement, being sworn that the several matters stated therein are in all respects true to the knowledge of the deponent.
Sworn to and subscribed before me this ______________ day of ____________ 2026.
Notary Public
Q-3
REFERENCES
List below at least five (5) references for similar projects, including all information requested. THIS PAGE MUST BE COMPLETED. If Bidders wish to keep their references confidential, this page may be removed from the bid package and submitted with the bid in a separate sealed envelope marked “REFERENCES – CONFIDENTIAL”. The Town of New Fairfield is not responsible for maintaining the confidentiality of the references unless this procedure is followed.
1. Client
Project Address
Approximate $ Value ________________ Date Started ____________Completed _________
Contact Name ______________________________ Telephone # __________________
2. Client
Project Address
Approximate $ Value ________________ Date Started ____________Completed _________
Contact Name ______________________________ Telephone # __________________
3. Client
Project Address
Approximate $ Value ________________ Date Started ____________Completed _________
Contact Name ______________________________ Telephone # __________________
4. Client
Project Address
Approximate $ Value ________________ Date Started ____________Completed _________
Contact Name ______________________________ Telephone # __________________
5. Client
Project Address
Q-4
Approximate $ Value ________________ Date Started ____________Completed _________
Contact Name ______________________________ Telephone # __________________
6. Client
Project Address
Approximate $ Value ________________ Date Started ____________Completed _________
Contact Name ______________________________ Telephone # __________________
Company
Street
City, State, Zip
Appendix H
BID BOND
KNOW ALL MEN BY THESE PRESENTS, that we, the undersigned_________________________________________
________________________________as Principal;
and____________________________________________________ as Surety are hereby held and firmly bound unto the Town of New Fairfield in the penal sum of for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, our heirs, executors, administrators, successors, and assigns.
Signed this ___________________day of _______________________________________.
The condition of the above obligation is such that whereas the Principal has submitted to the Town of New Fairfield a certain Bid, attached hereto and hereby made a part hereof, to enter into a Contract in writing, for______________________________________________________________________________________.
NOW, THEREFORE,
(a) If said Bid shall be rejected, or, in the alternate
(b) If said Bid shall be accepted and the Principal shall execute and deliver a contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a bond for his faithful performance of said Contract and shall in all other respects perform the agreement created by the acceptance of said Bid.
Then, this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its bond shall be in no way impaired or affected by any extension of the time within which the Principal may accept such Bid;
and said Surety does hereby waive notice of any such extension.
IN WITNESS WHEREOF, The Principal and the Surety have hereunto set their hands and seals, and such of them as are corporations having caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above.
__________________________________(L.S.)
Principal
Surety
By________________________________
4 Brush Hill Road
New Fairfield CT 06812
PROPOSAL FORM
Bid Number: 2026-27PWD3 Issued: November 20, 2026 Date of Bid Opening: January 8, 2027 Time of Bid Opening: 11AM Location of Bid Opening: Town Hall Conference Room, 4 Brush Hill Road, New Fairfield, CT Pre-Bid Conference: December 11, 2026 at 10 AM, Town Hall Conference Room, 4 Brush Hill Road, New Fairfield, CT.
Summary of Description of Proposal: New Fairfield Downtown Sidewalk and Streetscape Improvements II
DATE: _____________________________
PROPOSAL OF (Co. Name): _________________________________________________________
ADDRESS: _____________________________________________________________________
PHONE NUMBER: ________________________________________________________________
FAX NUMBER: ___________________________________________________________________
To furnish all labor, materials except as noted, tools and appliances required to complete the above noted project in accordance with and in conformity with the bid documents.
In accordance with the Legal Notice request for bids for the construction of the above noted project, the following bid is submitted:
_____________________________________________________________________ DOLLARS AND ______________________________________________________CENTS ($___________________)
TOTAL: __________________________________
I/We Hereby Certify that ______________________________________ the only person or persons interested in this proposal as principals, that it is made without collusion or connection with any person, firm or corporation;
that an examination has been made of the specifications and contract form contained herein, also, the plans on file in the Public Works Department and site of the work, and ______________________________ propose to furnish all necessary equipment, tools, labor and other means of construction, and to furnish all materials specified in the manner and at the time prescribed _________________________________________ and understand that the quantities of work as shown herein are relative to proposed installation. X percent (X%) Bid Bond is enclosed and affirmative action certification attached, and references listed below.
Signed: ______________________________________________
Item No. Unit Quantity Unit $ Numerical Cost Written Cost : Dollars and Cents
0201001 LS 1
0201211 EA 4
0201214 EA 4
0201322 EA 11
0202483 LF 538
0202530 CY 222
0202502A SY 183
0202503 LF 646
0202529 LF 2700
0202529A LF 5000
0202533 LF 89
0213000 CY 311
0219003 LF 1710
0219011 EA 10
0406001 TON 7
0406001 TON 150
0406001 TON 60
0406128 SY 266
0406194 LF 3259
0409004 SY 823
0601331A EA 10
0653100 LF 100
0814001A LF 89
0812001A-1 LF 628
PROPOSAL BID SHEET
New Fairfield Downtown Sidewalk and Streetscape Improvements II
New Fairfield, Connecticut Project Number L0900002
Removal of Bit Conc pavement
Item
Clearing and Grubbing Remove and Stockpile Existing Signs Reset Existing Signs Remove and Stockpile Existing Benches Removal of Bituminous Concrete Curb
DATE:
SUBMITTED BY:
Joint and Crack Sealing
Removal of Concrete Pavers Removal of Concrete Curb Cut Bituminous concrete pavement Cut edges of Bit. Conc. Pavement at 45 degree angle Remove/ stockpile Belgian Block curb
Sedimentation Control System Filter Fabric Fence Granular Fill
Sedimentation Control System at Catch Basin Bituminous Concrete HMA SO.375-3" Bituminous Concrete HMA SO.375-2" Bituminous Concrete HMA SO.5-2" Bit Conc Patching Full Depth
Fine milling of Bit Conc (0-4") Reset existing benches with concrete pad Clean Existing Drainage System- Culvert 12-42" Reset Belgian Block Curb Concrete Curb
0812001A-2 LF 182
0815001 LF 411
0915000A-1 LF 657
0915000A-2 EA 1
0921002A-1 SF 778
0921002A-2 SF 1140
0921024A-1 SF 106
0921024A-2 SF 1644
0921048 SF 169
0922001 SY 56
0922005A-1 SF 350
0922005A-2 SF 17247
0944001A SY 1407
0950005A-1 SY 1900
0950005A-2 SF 3127
0970006 Estimate 1 $ 115,000.00 $ 115,000.00 One Hundred Fifteen Thousand Dollars
0970007 HR 900
0971001 LS 1
0975004 LS 1
0977001 EA 50
0978002 EA 30
0980002 LS 1
1001001 LF 465
1001004 CY 20
1003892A EA 6
1003902 EA 6
1003907 EA 6
1003912 EA 6
1008127 LF 465
Trenching and Backfilling Rock in trench Excavation 0-4" deep
Bit Conc Driveway
High Concrete Curb Bituminous Concrete Lip Curbing Tree Protection - Cribbing Tree Protection- Armoring
Conc Paver Walk on New Base Conc Pavers Walk on Existing Base
Detectable Warning Surface
Concrete Sidewalk Ramp
Furnish and Place Topsoil
Concrete Sidewalk - 8" Thick
Ornamental Light Standard Street Light Pole removal Removal Luminaire and Bracket
Turf Establishment
Bit Conc Pav't Textured and Colored - Crosswalk Bit Conc Pav't Textured and Colored - Sidewalk and Parking Areas
Turf Establishment - Erosion Control Matting- Jute
Traffic Person - Municipal Police Officer
Traffic Person - Uniformed Flagger Maintenance and Protection of Traffic
Traffic Cone Traffic Drum
Mobilization and Project Closeout
Construction Staking
Removal Concrete Light Base
3/4" PVC Conduit Schedule 80
1009232A-1 EA 6
1009232A-2 EA 1
1009232A-3 EA 6
1012010 LF 55
1012038 LF 410
1015002 LF 465
1117111A Pair 2
1209009 LF 200
1209050 SF 200
1210106 LF 300
1220011 SF 200
1204122A SF 32
Company Name:
Submitted by:
Title:
Signature:
Date:
TOTAL BASE BID
Project Sign
Remove and Replace PVC Weatherproof Junction Box
Construction Signs
Rectangular Rapid Flashing Beacon-Type B- with light and AID
Remove/Replace GFCI Exterior Outlet
Single Conductor - #8W CU Grounding Conductor - #10W CU
12" White Painted Pavement Markings
Painted Pavement Markings 16" White Epoxy Resin Pavement Markings
Remove/Replace 120 volt LED 3000K exterior uplight Single Conductor - #10W CU
TOWN OF NEW FAIRFIELD, CONNECTICUT
AND
CONSTRUCTION, INC.
CONTRACT FOR
LOTCIP FUNDED STREETSCAPE PROJECT- PHASE II
STATE NO. L090-0002
PUBLIC WORK DEPARTMENT
OFFICE OF THE TOWN ENGINEER
CONTRACT
LOTCIP FUNDED STREETSCAPE PROJECT
STATE NO. L090-0002
THIS AGREEMENT, made and entered into this ___ day of ______ month in the year Two Thousand and Twenty-Seven by and between the TOWN OF NEW FAIRFIELD, Connecticut, a municipal corporation, having its principal office at 4 Brush Hill Dr., New Fairfield, CT 06812 hereinafter designated the "Town", and ________ having its principal office at ____________ hereinafter designated the "Contractor".
WITNESSETH: That the parties to these presents, for themselves and for their successors or assigns, each in the consideration of the undertaking, promises and agreements on the part of the other herein contained, do hereby covenant, undertake, promise, and agree as set forth in the following pages:
Section 0. DEFINITIONS.
Several words frequently used in the Contract Documents shall have the following meanings:
"ADDENDA" Written or graphic instruments issued prior to the execution of the Agreement which modify or interpret the Contract Documents, Drawings and Specifications by additions, deletions, clarifications or corrections.
"BID" The offer or proposal of the Bidder submitted on the prescribed form setting forth the prices for the Work to be performed.
"BIDDER" Any person, firm or corporation submitting a Bid for the Work.
"BONDS" Bid, Performance, and Payment Bonds and other instruments of security, furnished by the Contractor and his surety in accordance with the Contract Documents.
"CHANGE ORDER" A written order to the Contractor authorizing an addition, deletion or revision in the Work within the general scope of the Contract Documents or authorizing an adjustment in the Contract Price or Contract Time.
"TOWN" shall mean the Town of New Fairfield, the subscribing party of the first part entering into this Contract, or any of its officers or employees duly authorized to act in the execution of the work covered by this contract.
"CONTRACT" shall refer to this Agreement, also to the sum total work subject to this agreement.
"CONTRACTOR" (with a Capital "C"), or a pronoun in place thereof, shall mean the subscribing party of the second part entering into this Contract, and his/her or its legal representative. For convenience, the Contractor is referred to herein as an individual.
"DRAWINGS" shall mean the Contract Drawings and all supplementary drawings furnished by the Landscape Architect pertinent or supplemental thereto, and such detail and working drawings as the Contract Documents may require the Contractor to furnish, when such drawings have been duly approved.
"LANDSCAPE ARCHITECT" or a pronoun in place thereof, shall mean the person, or his/her authorized representative, who is designated by the Town and acts as its agent in the inspection and general direction of the construction work embraced in this Contract.
"FIELD ORDER” A written order affecting a change in the Work not involving an adjustment in the contract price or an extension of the contract time, issued by the Town or its duly authorized representative to the Contractor during construction.
"HUD" shall mean the United States of America (acting through the Department of Housing and Urban Development) which (subject to the provisions of a contract for financial aid with the TOWN) has agreed to purchase certain obligations of the TOWN to aid in financing the work to be performed under the Contract. However, nothing contained in the Contract shall be construed to create any contractual relationship between the Contractor and HUD.
"MATERIAL” (or "materials") shall mean all the things of any kind, nature, and class as may be specified which become a part of or are used in the construction of the work, together with all manufactured or prepared materials, articles, equipment, accessories, appliances, appurtenances, supplies, and parts used therein or placed thereon
"PHRASING” Wherever in the specifications or upon the drawings the words "directed", "required", "permitted", "ordered", "designated", "approved", or words of like import are used, it shall be understood that the direction, requirements, permission, order, designation, or approval of the Landscape Architect is intended. Wherever in the specifications the words "detailed", "noted", "shown", or words of like import are used, it shall be understood that these words mean as detailed, noted, or shown on the drawings; and where the word "specified" is used, it shall be understood to mean as specified herein.
"SHOP DRAWINGS” All drawings, diagrams, illustrations, brochures, schedules and other data which are prepared by the Contractor, a Subcontractor, manufacturer, Supplier or distributor, which illustrate how specific portions of the Work shall be fabricated or installed.
"SITE" shall mean the area or areas of ground which is the location for the performance of work.
"SPECIFICATIONS" A part of the Contract Documents consisting of written descriptions of a technical nature of materials, equipment, construction systems, standards and workmanship.
"STRUCTURES" shall mean the concrete, masonry, buildings, chambers, or other works which are to be built under this Contract, or which may be encountered in the work, and which are not otherwise classified herein.
"SUBCONTRACTOR” An individual, firm or corporation having a direct contract with the Contractor or with any other Subcontractor for the performance of a part of the Work at the site.
"SUPPLIER” Any person or organization who supplies materials or equipment for the Work, including that fabricated to a special design, but who does not perform labor at the site.
"SURETY" shall mean the person, persons, or corporate body which is bound with and for the Contractor, and which binds itself or himself for the payment of all debts pertaining to, and for the acceptable performance of, the work for which he has contracted, as more particularly set forth in the Performance and Payment Bond.
"WORK" shall mean all plant, labor, materials, supplies, the structures or parts thereof, on which work is underway or completed, equipment, rentals, insurance, Performance and Payment Bond, and other facilities and things agreed to be furnished and done by the Contractor, and necessary or proper for or incidental to the carrying out and completion of the terms of this Contract, including all shop and field tests of equipment and structures, operation of equipment, and maintenance for one year.
Section 1. WORK TO BE PERFORMED.
Supply labor and/or equipment per proposal from Construction, Inc., as Contractor, dated January 8, 2027, attached hereto and incorporated herein as Exhibit 1, to complete the work related to the Streetscape Project for a Total Cost of $00, per the bid No. 2026-27PWD3 received on January 8, 2027.
Section 2. TIME OF BEGINNING AND COMPLETING WORK. The Contractor shall begin operations under this contract upon a date to be specified in a written order (Notice to Proceed) from the Town Engineer and the Contractor shall fully complete all work hereunder by no later than 120 calendar days from the notice to proceed. Should the Contractor be delayed in the execution of the contract by any valid causes beyond his control, such as Acts of God, fire, flood or other causes deemed valid by the General Supervisor, the Contractor may submit a claim for an extension of the prescribed time limit. To receive consideration, such claim or claims shall be filed in writing, with a full statement of the reasons therefor, within seven (7) days of the occurrence of the delay. The decision of the Town Engineer regarding extension of time will be final. Such Extension of Time, if granted, is considered to be non-compensable unless specifically approved by the Town after review of the proof of damage to the Contractor.
TIME OF THE ESSENCE. In as much as the provisions of this Contract relating to the time for performance and completion of the work are for the purpose of enabling the Town to proceed with its normal economic life and are to minimize damage to the safety and welfare of the people of the Town, such provisions are of the essence of this Contract.
CONTRACTOR’S SCHEDULE AND PHASING. Upon the signing of this contract, the contractor has 14 calendar days to submit a detailed project schedule showing all work that needs to be performed with an associated time frame to complete that work. In addition, and within the same 14 days, the contractor must provide a phasing plan for the project showing how the contractor will be executed. Both of these are subject to the Town’s review and approval.
EXTENSIONS OF TIME: NO WAIVER. If the Contractor shall be delayed in the completion of his work by reason of unforeseeable causes beyond his control, and without his fault or negligence, including but not restricted to, acts of God or of the public enemy, acts or neglect of the Town, acts or neglect of any other contractor, fires, flood, epidemics, quarantine restrictions, strikes, riots, civil commotion, or freight embargoes, the period specified herein above for completion of his work may be extended by such time as shall be fixed by the Town. No such extension of time shall be deemed a waiver by the Town of its right to terminate the Contract for abandonment or delay by the Contractor as herein provided or relieve the Contractor from full responsibility for performance of his obligations hereunder.
Section 3. TOWN, CONTRACTOR. AND TOWN ENGINEER DEFINED.
Whenever the words defined in this section occur in this contract and in the specifications, they shall have the meaning given below:
TOWN: The word "Town" shall mean the Town of New Fairfield, CT.
CONTRACTOR: The word "Contractor" shall mean the party above, designated as the responsible party contracted to execute the proposed work.
TOWN ENGINEER: The word "Town Engineer" shall mean the Town Engineer for the Town of New Fairfield, CT, or his/her authorized agent which includes but is not limited to the design professional working for the Town.
Section 4. TOWN ENGINEER TO DETERMINE. It is agreed by the parties to this contract that the Town Engineer or his agent for the Town shall in all cases determine the amount and character of the work to be done and to be paid for under this agreement, the quality and acceptability of the materials to be used therein, and shall decide all questions that may arise relative to the intent and fulfillment of this contract. His/Her estimate and decisions shall be final and conclusive and shall be a condition precedent to the right of the Contractor to receive any payments under this agreement.
Section 5. ABSENCE OF CONTRACTOR. Whenever the Contractor is not present at the work when it may be desired· to give instructions, orders may be given by the Town Engineer, or his agent, to the superintendent or foreman who may have charge of the work at the time, and he shall receive and obey such orders forthwith.
Section 6. DISCREPANCIES, ERRORS AND OMISSIONS. The plans and specifications are intended to be explanatory of the work to be done and of each other, but should any discrepancies, errors or omissions appear they shall be subject to correction and interpretation by the Town Engineer thereby defining and fulfilling the intent of this contract. If any part of the work is omitted in the specifications, whether intentionally or otherwise, when the same is clearly shown or indicated on the drawings, or is usually and customarily required to complete fully such work as is specified herein, the Contractor will not be entitled to extra compensation, but the said fixtures or work, or both, shall be installed or done the same as if called for both by the drawings and by the specifications.
Section 7. ALTERATIONS. The Town Engineer may make alterations in the line, grade, plan, form, dimensions, or materials of the work or any part thereof, either before or after the commencement of construction. If such alterations increase or diminish the quantity of work to be done, adjustment for such increase or decrease shall be made at the unit prices stipulated for such work under this contract, except that if unit prices are not stipulated for such work, compensation for increased work shall be made under the item for Extra Work, and for decreased work the Contractor shall allow the Town a reasonable credit as determined by the Town Engineer. If such alterations diminish the quantity of work to be done, they shall not warrant any claim for damages or for anticipated profits on the work that is dispensed with. NO Change in the unit price will be allowed regardless of the level of change in the quantity for that item. The 25% limit on change to the item quantity allowing for a renegotiation of that unit price is NOT applicable to this contract.
Section 8. OBLIGATIONS OF CONTRACTOR. The Contractor shall do all the work and furnish all the materials, equipment, tools, and appliances necessary or proper for performing and completing the work required by this contract within the allowed time. He/Her shall complete the entire work to the satisfaction of the Town Engineer and in accordance with the plans and specifications forming a part of this contract and the directions of the Town Engineer as given during the progress of the work, at the prices agreed upon and fixed therefor.
The Contractor shall conduct his/her work so as to interfere as little as possible with private business and public travel. He/Her shall, at his/her own expense (except as provided in the General Specifications in respect to traffic officers) whenever necessary or required, maintain fences, furnish watchmen, maintain lights, and take such other precautions as may be necessary to protect life and property.
The Contractor shall take responsibility for the work done under this contract, for the supervision and protection of the work, and for the prevention of injuries to persons and damage to property and utilities on or about the work.
Section 9. COMPETENT AND SUFFICIENT WORKERS. Sufficient and competent workers shall be employed by the Contractor to complete the work in the specified time. If, in the opinion of the Town Engineer, the Contractor shall employ personnel who are incompetent or unfaithful in the performance of the work, they shall be removed from the job at the request of the Town Engineer.
Section 10. EXAMINATION OF WORK. The Town Engineer shall be furnished with every reasonable facility for ascertaining that the work is in accordance with the requirements and intention of this contract, even to the extent of uncovering or taking down portions of finished work. Should the work thus exposed or examined prove satisfactory, the uncovering or taking down and replacement of material and rebuilding of the work shall be considered as extra work unless the original work was done in the absence of the Town Engineer or his/her agent without his/her written authorization. Should the work exposed or examined prove unsatisfactory, the uncovering, taking down, replacing, and making good, shall be at the expense of the Contractor.
Section 11. REJECTED MATERIALS AND DEFECTIVE WORK. Materials of whatever kind furnished by the Contractor and condemned by the Town Engineer as unsuitable or not in conformity with the specifications shall forthwith be removed from the working area by the Contractor and shall forthwith be removed elsewhere in the work. Any errors, defects or omissions in the execution of the work or in the materials used in the work even though they may have been passed or overlooked or have appeared after completion of the work and discovered at any time before the final payment is made hereunder, shall be forthwith rectified and made good by and all the expense of the Contractor and in a manner satisfactory to the Town Engineer. The Contractor shall reimburse the Town for any expense, losses or damages incurred in consequence of any defect, error, omission or act of the Contractor or his employees, as determined by the Town Engineer occurring previous to the final payment.
The presence or absents of a Town Engineer during construction will in no way relieve the Contractor of his/her liability for defective work or materials. The Contractor shall repair, at his/her own expense, any defective work occurring within a period of one (1) year from the time of completion of the contract and acceptance of the work. The Contractor shall bear all losses resulting to him/her or the Town on account of the work, or because the nature of the land in or on which the work is done is different from what was expected, or on account of the weather, elements or other causes.
Section 12. INSURANCE. The CONTRACTOR shall not commence work under this contract until it has obtained all insurance required under this article and Section 1.03.07 of CTDOT Form 819 2024 with supplements January 2026 and such insurance has been approved by the TOWN, nor shall the CONTRACTOR allow any subcontractor to commence work on its subcontract until all similar insurance required of the subcontractor has been so obtained and approved.
This is the start of the file's text. The full file is on GovTribe.