ND704-1 795-1_PlanSet_100 Signed.pdf

PDF 30 MB Posted

Attached to
ND FLAP 704(1) AND 795(1) Magpie & Whitetail Crossings
Solicitation number
6982AF23B000030
Issued by

About this file

This document provides details on a federal contract opportunity for transportation construction projects. The solicitation number 6982AF23B000030 issued by the Department of Transportation Federal Highway Administration is for the ND FLAP 704(1) AND 795(1) Magpie & Whitetail Crossings projects. Offerors are invited to submit proposals to perform construction work including building new road crossings over the Magpie Creek and Whitetail Creek in North Dakota. The file attached is a 30MB set of project plans. Proposals are due on an unspecified date. The award date and any other contractual terms are not included in this document.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SIGNED AGENCY APPROVAL LETTER

DATED JUNE 13TH, 2023

CURTIS R SCOTT Digitally signed by CURTIS R SCOTT Date: 2023.08.21 17:44:11 -06'00'

Sheet and Description

S1-S19 B5 B6 B7 B8 B9 B10 B11

Bridge Sheets

Grading Summary -

Sch A

Surfacing Summary -

Sch A

Misc Summary -

Sch A

Grading Summary -

Opt X

Surfacing Summary -

Opt X

Drainage Summary -

Opt X

Misc Summary -

Opt X Allowance Bid

Schedule

A0100 15101-0000 MOBILIZATION LPSM ALL

A0120 15214-1000 SURVEY AND STAKING, BRIDGE LPSM All ALL

A0140 15225-0000 SLOPE, REFERENCE, AND

CLEARING AND GRUBBING CONTROL MILE 0.258 0.002 0.260

A0160 15236-2000 SURVEY CONTROL, GRADE

FINISHING MILE 0.258 0.002 0.260

A0180 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL

A0200 15401-0000 CONTRACTOR TESTING LPSM ALL

A0220 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

A0240 15701-0000 SOIL EROSION CONTROL LPSM ALL

A0260 15720-0000 STORM WATER POLLUTION

PREVENTION PLAN LPSM ALL

A0280 20101-0000 CLEARING AND GRUBBING ACRE 2.20 0.30 2.50

A0300 20420-0000 EMBANKMENT CONSTRUCTION CUYD 9,688 487 10,175

A0320 20803-0000 STRUCTURAL BACKFILL CUYD 30 30 Contract Quantity

A0340 20820-0000 DEWATERING LPSM All ALL

A0360 25101-2300 PLACED RIPRAP, METHOD B,

CLASS 3 CUYD 550 50 600

A0380 30202-2100 ROADWAY AGGREGATE, METHOD 2,

SURFACE COURSE TON 1,170 60 1,230

A0400 55101-2200 STEEL PIPE PILE, IN PLACE

(24" dia. x 3/4") LNFT 213 27 240

A0420 55101-2200 STEEL PIPE PILE, IN PLACE

(18" dia. x 1/2") LNFT 175 25 200

A0440 55104-1000 DYNAMIC PILE LOAD TEST EACH 4 4

A0460 55201-0200 STRUCTURAL CONCRETE, CLASS A Contract Quantity

(AE) CUYD 186 186

A0480 55401-2000 REINFORCING STEEL, EPOXY Contract Quantity

COATED LB 33,000 33,000

A0500 55601-1100 BRIDGE RAILING, STEEL, TWO Contract Quantity

RAIL LNFT 250 250

A0520 56401-1000 BEARING DEVICE, ELASTOMERIC EACH 6 6 Contract Quantity

A0540 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2,

CLASS A STEEL POSTS LNFT 150 25 175

A0560 61702-1500 TERMINAL SECTION, TYPE MGS

TANGENT EACH 4 4

A0580 61707-0000 STRUCTURE TRANSITION RAILING LNFT 100 100 Contract Quantity

A0600 62201-0200 DUMP TRUCK, 8 CUBIC YARD

MINIMUM CAPACITY HOUR 20

MileStone: 100% Estimate Date Completed: In Progress Report Date: 06/13/23

A M E N D

Line Item No.

Pay Item Number

SUMMARY OF QUANTITIES - Schedule A

-J un

-2

7:

A

M

Remarks and/or Determination of Estimated

Quantity Pay Item Description Unit

Estimated Quantities

N

N D

\7

(1 )7

(1

R oa dw ay

\C A D

D _S he et s\ B -S um m

4( 1)

5(

1) _S

O Q

_1

.x ls m

]S he et

PROJECT

B1ND FLAP 704(1) & 795(1)

MAPGPIE & WHITETAIL

SHEET

NUMBER

Bridge Sheets

Grading Summary -

Sch A

Surfacing Summary -

Sch A

Misc Summary -

Sch A

Grading Summary -

Opt X

Surfacing Summary -

Opt X

Drainage Summary -

Opt X

Misc Summary -

Opt X Allowance Bid

Schedule

A0620 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT

MINIMUM RATED CAPACITY

BUCKET, 24-INCH WIDTH HOUR 20

A0640 62201-0950 WHEEL LOADER, 3 CUBIC YARD

MINIMUM RATED CAPACITY HOUR 20

A0660 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC

YARD MINIMUM CAPACITY HOUR 20

A0680 62301-0000 GENERAL LABOR HOUR 40

A0700 62302-1000 SPECIAL LABOR, HIRED

TECHNICAL SERVICES HOUR 20

A0720 62302-1100 SPECIAL LABOR, HIRED SURVEY

SERVICES HOUR 20

A0740 62406-0300 PLACING CONSERVED TOPSOIL,

4-INCH DEPTH ACRE 1.10 0.10 1.20

A0760 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 1.1 0.1 1.2

A0780 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 1.1 0.1 1.2

A0800 63301-0000 SIGN SYSTEM EACH 2 2

A0820 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL

-J un -2

7:

A M

MileStone: 100% Estimate Date Completed: In Progress Report Date: 06/13/23

N

N D

\7

(1 )7

(1

R oa dw ay

\C A D

D _S he et s\ B -S um m

4( 1)

5(

1) _S

O Q

_1

.x ls m

]S he et

2) SUMMARY OF QUANTITIES - Schedule A

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated

Quantity

PROJECT

B2ND FLAP 704(1) & 795(1)

MAPGPIE & WHITETAIL

Bridge Sheets

Grading Summary -

Sch A

Surfacing Summary -

Sch A

Misc Summary -

Sch A

Grading Summary -

Opt X

Surfacing Summary -

Opt X

Drainage Summary -

Opt X

Misc Summary -

Opt X Allowance Bid

Schedule

X0100 15101-0000 MOBILIZATION LPSM ALL

X0120 15215-5000 SURVEY AND STAKING, BOX

CULVERT EACH 1

X0140 15225-0000 SLOPE, REFERENCE, AND

CLEARING AND GRUBBING CONTROL MILE 0.142 0.142

X0160 15236-2000 SURVEY CONTROL, GRADE

FINISHING MILE 0.142 0.142

X0180 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL

X0200 15401-0000 CONTRACTOR TESTING LPSM ALL

X0220 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

X0240 15701-0000 SOIL EROSION CONTROL LPSM ALL

X0260 15720-0000 STORM WATER POLLUTION

PREVENTION PLAN LPSM ALL

X0280 20101-0000 CLEARING AND GRUBBING ACRE 1.18 0.04 1.22

X0300 20401-0000 ROADWAY EXCAVATION CUYD 1,481 149 1,630

X0320 25101-2200 PLACED RIPRAP, METHOD B,

CLASS 2 CUYD 57 13 70

X0340 30202-2100 ROADWAY AGGREGATE, METHOD 2,

SURFACE COURSE TON 705 35 740

X0360 60103-0000 CONCRETE, HEADWALL (HEADWALLS

AND WINGWALLS, DOUBLE BARREL) EACH 2 2

X0380 60220-4150 12 FEET SPAN, 10 FEET RISE

PRECAST REINFORCED CONCRETE

BOX CULVERT LNFT 68 68

X0400 62201-0200 DUMP TRUCK, 8 CUBIC YARD

MINIMUM CAPACITY HOUR 20

X0420 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT

MINIMUM RATED CAPACITY

BUCKET, 24-INCH WIDTH HOUR 20

X0440 62201-0950 WHEEL LOADER, 3 CUBIC YARD

MINIMUM RATED CAPACITY HOUR 20

X0460 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC

YARD MINIMUM CAPACITY HOUR 20

X0480 62301-0000 GENERAL LABOR HOUR 40

X0500 62302-1000 SPECIAL LABOR, HIRED

TECHNICAL SERVICES HOUR 20

X0520 62302-1100 SPECIAL LABOR, HIRED SURVEY

SERVICES HOUR 20

X0540 62406-0300 PLACING CONSERVED TOPSOIL,

4-INCH DEPTH ACRE 0.6 0.1 0.7

-J un -2

7:

A M

MileStone: 100% Estimate Date Completed: In Progress Report Date: 06/13/23

N

N D

\7

(1 )7

(1

R oa dw ay

\C A D

D _S he et s\ B -S um m

4( 1)

5(

1) _S

O Q

_1

.x ls m

]S he et

3) SUMMARY OF QUANTITIES - Option X

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated

Quantity

PROJECT

B3ND FLAP 704(1) & 795(1)

MAPGPIE & WHITETAIL

Bridge Sheets

Grading Summary -

Sch A

Surfacing Summary -

Sch A

Misc Summary -

Sch A

Grading Summary -

Opt X

Surfacing Summary -

Opt X

Drainage Summary -

Opt X

Misc Summary -

Opt X Allowance Bid

Schedule

X0560 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 0.6 0.1 0.7

X0580 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 0.6 0.1 0.7

X0600 63301-0000 SIGN SYSTEM EACH 1 1

X0620 63308-3000 OBJECT MARKER, TYPE 3 EACH 4 4

X0640 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL

X0660 64704-1000 MITIGATION, STREAMBED MATERIAL CUYD 61 9 70

-J un -2

7:

A M

MileStone: 100% Estimate Date Completed: In Progress Report Date: 06/13/23

N

N D

\7

(1 )7

(1

R oa dw ay

\C A D

D _S he et s\ B -S um m

4( 1)

5(

1) _S

O Q

_1

.x ls m

]S he et

4) SUMMARY OF QUANTITIES - Option X

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated

Quantity

PROJECT

B4ND FLAP 704(1) & 795(1)

MAPGPIE & WHITETAIL