Rehabilitation of the 9th and 10th St Bridges over the SW Freeway

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

d.

District Department of Transportation

Rehabilitation of 9th and 10th Street Bridges

DC DEPARTMENT OF TRANSPORTATION (DDOT)

REHABILITATION OF THE 9TH AND 10TH STREET BRIDGES OVER

SW FREEWAY

DC DEPARTMENT OF TRANSPORTATION (DDOT)

REHABILITATION OF THE 9TH AND 10TH STREET BRIDGES OVER

SW FREEWAY

Rehabilitation of 9th and 10th Street Bridges

Project OverviewProject Overview

• Rehabilitation of 9th St. Bridge (Bridge #1107) and Girder

Repairs of 10th St. Bridge (#1108) Over Southwest Freeway

10th St.

9th St.

Ramp “C” Ramp “M”

Rehabilitation of 9th and 10th Street Bridges

Project OverviewProject Overview

• DDOT Resident Engineer (DRE)

– Deinma Jamabo

• DMJM Harris Project Engineer (PE)

– Joseph Chukwueke

• Federal-Aid Project

• 365 Calendar Days

Rehabilitation of 9th and 10th Street Bridges

9th Street Bridge9th Street Bridge

• Replacement of Bridge Deck

– Bridge Closed During Reconstruction

• New Bearings and Sole Plates

• Bearing Seat Modifications

• New Approach Slabs

• Milling and Resurfacing of Approach Pavement

Rehabilitation of 9th and 10th Street Bridges

9th Street Bridge9th Street Bridge

• Replacement of Barrier and Railing

• Clean and Paint Structure

• Install New Lighting

• Rehabilitation of Electrical Control Room – Mechanical, Plumbing and Electrical Modifications

• Slab Repairs of WASA Pumping Station

• Pavement Markings, Signage, Inlets, and Utility Adjustments

Rehabilitation of 9th and 10th Street Bridges

Ramps “M” and “C”Ramps “M” and “C”

• Replace Joints

• Rehabilitation of Identified Bearing Seats

• Replace Identified Bearings

• Clean and Reset Bearings, Sole Plates, Pins

• Clean and Paint Railings and Galvanized Structures

Rehabilitation of 9th and 10th Street Bridges

10th Street Bridge10th Street Bridge

• Girder Repairs G-5 and G-11

• Replace Fascia Parapet Panels

• Clean and Paint Structure

Rehabilitation of 9th and 10th Street Bridges

Rapid Deployment Equipment Train

Rapid Deployment Equipment Train

Rehabilitation of 9th and 10th Street Bridges

Rapid Deployment in OperationRapid Deployment in Operation

Rehabilitation of 9th and 10th Street Bridges

Deteriorated Bridge Steel Members

Deteriorated Bridge Steel Members

Rapid Deployment SectionRapid Deployment Section

Setting up ContainmentSetting up Containment

Rehabilitation of 9th and 10th Street Bridges

Maintenance of TrafficMaintenance of Traffic

• 9th Street will be closed with Detour

• Ramp C and Ramp M may temporary be closed from 9pm to 5am on weekday.

• Also on weekends from 8pm – Friday to 5am Monday.

• But both will not be closed at the same time.

Rehabilitation of 9th and 10th Street Bridges

Contact InformationContact Information

• Website:

www.dcgetinvolved.com/910streetbridges

• Hotline:

(202) 561-3700

Questions?

http://www.dcgetinvolved.com/910streetbridges

Project Overview
Project Overview
9th Street Bridge
9th Street Bridge
Ramps “M” and “C”
10th Street Bridge
Rapid Deployment Equipment Train
Rapid Deployment in Operation
Deteriorated Bridge Steel Members
Rapid Deployment Section
Setting up Containment
Maintenance of Traffic