SF30 Amendment 0001 NCNJ50002300540.pdf
PDF 233 KB Posted
- Attached to
- NOAA NOS OCS Uncrewed System Support Vessel
- Solicitation number
- NCNJ50002300540
About this file
This document is an amendment to a solicitation for an uncrewed system support vessel for the National Oceanic and Atmospheric Administration. The amendment provides responses to questions from industry regarding the solicitation. It confirms that the quote due date remains unchanged at 2:00pm Eastern Time on July 26, 2023. The amendment clarifies that payments will not be based on milestones as specified in the solicitation. It also confirms that a vessel measuring 28 feet bow to transom may have a larger total length when outfitted with outboard brackets and motors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. Contract ID Code Page of Pages
1305M2 1 2
2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req. No. 5. Project No. (if applicable)
0001 July 20, 2023 NC-NJ5000-23-00540
6. Issued By Code AJ930073 7. Administered By (If other than Item 6) Code SEE BLOCK 6
EASTERN ACQUISITION DIVISION
200 GRANBY STREET
NORFOLK, VA 23510
8. Name and Address of Contractor (No., Street, County, and Zip Code) (X) 9A. Amendment of Solicitation No.
X
1305M223QNCNJ0139
9B. Date (See Item 11)
July 12, 2023
10A. Modification of Contract/Order No.
N/A
10B. Date (See Item 13)
N/A
Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended X is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG-
MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT
IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting and Appropriation Data (if required)
N/A
1. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(x) A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.
B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)
Set fourth item 14, pursuant to the authority of FAR 43.103 (b)
C. This supplemental agreement is entered into pursuant to authority of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return one (1) copy to the issuing office.
14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
A. The following questions have been received by industry prior to the cutoff date of 11:00 am Eastern Time on
July 19, 2023. A response to each question is provided below:
1. Industry Questions: We request a 2-week extension to the close period so that we can respond correctly and completely? A spec such as this issued by Navy or CG would be a minimum of 30 days and more likely 45 days. I would like to point out that we build this same boat for the Navy, but over 100 units of. The data you request after changes to the base boat is somewhat excessive for a single unit, and not unlike the Navy, however they are buying 102 units. Hence the specification is adding considerable cost to your single unit purchase.
Government Response: The government declines to extend the quote due date. This is not a Navy or Coast Guard requirement. This is not a requirement for 100 or 102 units. This is a requirement for the vessel specifications and services as noted in the Performance Work Statement.
2. Industry Question: May I suggest you relax the requirements to reduce cost to NOAA.
Government Response: The government declines to change the requirements as stated in the Solicitation and the Performance Work Statement as it is the government’s need.
3. Industry Question: You include the notice of Milestones can you confirm that interim payments will be based on these milestones?
Government Response: No, payments will not be made based on the milestones. Please refer to NAM
1330-52.242-70 SUBMITTAL OF INVOICES (FEB 2011) in the solicitation.
4. Industry Question: NOAA specification states approximately 28’ bow to transom, is there room to allow for an outboard bracket/extension?
Government Response: Yes, a boat measuring 28' bow to transom may have a larger total length when outboard brackets and outboard motors are installed.
B. The due date for quotes remains unchanged at 2:00pm Eastern Time on July 26, 2023.
*****END AMENDMENT 0001*****