NCCU MTandBRITE LabSystemUpgrade Advertisement Packet-32026-CMR.pdf

PDF 3 MB Posted

Attached to
NC Central University
Solicitation number
68-32026-CMR
Issued by
Durham County, North Carolina

About this file

This Request for Proposals is issued by North Carolina Central University (NCCU), a constituent institution of The University of North Carolina System under authority of the State of North Carolina through the State Construction Office, seeking a Construction Manager-at-Risk (CMR) firm to provide preconstruction and construction management services for the Mary Townes and BRITE Complex Lab System Upgrade project. The project encompasses lab equipment replacement and infrastructure upgrades across two buildings on the active NCCU campus in Durham, North Carolina, including generator replacement, DX cooling installation, air compressor replacement, autoclave exhaust upgrades, reverse osmosis/deionized water system replacement, door actuator modifications, and associated mechanical, plumbing, electrical, and architectural work. The procurement follows a qualifications-based selection process in accordance with North Carolina General Statute 143-64.31. A mandatory pre-proposal conference and site walk-through will be held on November 16, 2026, at 10:30 AM at the Mary Townes Science Building. Electronic proposals in PDF format are due to jalles@nccu.edu by December 1, 2026, at 2:00 PM, with a short-list announcement on December 4, 2026, interviews scheduled for December 11, 2026, and Board of Trustees consideration on December 16, 2026. The contract will be structured in two phases: Phase 1 and the lab system phase are anticipated to be completed by March 2028, with Phase 2 anticipated for completion by February 2029.

The estimated construction budget for this project is $1,800,000 and is fully authorized by the Board of Governors. The Construction Manager-at-Risk Construction Management Fee will be a fixed lump sum amount reasonably negotiated between the CMR, the Owner, and the State Construction Office, structured as an all-inclusive fee covering home office, project site, and project-related costs including overhead and profit. The contract will be awarded on a Fixed Guaranteed Maximum Price basis only, with no use of preliminary guaranteed maximum pricing. Proposers must possess a minimum of five years of experience as a Construction Manager or General Contractor and hold an unlimited general contractor's license in the building classification under North Carolina General Statute Chapter 87. The submission package is limited to twenty double-sided pages in 8.5" x 11" format and must include completed Qualifications Questionnaire responses addressing corporate history, financials, project experience, key personnel qualifications, litigation history, and project planning approaches. The Owner reserves the right to reject any and all proposals and to waive minor irregularities. No specific small business set-asides are designated; however, the CMR is required to identify and define contract packages representing at least 10 percent of the GMP as Reduced Barrier Packages to remove participation barriers for Historically Underutilized Businesses and Minority Business Enterprises as defined in North Carolina General Statute 143-128.2.

View the file

Other files

File Type Posted
NCCU MTandBRITE LabSystemUpgrades-32026-CMR.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Proposals by The State of North Carolina by and through The University of North Carolina at

North Carolina Central University

For

Construction Manager at Risk Construction Manager Services

For

Mary Townes and BRITE Complex – Lab System Upgrade

TABLE OF CONTENTS

1. Cover Sheet

2. Table of Contents

3. Advertisement

4. RFP Data Sheet

5. Qualifications Questionnaire

6. Section I – General Provisions: Proposals, Evaluations, Selection, and Award

7. Section II – General Provisions

8. Section III – General Conditions of the Contract, Form OC-15CM

Appendices (Hyperlinks)

A. Form of Contract – Preconstruction Services B. Form of Contract – Preliminary Guaranteed Maximum Price – NOT USED C. Form of Contract – Fixed Guaranteed Maximum Price D. Performance & Payment Bond Forms E. Preliminary Design Information Packet G. Non-Collusion and Non-Suspension Statement H. Rules Implementing Mediated Settlement J. CMR Matrix

SAMPLE CM AT RISK ADVERTISEMENT

North Carolina Central University (NCCU) is accepting proposals for a Construction Manager at Risk for the Mary Townes and BRITE Complex – Lab System Upgrade project until 2:00PM December 01, 2026. ONLY ELECTRONIC PROPOSALS, SENT TO jalles@nccu.edu, WILL BE ACCEPTED (PDF).

PHASE 1 AND THE LAB SYSTEM PHASE ARE CURRENTLY BEING ADVERTISED

FOR CM PROPOSALS. PLEASE SUBMIT ONE PROPOSAL FOR EACH

ADVERTISEMENT.

This project will be a Fixed GMP only.

Mary Townes and BRITE Complex – Lab System Upgrade is one phase of a multi-phase project. The first phase will focus on the hydronic plants for both buildings and BRITE HVAC replacement. The second phase will focus on Mary Townes HVAC replacement. The lab system phase will focus on replacing lab equipment and upgrading infrastructure to support the lab equipment. The Mary Townes Science Building is a 115,017-SF building constructed in 2005. Consisting of a “dry” wing and a “wet” wing, it houses general physical science, chemistry, biology, earth science, and mathematics laboratories and classrooms. The Biomanufacturing Research Institute and Technology Enterprise (BRITE) Building is a 52,000-SF building constructed in 2008. It houses health-related research laboratories and classrooms, including pharmaceutical sciences, drug discovery, biomanufacturing, and clinical research science programs. The lab system phase of this multi-phase project includes replacement of lab equipment and upgrading infrastructure needs including:

1. Replacement of both the Mary Townes and BRITE generators.

2. Provide DX cooling in the BRITE 1125 & 2115 Cold Rooms.

3. Replace the existing lab air compressor for Mary Towns and provide a new

CA riser in the flue chase.

4. Autoclave exhaust upgrades: Provide additional exhaust hoods in BRITE and

Mary Townes over autoclaves and connect to existing ductwork.

5. Remove the exhaust snorkels in rooms 2131, 2161, & 2181 in Mary Townes.

6. Provide additional off gassing ventilation for the gas storage rooms in BRITE to prevent the FA system from activating.

7. Replacement of the RO/DI system in Mary Townes. The replacement system has already been selected.

8. Replace the door actuators/closers for the atrium in Mary Townes as it pertains to the smoke evac system.

9. The mechanical and plumbing scope includes modifying existing ductwork systems and replacing the equipment noted above.

10. The electrical scope includes power system modifications to support the new air compressor, RO/DI system, and the generator replacement. Fire alarm scope is limited to the system modifications necessary to remove the pneumatic door actuators for the atrium of Mary Townes.

11. There is no anticipated fire protection scope for these modifications.

12. The architectural scope includes door hardware, ceiling removal, and wall modifications/roof penetrations to complete the scope of work in the project.

The project is located on the active North Carolina Central University campus.

NCCU will remain fully operational throughout construction, with students, faculty, staff, visitors, and campus activities occupying parts of the buildings, adjacent buildings and grounds. Heightened attention to safety, security, logistics, and communication will be required.

The contractor will be expected to maintain a secure work site at all times, minimize noise and disruption to ongoing campus operations where practical, coordinate deliveries and material staging to avoid conflicts with pedestrian and vehicular circulation, and comply with all campus access, security, and safety requirements.

Power and utility outages must be carefully planned and coordinated, as these can impact other occupied facilities on campus. Advance notification and coordination with the Owner will be required to minimize impacts to campus operations.

The successful Construction Manager at Risk should demonstrate experience collaborating with the Design Team during the design phase, renovating occupied institutional and higher education campus facilities; delivering such projects to Final Acceptance by the AHJ on-schedule (without contractor-driven delays);

coordinating work within active environments; and delivering large scale renovation projects involving existing building systems. Strong project management, proactive communication, and effective subcontractor coordination will be essential to meeting the project's objectives.

Selection of Construction Manager at Risk is anticipated by December 16, 2026.

Design Development Drawings are anticipated to be approved by the SCO in January 2027. NCCU desires to bring on a CMR now to achieve the project timeline, receive required submittal approvals, and begin construction. Phase 1 and lab system phase of construction are anticipated to be completed in March of 2028, with Phase 2 anticipated to be completed in February 2029.

Proposed Schedule Overview:

• December 2026: Phase 1 CD Submission to SCO

• January 2027: BRITE AHU equipment released

• March 2027: Lab Equipment CD Submission to SCO

• May 2027: Start Construction Phase 1 & Lab Equipment

• March 2028: Complete Construction Phase 1 & Lab Equipment

• May 2028: Start Construction Phase 2

• February 2029: Complete Construction Phase 2

The estimated construction budget is $1,800,000 and is fully authorized by the

BOG.

A Mandatory Pre-Proposal Conference & Walk through will be held on:

Conference Date: November 16, 2026 Conference Time: 10:30AM Conference Address: Mary Townes Science Building - Front Lobby

Parking is available at the Latham Parking Deck 705 E. Lawson St, Durham NC

Proposals Due electronically: December 1, 2026, by 2:00PM Short-list Announcement: December 4, 2026 Interviews: December 11, 2026 Board of Trustees Meeting December 16

In accordance with our qualifications-based selection system, Construction Managers are expected to make no contact with our campus staff, faculty, or trustees at this stage of the selection process. All questions should be directed to:

Jonathan Alles, PE NCCU Facilities Management – Capital Projects Manager 919-530-6895 jalles@nccu.edu

Contract documents including Sections I-III and Appendices A-J posted on the State Construction Office website are considered to be included in this advertisement.

The State of North Carolina reserves the unqualified right to reject any and all proposals.

https://ncadmin.nc.gov/divisions/state-construction-office/forms-documents#Tab-ConstructionManageratRiskCMRForms-7341

DATA SHEET

Item Datum Short Description of Project Mary Townes and BRITE Complex – Lab System Upgrade is one phase of a multi-phase project. The lab system phase will focus on replacing lab equipment and upgrading infrastructure to support the lab equipment.

Issuing Office North Carolina Central University

The University of North Carolina System

The State of North Carolina

(AHJ: State Construction Office)

Department, Agency/Institution, Location where the Project will be constructed

North Carolina Central University – Durham, NC

Project Overview The lab system phase of this multi-phase project includes replacement of lab equipment and upgrading infrastructure needs including:

1. Replacement of both the Mary Townes and BRITE generators.

2. Provide DX cooling in the BRITE 1125 & 2115 Cold Rooms.

3. Replace the existing lab air compressor for Mary Towns and provide a new CA riser in the flue chase.

4. Autoclave exhaust upgrades: Provide additional exhaust hoods in BRITE and Mary Townes over autoclaves and connect to existing ductwork.

5. Remove the exhaust snorkels in rooms 2131, 2161, & 2181 in Mary Townes.

6. Provide additional off gassing ventilation for the gas storage rooms in BRITE to prevent the FA system from activating.

7. Replacement of the RO/DI system in Mary Townes. The replacement system has already been selected.

8. Replace the door actuators/closers for the atrium in Mary Townes as it pertains to the smoke evac system.

9. The mechanical and plumbing scope includes modifying existing ductwork systems and replacing the equipment noted above.

10. The electrical scope includes power system modifications to support the new air compressor, RO/DI system, and the generator replacement. Fire alarm scope is limited to the system modifications necessary to remove the pneumatic door actuators for the atrium of Mary Townes.

11. There is no anticipated fire protection scope for these modifications.

12. The architectural scope includes door hardware, ceiling removal, and wall modifications/roof penetrations to complete the scope of work in the project.

Website address (URL) for posting of notices regarding this project

None. Notices will be emailed to parties requesting the RFQ packet.

Expected Date of Completion of Design

March 2027

Project Designer & Consultants

MEP (Prime): McKim & Creed

Architect : Hanbury

Cost Estimating: Starmount

Construction Manager at Risk Selection Schedule including Pre-Proposal Conference

Proposals due December 01, 2026, at 2PM electronically

Shortlist Announcement December 04, 2026

Shortlist Interviews December 11, 2026

Board of Trustees Meeting December 16

Construction Management Fee (Section II Paragraph E.2)

The Construction Management Fee will be a fixed number that will be reasonably negotiated between the CM at Risk, the Owner and the State Construction Office.

Total Project Construction Budget

Total Project Budget: $2,500,000.00 Less:

Design Fees Movable Equipment (Telecommunications Reserve) (Utilities Reserve) (Other Reserves – itemize) Owner’s Contingency Estimated Available for Construction Cost of Work Estimated Construction Management Fee Estimated CMR Contingency

Reference Documents Links to the CMAR documents are listed on the State Construction Office website under the heading NCDOA Forms and Documents, Construction Manager At Risk (CMAR) Forms.

The link to the NCDOA State Construction Office website is:

https://ncadmin.nc.gov/divisions/state-construction-office

Links to the specific CMAR documents from the State Construction website are also listed below:

• Qualifications Questionnaire SEE BELOW-included in this document

• Section I Proposals, Evaluation, Selection and Award

• Section II General Provisions

• Section III The General Conditions of the Contract, Form

OC- 15/CM

• Appendix A. Form of Contract - Pre-Construction Services

• Appendix B. Form of Contract – Preliminary Guaranteed Maximum Price

• Appendix C. Form of Contract - Fixed Guaranteed Maximum Price

• Appendix D. Performance & Payment Bond Forms

• Appendix E. Preliminary Design Information Packet

• Appendix G. RFP Affidavits

• Appendix H. Rules Implementing Mediated Settlement

• Appendix J. CMR Matrix https://ncadmin.nc.gov/divisions/state-construction-office https://www.doa.nc.gov/sco/cmr-section-i-20260707/download?attachment https://www.doa.nc.gov/sco/202677-cmr-section-ii-gen-prov/download?attachment https://www.doa.nc.gov/sco/sco-oc-15cm-2nd-ed-rev-3-20260707/download?attachment https://www.doa.nc.gov/sco/sco-oc-15cm-2nd-ed-rev-3-20260707/download?attachment https://www.doa.nc.gov/sco-cmr-appendix-pre-construction-services https://www.doa.nc.gov/sco/preliminary-gmp-contract-cmr-20260707/download?attachment https://www.doa.nc.gov/sco/preliminary-gmp-contract-cmr-20260707/download?attachment https://www.doa.nc.gov/sco/fixed-gmp-contract-cmr-20260707/download?attachment https://www.doa.nc.gov/sco/fixed-gmp-contract-cmr-20260707/download?attachment https://ncadmin.nc.gov/appendix-d-performance-and-payment-bond-forms https://ncadmin.nc.gov/media/15490/open https://ncadmin.nc.gov/media/15492/open https://ncadmin.nc.gov/media/15493/open https://ncadmin.nc.gov/media/15489/open

STATE OF NORTH CAROLINA

Qualifications Questionnaire for Construction Manager at Risk

Due Date:

Dec 01, 2026 by 2PM

** ELECTRONIC PDF SUBMISSIONS ONLY

Submitted to:

Jonathan Alles, PE NCCU Facilities Management – Capital Projects Manager 919-530-6895 jalles@nccu.edu

Project Title: Mary Townes and BRITE Complex – Lab System Upgrade

Proposer’s Name and Principal Office serving this project:

(Include Company Name and address along with the name of the contact person with telephone number and e-mail address)

Profile of Proposer:

A. Give corporate history of the company including organizational structure, years in business and evidence of authority to do business in North Carolina.

B. Provide annual workload for each of the last five (5) years; number of projects and total dollar value.

C. List projects for which the company is currently committed including name & location of each project, time frame to complete & dollar volume of each project.

D. Financials – Attach latest balance sheet and income statement if available, based on company type. Audited statements preferred. If not available, attach a copy of the latest annual renewal submission to the relevant licensing board. Indicate Dunn & Bradstreet rating if one exists. (Firms must submit financial data and may clearly indicate a request for confidentiality to avoid this item becoming part of a public record.)

E. Attach letter from Surety Company or its agent licensed to do business in North Carolina verifying proposer’s capability of providing adequate performance and payment bonds for this project.

F. List all construction projects performed by the proposer for agencies and institutions of the State of North Carolina during the past 10 years.

mailto:jalles@nccu.edu

G. Litigation/Claims. If yes to any of the questions below, list the project(s), dollar value, contact information for owner and designer and provide a full explanation with relevant documentation.

1. Has your company ever failed to complete work awarded to it? ___Yes ___No

2. Has your company ever failed to substantially complete a project in a timely manner (i.e. more than 20% beyond the original contracted, scheduled completion date)? ___Yes ___No

3. Has your company filed any claims with the North Carolina State

Construction Office within the last five years? ___Yes ___No

4. Has your company been involved in any suits or arbitration within the last five years? ___Yes ___No

5. Are there currently any judgments, claims, arbitration proceedings or suits pending or outstanding against your company, its officers, owners, or agents? ___Yes ___No

6. Has your present company, its officers, owners, or agents ever been convicted of charges relating to conflicts of interest, bribery, or bid-rigging?

___Yes ___No

7. Has your present company, its officers, owners, or agents ever been barred from bidding public work in North Carolina? ___Yes ___No

Project Experience

A. List three projects of similar size, scope and complexity performed by the proposer.

B. For each of the three projects, include specific details on the extent to which pre-construction & construction phase services were provided.

C. For the three projects listed above where CM services were provided, list the Guaranteed Maximum Price (if given), or if not given, the estimated cost provided by you, and the total cost of the project at completion.

D. For each of the three projects above where CM services were provided, compare the number of days in the original schedule with the number of days taken for actual completion.

E. For each of the three projects listed above, attach project owner references including the name, address, telephone and fax numbers, and e-mail address of the project owner representative.

Key Personnel A. List of key personnel who will be assigned to the project. Attach sworn statement that the above persons will be exclusively assigned to this project for its duration.

B. For each person listed above, list what aspects of pre-construction or construction the person will handle. For those persons who will divide their time between pre-construction and construction phases, indicate what percentage of their time will be devoted to each phase.

C. For each person listed in response to A & B above, list his/her experience with firm, other prior and relevant experience with projects of similar size and scope in construction/design, and the person’s location. Attach the resumes and references for each person listed.

D. Attach project organizational chart indicating the placement of each of the persons listed in response to A & B above.

Project Planning A. Provide a brief, overall description of how the project will be organized and managed, and how the services will be performed in both Pre-Construction and Construction Phases. Project planning that offers the same project manager for pre-construction and construction phases shall be given preference.

a. Value Engineering

b. Constructability Issues

c. Cost Model/Estimates

d. Project Tracking/Reporting

e. Request for Information (RFI) and Shop Drawings

f. Quality Control

g. Schedule and Staffing Plan

B. Describe the program (plan) that your company has developed to encourage participation by small business entities. Outline specific outreach efforts that your firm will take to recruit and select small business entities.

This the day of , 20

**COMPANY NAME**

By:

Title:

Attest:

(Corporate Seal)

VERIFICATION

I HEREBY CERTIFY THAT THE RESPONSES OF

ARE CORRECT AND TRUTHFUL TO THE BEST OF MY KNOWLEDGE AND FOR

THOSE RESPONSES GIVEN WHICH ARE BASED ON INFORMATION AND

BELIEF, THOSE RESPONSES ARE TRUE AND CORRECT BASED ON MY

PRESENT BELIEF AND INFORMATION.

This the day of , 20

**COMPANY NAME**

By:

(Corporate Seal) President Attested:

Secretary

STATE OF ____________________

COUNTY OF __________________

I, ________________________, a Notary Public in and for the County and State aforesaid, hereby certify that ___________________________ personally came before me this day and acknowledged that he/she is secretary of ________________ and that by authority duly given and as the act of the corporation, the foregoing instrument was signed in its name by its president, sealed with its corporate seal, and attested by him/herself as is secretary.

Witness my hand and official seal, this the day of , 20

Official Signature of Notary

Notary Public Notary’s Printed or Typed Name

My Commission Expires:

SCO CMR Section I July 2026 Page 1 of 5

I. SECTION I – PROPOSALS, EVALUATION, SELECTION AND AWARD

A. SUMMARY

The objective of this Request for Proposal (RFP) is for the Owner to select a

Construction Management (CM) firm at risk to provide professional construction management services during the design and the construction of the Project as described in this Request for Proposal (RFP).

1. The work of the Construction Manager-at-Risk will be performed in two phases under separate contracts for each phase. Phase I will include the pre-construction phase services and the preparation and submission of the

Preliminary Guaranteed Maximum Price (PGMP) or Guaranteed

Maximum Price (GMP). Phase II will include the bidding, award and management of numerous principal and specialty trade contracts for others to provide the actual construction of the Project. Since the Construction

Manager-at-Risk will be providing only professional services for the benefit of the Owner based on a fee for such services, this procurement will be made in accordance with provisions of North Carolina General

Statute (N.C.G.S) 143-64.31 which require that firms qualified to provide such services be selected on the basis of demonstrated competence and qualification for the type of professional service required without regard to fee and thereafter negotiate a contract for those services at a fair and reasonable fee with the best qualified firm.

2. All work performed under this contract shall be in accordance with the

General Conditions of the Contract hereinafter set as modified or supplemented by any Contract Amendments, Special Conditions, or other

Contract Documents as listed hereinafter any addenda, and other components of the Contract.

B. PRE-PROPOSAL CONFERENCE

A Pre-proposal Conference inclusive of site tour will be held as set forth on the foregoing RFP Data Sheet.

1. Should a Proposer find discrepancies in the RFP documents, or should he be in doubt as to the meaning or intent of any part thereof, he must, not later than ten (10) calendar days prior to the proposal due date, request clarification in writing from the Issuing Office, which may issue a written

Addendum to the RFP. Oral explanations or instructions will not be binding; only written Addenda may be relied upon. Any Addenda resulting from these requests, or from questions raised at the mandatory pre-proposal meeting, will be sent to all listed holders of the RFP's no later than seven (7) calendar days prior to the proposal due date.

2. Any addenda/amendments to the Request for Proposal must be acknowledged in the submitted Proposal.

SCO CMR Section I July 2026 Page 2 of 5

C. PROPOSALS

1. All proposals shall include the information requested by the Qualifications

Questionnaire. One (1) original plus two (2) copies (for a total of three

(3)) of the Proposal must be received at the issuing office as set forth on the foregoing Data Sheet in order to be considered. The proposal shall be signed in accordance with the provisions of Article 2.c. of the General

Conditions of the Contract (Section III of the RFP). The Owner reserves the right to reject either all proposals after the opening of the proposals but before award, or any proposal, in whole or part, when it is in the best interest of the Owner. For the same reason, the Owner reserves the right to waive any minor irregularity in a proposal.

2. Proposers must possess all licenses required by North Carolina law, including, at a minimum, an unlimited general contractor’s license in the building classification under N.C.G.S. Chapter 87, and shall submit proof of current licensing with their proposal.

3. If the Proposer is a joint venture firm or partnership, the Proposer must provide all identification information for all parties and all requirements for all parties (i.e., licenses, insurance, etc.) as requested. As part of the proposal submission under the category of Project Planning - General, the

Proposer must identify the responsibilities of each joint venture or partnership party with respect to the scope of services/work inclusive of the requirements for each entity based on such services as described in this

RFP document. All joint venture/partnership parties will be held responsible for the contract obligations jointly and severally.

4. Proposers should give specific attention to the identification of those portions of their proposals which they deem to be confidential, proprietary information or trade secrets, and provide any justification of why such materials, upon request, should not be disclosed by the Owner under North

Carolina public records laws. Proposals will be publicly opened.

Proposers must clearly indicate each and every section that is deemed to be confidential, proprietary or a trade secret as required by statute. It is

NOT sufficient to preface your entire proposal with a proprietary statement.

D. RESERVED

E. PROPOSAL REQUIREMENTS

1. A Proposer, to be considered, must have a minimum of five (5) years of experience as a Construction Manager or General Contractor.

Construction management experience gained by key personnel proposed for this project during previous employment in providing Pre-Construction

SCO CMR Section I July 2026 Page 3 of 5 and Construction Phase Services may be considered in meeting this minimum experience requirement.

2. Each proposer shall complete the Qualifications Questionnaire for

Construction Manager-at-Risk that is part of this Request for Proposal.

3. In the interest of cost-savings, consistency of submittals and more efficient use of time by the pre-selection committee, the submitted information should not include any extra marketing materials. The format should be in

8-1/2” x11” pages. The package length should not exceed twenty (20) double-sided pages.

F. EVALUATION

1. After the closing date for receipt of Proposals, the Owner shall open the

Proposals. An Owner’s Pre-selection Committee will evaluate the

Proposals that are timely and properly submitted.

2. The Pre-selection Committee will form a shortlist of three to six firms whose proposals, in the judgment of the committee, offer the most desirable plans for the provision of services considering, among other things, the experience, expertise, and reputation of the proposing firm, together with due consideration of proffered quality, performance and the time specified in the proposals for the performance of the contract. The

Owner reserves the right to request clarifying information from any and all

Proposers at any time during the evaluation process. All proposers will be notified in writing of those firms selected for the shortlist.

3. The Owner will receive an oral presentation from each firm that is short-listed by the Pre-selection Committee. The purposes of the presentation are to allow the Owner to meet the Proposer’s key personnel assigned to the project and to allow the Proposer to highlight aspects of selected areas of its technical proposal.

4. The Pre-selection Committee will rank the top three firms in priority order based on the selecting criteria listed below and will recommend this slate of firms to the Board of Trustees of the campus for the University of North

Carolina System and Community Colleges or to the State Building

Commission for Agencies and Departments (hereinafter: the Appropriate

Authority) for their consideration and final approval.

G. SELECTING CRITERIA

In selecting the three firms to be presented to the Appropriate Authority, the Pre-selection Committee should take into consideration in the evaluation of the proposals such factors as:

1. Workload that is fully able to accommodate the addition of this project.

SCO CMR Section I July 2026 Page 4 of 5

2. Record of successfully completed projects of similar scope without major legal or technical problems.

3. Previous experience with the Owner, a good working relationship with

Owner representatives, have completed projects in a timely manner and have performed an acceptable quality of work.

4. Key personnel that have appropriate experience and qualifications.

5. Relevant and easily understood graphic or tabular presentations.

6. Completion of CM-at-Risk projects in which there was little differences between the GMP and final cost.

7. Projects that were completed on or ahead of schedule.

8. Recent experience with project costs and schedules.

9. Construction administration capabilities.

10. Proximity to and familiarity with the area where the project is located.

11. Other factors that may be appropriate for the project.

H. CONTRACT NEGOTIATION AND AWARD

1. After the three firms have been notified of the selection action by the constituent agency or institution of the Appropriate Authority, a representative from the State Construction Office, the capital projects coordinator, and a representative from the using agency will discuss with the selected Construction Manager-at-Risk appropriate services and information about the project.

2. The State Construction Office will request in writing a detailed fee proposal for Pre-construction Services from the selected Construction

Manager-at-Risk. The State Construction Office in coordination with appropriate representatives from the Owner will attempt to negotiate a fair and equitable fee consistent with the project program and the professional services required for the specific project. In the event a fee cannot be agreed upon, the State Construction Office shall terminate the negotiations and shall repeat the notification and negotiation process with the next ranked firm on the selection list. In the event a fee cannot be agreed upon with the second-ranked Construction Manager-at-Risk, the process will be repeated with the third-ranked Construction Manager-at-Risk . If a fee still cannot be agreed upon, the Owner shall review the history of

SCO CMR Section I July 2026 Page 5 of 5 negotiations and make appropriate determinations including program adjustments so as to lead to a negotiated contract with one of the original three firms selected. Such renegotiation with the firms shall be carried out in the original selection order, or a call will be made for the Pre-selection

Committee to submit another list of three firms in priority order to the

Appropriate Authority for consideration and final approval. The negotiation process will continue until a fee has been determined that is agreed to by the State Construction Office, the Owner and the

Construction Manager-at-Risk.

3. Following successful negotiation, the Owner, by and through the State

Construction Office as the final awarding authority shall award the Pre-

Construction Services contract to authorize the Construction Manager-at-

Risk to provide the services outlined in Section II, Paragraph G of this

Request for Proposals.

At the end of the Pre-construction Phase, and in accordance with the terms and conditions of this Request for Proposal, the Construction Manager-at-Risk will ordinarily negotiate a Guaranteed Maximum Price to include Cost of the Work, Construction Manager-at-Risk Construction Management Fee, Construction

Manager-at-Risk Contingency, and the cost of Bonds and Insurance. Following successful negotiation, the Owner, by and through the State Construction Office as the final awarding authority will award the Guaranteed Maximum Price contract.

SCO CMR Section II – General Provisions July 2026 Page 1 of 17

II. SECTION II -- GENERAL PROVISIONS

A. PROJECT OVERVIEW - See RFP Data Sheet

B. OWNER’S ROLE

1. DESIGN SERVICES - The Owner has retained the Project Designer named in the RFP Data Sheet. The Project Designer will provide all design services throughout the duration of the Project. The Owner shall provide to the Construction Manager (CM) a copy of the Design Contract between the Owner and Project Designer with fee redactions. The CM shall acknowledge in writing that he has received a copy of the Design Contract.

2. DESIGNATED REPRESENTATIVE - The Owner shall designate a representative who shall be the CM’s Owner contact point during both the Pre-Construction and Construction Phases. This representative shall be the primary channel of communication to the Owner and shall act as the Owner's liaison with the CM. The Owner may designate multiple representatives responsible for defined aspects of the project and may replace or re-designate any or all representatives in the Owner’s sole discretion.

3. DECISION MAKING AUTHORITY - As defined above, the Owner includes representatives from the Agency/Institution and from the State Construction Office (SCO). In conformity with State laws and rules, the Agency/Institution, the SCO, and the Project Designer have varying duties with respect to the several decisions required in this contract. Information from the CM required or requested in aid of these decisions, and to the CM with respect to all such decisions shall be communicated either through or with the knowledge of the Owner’s designated representative. In the event of any disagreement or dispute between any members of the Project Team regarding the project, the State Construction Office shall be the final decision-making authority.

C. CONSTRUCTION MANAGER-AT-RISK CONTRACT OVERVIEW

1. The Owner is employing a Construction Manager-at-Risk contracting system to aid the Owner in the review and management of the design and construction of this project. In broad terms, the Construction Management firm selected will perform the following:

a. Pre-Construction Services run from the beginning of the Construction Manager-at-Risk contract for such services (typically the beginning of the Design Development phase established by the contract between the Owner and the Designer unless an earlier or later time is elsewhere

SCO CMR Section II – General Provisions July 2026 Page 2 of 17 specified), through the approval by the Owner of the Guaranteed Maximum Price submitted by the Construction Manager-at-Risk. Upon agreement of the Owner, Construction Manager-at-Risk and the State Construction Office, the Guaranteed Maximum Price may be submitted by the Construction Manager-at-Risk at any time after completion and approval of the Design Development Phase, but in no case later than ten (10) days after the Designer submits final construction documents to the State Construction Office for review.

b. Construction Services, with the Construction Manager-at-Risk General Conditions Services and Fee being provided on a lump sum basis, and all construction being accomplished through Principal Trade and Specialty Contractors selected as provided herein. The Owner may require, based on discussions with the Construction Manager-at-Risk and Designer, the work of the project be broken into two or more phases and require a Guaranteed Maximum Price for each phase. The use of Fast Track Contracting is not authorized.

c. The Construction Manager-at-Risk shall contract directly with the public entity for all construction; shall publicly advertise as prescribed in N.C.G.S. 143-129; and shall prequalify and accept bids from first-tier subcontractors for all construction work.

d. The requirements for the Construction Manager-at-Risk set forth in this section supplement the requirements of the General Conditions of the Contract (OC-15CM) that are included as Section III in this RFP.

D. RELATIONSHIP OF OWNER AND CONSTRUCTION MANAGER

1. While the Construction Manager-at-Risk accepts financial risk in providing a Guaranteed Maximum Price for delivery of the Project, the Guaranteed Maximum Price will contain a contingency for (or in certain circumstances may be amended because of) conditions or circumstances which a prudent Construction Manager-at-Risk could not have reasonably detected at the time the Guaranteed Maximum Price was given. Accordingly, without limiting the guaranty given by the Construction Manager-at-Risk with respect to the maximum price, the primary duties of the Construction Manager-at-Risk also include the proper and timely completion of the design and construction of the Project through the employment of the best construction management practices. The Construction Manager-at-Risk project records will be an “open book”. The Owner may attend all meetings and the Owner, or its designated auditors or accountants shall have access to all records maintained by the Construction Manager-at-Risk that relate to the project.

SCO CMR Section II – General Provisions July 2026 Page 3 of 17

E. CONSTRUCTION MANAGER-AT-RISK LUMP SUM GENERAL

CONDITIONS AND FEES

1. The Construction Manager-at-Risk Pre-Construction Phase Fee shall be an all-inclusive lump sum fee for providing all required services as hereinafter set forth for the Design Phases, established by the contract between the Owner and the Designer. The Pre-Construction Phase herein may sometimes be referred to as Design Phase.

2. The Construction Manager-at-Risk Lump Sum General Conditions Construction Phase Fee shall be an all-inclusive lump sum management fee capturing all Construction Manager-at-Risk home office, project site and project related costs, including all Construction Manager-at-Risk overhead costs and profit. This fee will be hereinafter referred to as the Construction Management Fee (CM Fee) and shall be calculated as a percentage of the Cost of the Work as stated on the RFP Data Sheet. Refer to Appendix J – Division of Project Cost Elements (CM Cost Matrix) for a complete list of Lump Sum General Conditions and Construction Phase Fee Costs.

Appendix J reflects the expected sorting of these costs. This arrangement of costs shall apply to all Construction Manager-at-Risk projects unless modified via explicit negotiations with the Owner and approved by State Construction on a per project basis.

3. A copy the Appendix J matrix, adjusted via negotiations or not, must be included with each “CMR Fee” proposal.

4. All Appendix J costs in the “Basic Fee” and “Gen Conds” columns shall be paid by the Construction Manager-at-Risk and shall not be passed down to the Principal Trade Contractors or any subcontractor.

5. The Appendix J General Conditions Construction Phase Fee breakdown is presented as a tabulated list of costs. A more detailed description of some costs and expectations is provided below:

a. CM Project staff costs – direct salary plus customary labor burden, transportation and/or subsistence, communications, computers & travel expenses related to equipment/material survey & inspections.

b. CM Mobilization – establishment of job site including office & storage trailer set-up and identification signage.

c. CM Temporary Facilities – rental of field office trailer(s) including a conference room sufficient for the project’s needs; utilities and usage costs for field office trailer(s); rental (or purchase) of field office furniture & equipment; field office telephone(s) and high speed internet connections; field office operation cost (i.e. stationary, postage shipping, equipment maintenance, etc.); temporary construction utilities (if required), Including but not limited to building wide lighting, heating

SCO CMR Section II – General Provisions July 2026 Page 4 of 17 and cooling, sewer, water, and power; small tools, storage yard rental, parking lot rental, and parking fees.

d. CM Plans/Surveys/Permits – reproduction of Construction Documents during the construction phases; surveyor’s services for project layout control only; all required permits, all appropriate contractor and equipment licenses.

e. CM Safety/Cleanup – establishment and maintenance of an on-site, project specific safety program; installation and maintenance of temporary facilities (safety barricades, partitions, ladders, stairs, safety signage, first aid, traffic control devices, etc.); daily site clean-up, trash collection and removal; maintenance of site security; site snow removal as required; temporary weather and/or dust protection as required, vehicle wash stations as may be required; fire extinguishers and fire watch as required; safety harnesses, lanyards and fall arrest equipment as required.

f. Close-out/Demobilization – final site/facility clean; final release of liens for all sub-contracts; an as-built set of drawings in hard copy to the Project Designer for preparation of record as-built drawings; multiple copies (# determined by owner) of project files and records for the Owner’s archives.

g. Quality Control – monthly SCO reports, photographs, inspection reports, logs (RFIs, submittals, change orders, etc.)

h. BIM Management – Coordination to be run and managed by dedicated CMR Staff. CMR to ensure that all major trades participate, and the model is “clash free” upon the beginning of construction. The CMR, in coordination with the designer and the provided design documents, are to provide a fully coordinated model to the designer at the end of construction for final approval. The format of this deliverable must be approved by the owner.

6. The CM, other than the reasoning identified in GS 143-128.1, must formally bid all trade work per General Statutes. Informal bidding is not allowed.

7. The cost of Bonds and Insurance as required by Article 34 of The General Conditions of the Contract shall be carried in the GMP as a separate line item, not part of the Construction Management Fee.

F. PRE-CONSTRUCTION SERVICES

1. Within 10 days of the CM receiving an executed Pre-construction agreement, the Construction Manager-at-Risk shall meet with the Owner, the State Construction Office, the Project Designer and any other design

SCO CMR Section II – General Provisions July 2026 Page 5 of 17 team members to fully understand the Program, the design documents, the Project scope and all other pertinent aspects of the Project. The State Construction Office shall assign, at its sole discretion, an individual to participate in Pre-construction meetings. The Construction Manager-at- Risk shall become an integral part of the Project Team and shall develop written project procedures in cooperation with the Owner that will be used as a guide for the management and coordination of this project throughout the life of the project.

2. Consultation During Project Development: The Construction Manager-at- Risk shall attend regularly scheduled meetings with the Project Designer and consultants during the Design Phases to advise them on matters relating to site use, improvements, selection of materials, building methods, construction details, building systems and equipment, phasing and sequencing. The Construction Manager-at-Risk shall provide written recommendations on construction feasibility.

3. Value Analysis

a. The Construction Manager-at-Risk shall provide continuous value analysis studies as the project design is developed to offer suggestions that provide the most effective in first costs as well as long term operational costs relative to issues of energy use and facility maintainability. Value analysis studies shall include life cycle cost analysis as may be required to assist the Project Designer to achieve an appropriate balance between costs, aesthetics, and function. All recommendations shall be in writing and must be fully reviewed with the Project Designer and Owner. The Owner must approve all recommendations prior to implementation.

b. Building upon the continuous efforts noted above, the Construction Manager-at-Risk shall conduct a major value analysis study at each phase after award of a pre-construction agreement and as directed by the Owner Representative (Advanced Planning Conceptual, Schematic Design, 100% Design Development, and 50% Construction Documents for example.) Analysis shall be based on the information provided by the Designer and Owner for the basis of the Project which shall include, but not be limited to, the items noted below:

1) Develop value analysis concepts for consideration in brainstorming sessions with the Design Team.

2) Written cost studies shall be produced and submitted to the Owner within two (2) weeks of the final brainstorming session. Written pro/con evaluation of the cost studies shall be provided to the Owner within two (2) weeks after

SCO CMR Section II – General Provisions July 2026 Page 6 of 17 submission of the cost studies.

3) Proposed schedule and logistics plan.

4) A formal written value analysis study document including a summary of value analysis items, applicable cost savings, selected items and their corresponding cost savings shall be presented to the Owner & Project Designer, and what the basis of materials used for site, structure, building envelope, MEP and finishes are to establish the budget.

5) The Construction Manager-at-Risk shall also conduct value analysis studies during each of the Construction Document Phases to evaluate specific items as requested by the Owner.

c. The Construction Manager-at-Risk shall promptly notify the Owner and Project Designer in writing upon observing any features in the design that appear to be ambiguous, confusing, conflicting, or erroneous.

d. If project pre-construction services are contracted with the CM during the advanced planning stage of the project, the CM will assist the Owner in completing the cost values required by the Owner in submitting the OC-25 to the State Construction Office.

4. Schedule: The Construction Manager-at-Risk shall schedule Pre- Construction Services in accordance with the design schedule established in the agreement between the Owner and Project Designer. The Construction Manager-at-Risk is responsible to monitor this schedule during the pre-construction/design phase, ensure that this schedule is updated, and advise the Owner of any deficiencies in adhering to this schedule by any party.

5. Drawing Coordination and Constructability Review

a. The Construction Manager-at-Risk shall review the design continuously throughout the Pre-Construction Phase as to constructability. With respect to each such issue, the Construction Manager-at-Risk shall submit a written report to both the Owner and the Project Designer. At a minimum, each such written report shall contain: (1) a description of the constructability issue with background information; (2) a summary of the in-depth study / research conducted by the Construction Manager-at-Risk; and, (3) written recommendations for addressing the issue.

b. The Construction Manager-at-Risk shall review the plans and specifications for features that may be ambiguous, confusing, SCO CMR Section II – General Provisions July 2026 Page 7 of 17 conflicting, or erroneous and shall notify the Project Designer and Owner in writing when such features are observed.

c. The Construction Manager-at-Risk shall provide formal constructability reviews on the 100% schematic, 100% design development, and 100% construction documents using a platform or means approved by the Owner and State Construction Office. Review shall include coordination issues, clash detections, missing items, items, or details needing more information, construction sequencing issues, scope gaps, alternative products, detail simplifications, etc. The Designer shall provide the CM and Owner with formal responses to each item using the approved platform or method.

6. Construction Cost Model / Estimates

a. The Construction Manager-at-Risk shall develop a project budget/cost model, independent from any similar cost estimates required of the Project Designer, which shall be updated as needed but at a minimum at the end of each design phase during which the Construction Manager-at-Risk is performing Pre-Construction Services (hereinafter: CM Cost Model Update.) Prior to the development of the CM Cost Model, the Construction Manager-at-Risk will meet with the Project Designer and establish a common cost estimating format so that project cost estimates prepared by the Designer and Construction Manager-at-Risk may be directly compared.

b. Each CM Cost Model Update must set forth the total construction costs for the facility. The CM, Owner, and Designer will agree on a target budget (i.e., 90% Budget, 10% Alternates for example) based on market conditions. The cost model shall include alternates, Construction Manager-at-Risk Lump Sum General Conditions and Fee, Bonds, Insurance and Contingency. Owner shall provide a list of prioritized alternates from pricing inclusions as add alternates.

c. In the event that the Project Designer’s Statement of Probable Construction Costs exceed the Amount Available for Construction, the Owner may direct the Construction Manager-at-Risk to (and the Construction Manager-at-Risk shall without additional compensation) work in conjunction with the Project Designer to redesign the facility as necessary to maintain the Project Program within the Amount Available for Construction as set forth on the RFP Data Sheet.

d. Each CM Cost Model Update and the Designer’s Probable Construction Costs will be reviewed by the Project Designer and the Owner for reasonableness and compatibility with the Amount Available for Construction. Meetings and negotiations between Owner, Project

SCO CMR Section II – General Provisions July 2026 Page 8 of 17

Designer and the Construction Manager-at-Risk will be held to resolve questions and differences that may occur between the Designer’s Probable Construction Costs and the CM Cost Model Update. The Construction Manager-at-Risk shall work with the Owner and Project Designer to reach a mutually acceptable Joint Probable Construction Cost which shall be the basis of the SCO plan review submittal package.

Designer and CM shall allow appropriate time in the initial pre-construction/design schedule for such pricing reconciliations and any required design revisions to occur prior to submitting the deliverable packages to the State Construction Office.

e. The Joint Probable Construction Cost shall detail all allowances to be carried by the CM on the project. Proposed allowances will be reviewed and agreed upon by the Owner, Designer, State Construction, and CM prior to the Construction Documents being submitted to State Construction. These allowances should be in accordance with Chapter 500 of the State Construction Manual. Cash allowances and man hour allowances are not allowed as there is no “competitive bidding” required by GS 143-129. Allowances within the bid packages shall have a unit price and quantity allowance for quantitative tracking purposes.

7. Coordination of Contract Documents

a. The Construction Manager-at-Risk shall review the plans and specification for features that may be ambiguous, confusing, conflicting, or erroneous and shall notify the Project Designer and Owner in writing when such features are observed.

b. The Construction Manager-at-Risk shall provide a thorough interdisciplinary coordination review of the Construction Drawings and Specifications submitted for review to the State Construction Office.

The review shall be performed utilizing a structured and industry accepted process by a qualified firm or personnel. The Construction Manager-at-Risk shall review the final documents to see that all comments have been incorporated.

c. All ambiguous, confusing, conflicting and/or erroneous features discovered in the plans or specifications by the Construction Manager-at-Risk during the review process shall be deemed to be corrected, and any associated costs shall be included in the Guaranteed…

This is the start of the file's text. The full file is on GovTribe.