NC-NJ5000-23-00613_BHII_Hull_Repairs_PWS_revised_24MAY2023.docx
DOCX document 27 KB Posted
- Attached to
- NOAA R/V Bay Hydro II Hull Repair
- Solicitation number
- 1305M223QNCNJ0613A
View the file
Other files
| File | Type | Posted |
|---|---|---|
| OPEN MARKET CONTRACT CLAUSES.docx | DOCX document | |
| Wage Determination 2015-4281 Rev 25.pdf | ||
| RFQ.docx | DOCX document | |
| RV Bay Hydro II As-built Drawings.pdf | ||
| Past Performance Reference Sheet.pdf | ||
| Schedule.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement Navigation Response Branch R/V Bay Hydro II Hull and Ancillary Systems Repairs
NC-NJ5000-23-00613
1.0 BACKGROUND
The National Oceanic and Atmospheric Administration’s Office of Coast Survey, Navigation Response Branch requires engineering support and repair services for the 57’ NOAA/OCS Research Vessel BAY HYDRO II, NOAA Hull Number S5401. The general specifications of the S5401 are as follows:
· Length 57 ft
· Draft 5.5 ft
· Beam 20.8 ft
· Displacement 30.1 long tons
| There is pitting in the hull of the portside tank space that exceeds allowable thresholds. The portside tank space houses one of the vessel’s air conditioner compressor units. Copper ions in condensate from the condenser coils is thought to be part of the cause for the observed pitting. |
| GENERAL REQUIREMENTS |
The contractor shall provide all necessary vessel haul-out equipment, boatyard storage, supplies, equipment, labor and engineering support to perform the services.
Work is to be accomplished at the Contractor’s facility. NOAA will deliver the vessel to the Contractor’s facility, and redelivery will also be at the Contractor’s facility.
Coordination of the work schedules will be the responsibility of the Contractor to avoid any delays or disruptions in order to meet the performance period. The Contractor will provide all facilities, labor, materials, tools, and services required to complete the work UNLESS exceptions are noted in the specified tasks below. Where parts are replaced, the Contractor will use OEM parts in all cases.
Upon arrival at the Contractor’s facility the contractor will accept full responsibility for the safety of the vessel, including but not limited to fire protection, security patrols, water-tight integrity, and protection from adverse environmental conditions, etc. This responsibility will terminate only after all work defined herein (or added during the work period) is complete, accepted by NOAA, and NOAA personnel remove the vessel from the Contractor’s facility.
NOAA employees may be working on board the vessel during the contract performance period on a not to interfere basis.
The Contractor shall ensure that all machinery and equipment used to haul the boat out of the water is fully functional, suitable for the task, rated for loads at least 20% greater than the maximum weight of the vessel, and operated by trained, competent personnel. A docking plan for the vessel is provided.
All work performed will meet or exceed all current requirements of ABYC and USCG (Subchapter T) as applicable to this size and type of vessel, in addition to any specific requirements stated below. All federal, state, and local laws and regulations shall be observed while completing this work.
All welding required as part of the tasks defined below shall be performed by certified welders working in accordance with approved welding procedures. Certifications and approvals by USCG, ABS, or another nationally recognized authority are acceptable, and copies of these certifications shall be presented to the TPOC before work begins. Any new plate used during the course of this contract shall be 5083-H116 aluminum and any extruded support structure shall be 6061-T6 or 6063-T52 aluminum alloy. Weld filler shall be 5356 or 5183. Weld throat widths shall equal the original welds. After welding, remove all smoke, soot, and oxides with a wire brush, and deburr all sharp edges.
The contractor shall select materials and fasteners to minimize reactions with the aluminum hull structure of the vessel. There shall be no brass or copper fittings or hardware in direct contact with the aluminum hull structure of the vessel. When use of dissimilar metals is required, the contractor shall isolate the dissimilar metals by using bedding compounds or other techniques standard to the industry. All parts and materials provided by the contractor shall be new.
All work performed on the vessel shall be accomplished as described below unless alternatives have been presented to NOAA in writing during the solicitation phase and approved. Any work that does not adhere to the descriptions below shall be redone at the Contractors expense within the defined period of performance.
In the event defects or damage unrelated to the work tasks defined below are discovered, the Contractor will submit a Condition Found Report (CFR) to the COR. The CFR will define the problem found, the corrective actions needed, and the cost for that work.
The Government reserves the right to award some or all deliverables defined herein. Additional work may only be added via a fully executed contract modification. Any additional work addressed in a contract modification may not begin before the contract modification is fully executed.
2.0 DELIVERABLES
01] - Haul, block, clean, store, launch Remove the vessel from the water. Pressure-wash the entire hull from sheer line to keel removing all dirt, grime, and marine growth. As the vessel is a catamaran, clean all surfaces within the tunnel. Clean all fittings below waterline, including propulsion components, struts, stern tubes, rudders, foils, fins, through-hulls, etc. Clean transducers with a non-metallic brush, taking care not to mar the emitting surface in any way.
Block the vessel in a level attitude with the keels 36” minimum off the ground in accordance with the provided docking plan (see provided As-built drawings provided in PDF format). Inspect the hull, coatings, and all attachments and report any damage or discrepancies to the NOAA COR and TPOC in writing.
As completion of all work done on the hard nears an end, notify the TPOC of intent to launch the vessel at least 24 hrs in advance. TPOC will conduct a pre-launch walk-through of the vessel. At completion of the TPOC walk-through, launch the vessel, inspect all compartments for leaks, and secure it dockside. Provide notification to the TPOC 24 hours before anticipated readiness to perform required inspections and testing. Required inspections and testing are listed in Section 3 of this document.
2] Crop the hull section under the portside tank space Remove the bottom paint system from the perimeter of the area to be cropped.
Crop out 6 sq ft of wasted ¼” aluminum plate. Area to be cropped out is 51” long starting at the bottom ½” keel plate original weld and up 16”. Repair extends beyond the forward engine room bulkhead 6” into the port engine room and 45” forward of the engine room bulkhead into the port tank space.
Provide a fire control plan that outlines the Contractor’s ability to handle any fire or emergency without the use of any NOAA vessel systems. This shall include fire watch procedures. All hot work shall be approved 24 hours in advance by the TPOC or his designated representative. All spaces designated for hot work shall be certified to be safe for hot work by an independent marine chemist.
Weld in new ¼” aluminum plating. Welds will be made on both sides of the material, back gouged to clean metal, and full penetration. Insert pieces will be 3” radius at all corners with the exception of the insert intersecting to the ½” keel plate. Seams will be positioned between 4” and 6” of structural members, and all edge seams will be aligned parallel or perpendicular to the hull centerline. Welds of new plate to existing structure will match those already in place. Remove all smoke, soot, weld splatter, oxides, and sharp edges. Dye penetration test the butt welds. Notify the TPOC of all areas that failed the test (if any) so the area(s) can be documented. After notifying the TPOC of failed welds, remove the dye from the affected area(s) and correct the welds. Again, remove all smoke, soot, weld splatter, oxides, and sharp edges and repeat the dye penetration test in the affected areas. Repeat as necessary until all welds have passed the dye penetration test.
3] - Hull preparation and paint Prep the new hull plating and the area surrounding the new plating per the paint manufacturer’s recommendations. Create a profile in the antifouling layers of paint over approximately 6 inches of additional area to expose the epoxy primer layers and facilitate feathering in the new epoxy primer coats and antifouling coats of paint once new metal has been welded into place. Bottom paint system shall consist of four primer layers of Interlux InterProtect 2000E, color gray; and three layers of Interlux Pacifica Black antifouling paint. Apply in accordance with the manufacturer’s application specifications, observing the recoat intervals based on surface temperature. Take wet film thickness measurements during application and dry film thicknesses after the final barrier coat and final antifouling coats to ensure proper coating thicknesses have been achieved.
For the rest of the vessel’s underwater hull, prepare the surfaces and apply 2 coats of Interlux Pacifica Black antifouling paint in accordance with the manufacturer’s application specifications.
3.0 TESTING AND INSPECTIONS
All deliverables shall be tested or inspected on or before the end of the period of performance. Correct identified deficiencies associated with the work performed (if any).
· Deliverable 01] Verify that the hull and underwater surfaces are free of dirt, grime, and marine growth.
· Deliverable 05] Inspect welds for voids. Verify that weld throats equal the original welds. Verify that all smoke, soot, weld splatter, oxides, and sharp edges have been removed.
· Deliverables 06] Inspect painted surfaces for areas of bubbling, incomplete coverage, poor adhesion, or damp paint. Verify appropriate dry film thickness has been achieved.
4.0 PLACE OF PERFORMANCE
The R/V Bay Hydro II is home ported in Patuxent River, Maryland, central Chesapeake Bay. All work shall be accomplished at the contractor’s facility, the boat’s home port, or a mutually agreed upon location to be determined and documented at contract award. NOAA shall deliver the vessel to the contractor’s facility or agreed upon location, and NOAA shall retrieve the vessel at the same location at the end of the period of performance. Should this work need to be performed in a location other than Patuxent River, MD, the following considerations shall be taken into account:
Deliverables shall be performed at a facility on the Chesapeake Bay or Delaware Bay and their navigable tributaries and must be within approximately 200 nautical miles (by boat) of Patuxent River, Maryland.
The port where the work is being performed should have a controlling depth of 8 feet or greater at MLLW, or should have sufficient tidal range to ensure that the boat can safely maneuver to the location where work shall be performed.
5.0 GOVERNMENT FURNISHED EQUIPMENT (GFE)
The Government will deliver the 57’ research vessel S5401 “BAY HYDRO II” to the boatyard (repair) location at a date and time agreeable to the Contractor and Government through the TPOC and COR listed in this PWS.
Fuel tanks will have residual fuel from the transit to the ship yard.
Vessel as-built drawings:
· General Arrangement Drawing (5463-110-001-A)
· Docking Plan (5463-125-001-A)
6.0 PERIOD OF PERFORMANCE
The start date is negotiable, but once work begins, work shall be completed within thirty (30) business days unless other terms have been agreed upon by both the contractor and NOAA. Extending the period of performance beyond thirty (30) business days from the start requires a fully executed modification. Such modification must be fully executed prior to the end of the initial period of performance.
7.0 TECHNICAL POINT OF CONTACT (TPOC)
Officer In Charge - R/V Bay Hydro II LTJG Jane Saunders nrt.bhii@noaa.gov 302-858-6811
8.0 CONTRACTING OFFICER’S REPRESENTATIVE (COR)
Michael Davidson Operations Manager Navigation Response Branch 1315 E West Hwy SSMC3, 6th Floor, Rm 6216 Silver Spring, MD 20910 Work Cell: 757-771-5305
9.0 INVOICING
All invoices should be sent to the TPOC and COR listed in this PWS
10.0 SECURITY REQUIREMENTS
The Assessment and Authentication (A&A) requirements of Clause 48 CFR 1352.239-72 do not apply, and a Security Accreditation Package is not required.
The contractor will not access, store, process, or transmit any government privileged information. The contractor will not have access to any non-public government information systems or networks.