NBSFS-RFI01 Facility Controls Upgrade.pdf

PDF 124 KB Posted

Attached to
NBSFS Facility Controls System Modernization
Solicitation number
NBSFS-RFI01
Issued by

About this file

This is a Request for Information (RFI) issued by the U.S. Air Force for the modernization of a Utility Monitoring and Controls System (UMCS) at New Boston Space Force Station in New Boston, New Hampshire. The RFI is designated as a 100% Small Business Set Aside under Product Service Code DA01 (IT & Telecom – Business Application/Application Development Support Services) and NAICS Code 541512 (Computer Systems Design Services).

The Government seeks vendor information regarding technical solutions, system architectures, estimated schedules, and rough-order-of-magnitude pricing for modernizing legacy facility controls infrastructure. The existing baseline includes one primary server environment, 12 supervisory-control locations, 55 BACnet field controllers (5-point, 10-point, and 20-point capacity), 30 communications enclosures, 15 thermostats or space sensors, 6,000 linear feet of BACnet MS/TP cable, 1,000 linear feet of Category 6 cable, 3 workstations, 2 technical laptops, 4 monitors, and one fuel-monitoring interface. Desired future capabilities require a complete, modern, secure, and expandable solution including primary and redundant/standby server environments with backup and failover capabilities; support for BACnet field-controller communications (BACnet/IP and MS/TP); integration of existing and future HVAC controls equipment; installation and integration of controls for one additional facility with approximately 225 control points; three compact user workstations with CAC-capable input devices; one semi-rugged technical laptop; replacement and integration of power meters; cybersecurity hardening with CAC-enabled authentication; administrator-level Government access with native and exportable configuration databases; modern graphical user interface with building-level, floor-level, equipment-level, and point-level navigation; BIM-compatible operational models supporting spatial and thermal visualization; and assessment and modernization recommendations for existing area-lighting and security-lighting controls.

Respondents must address 15 specific technical topics including proposed UMCS/BAS product line and architecture, approaches for existing systems and new facility integration, BACnet interoperability, cybersecurity and authentication, administrator access and data ownership, graphics and visualization, power-meter and fuel-monitoring integration, lighting controls assessment, estimated schedule, assumptions and exclusions, and relevant past performance on comparable projects. Pricing responses should follow a specified format with 15 base-line items (ranging from primary server environment to lighting controls assessment), 3 optional line items (five-year maintenance, lighting modernization, and additional facility integration), and 6 unit-price items (additional power meters, BACnet field controllers, control points, supervisory controllers, and communication cables). Responses must be submitted electronically in Adobe PDF format no later than 11:00 EST on January 15, 2027, addressed to Ms. Kristin Morrison at kristin.morrison.1@us.af.mil. This RFI is for market research and planning purposes only; the Government does not intend to award a contract or pay for response preparation and will safeguard proprietary information in accordance with applicable Government regulations.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION

Original Set Aside: 100% Small Business Set Aside

Product Service Code: DA01 – IT & Telecom – Business Application/Application Development Support Services

NAICS Code: 541512 – Computer Systems Design Services

Place of Performance: New Boston Space Force Station – New Boston NH

NBSFS-RFI01 - OPEN-ARCHITECTURE FACILITY CONTROLS SYSTEM MODERNIZATION

1. PURPOSE

The Government is seeking information from qualified vendors capable of providing an open-architecture Utility Monitoring and Controls System (UMCS) modernization solution.

The Government is providing the current system baseline and desired future capabilities in this request to obtain proposed technical solutions, recommended system architectures, estimated schedules, and rough-order-of-magnitude pricing.

The Government is not requesting that respondents conduct a site assessment, inventory existing equipment, or validate existing conditions as part of this RFI/RFQ response.

Respondents shall use the planning information provided in this request as the basis for their proposed solution and pricing.

The Government is not requiring a specific manufacturer, supervisory-controller platform, software platform, or field-controller product line. Respondents may propose any technically capable solution that meets the functional requirements identified below.

For RFI use: This is not a request for proposal (RFP), applications, proposal abstracts, or quotations, nor does its issuance obligate or restrict the Government to an acquisition approach. The Government does not intend to award a contract based on any responses or pay for the preparation or use of any information submitted. All information received will be used for planning and market research purposes only. Any proprietary information submitted should be marked accordingly. The Government will not be liable for or suffer any consequential damages, for any proprietary information not properly identified.

Proprietary information will be safeguarded in accordance with the applicable Government regulations.

2. EXISTING SYSTEM BASELINE

The Government currently operates a legacy facility controls environment consisting of server infrastructure, supervisory controls, BACnet field controllers, communications infrastructure, user workstations, graphical user interface capability, and related HVAC monitoring and control functions.

The following information is provided as a planning baseline for respondent solution development and pricing:

Item Description Estimated Quantity Unit

Existing primary controls-system server environment 1 EA

Existing supervisory-control locations 12 EA

Existing BACnet field controllers, approximately 5-point capacity

10 EA

Existing BACnet field controllers, approximately 10-point capacity

40 EA

Existing BACnet field controllers, approximately 20-point capacity

5 EA

Total existing BACnet field controllers 55 EA

Existing lockable communications enclosures 30 EA

Existing thermostats or space sensors 15 EA

Existing BACnet MS/TP communications cable allowance 6,000 LF

Existing Category 6 communications cable allowance 1,000 LF

Existing primary controls-system workstations 3 EA

Existing technical laptops 2 EA

Existing workstation monitors 4 EA

Existing power meters Quantity not established

EA

Existing fuel-monitoring interface 1 LS

Unit Key

Abbreviation Definition

EA Each

LF Linear Foot

LS Lump Sum

PT Control Point

The quantities above are planning estimates only. They are provided to support development of a proposed solution and preliminary pricing and do not represent a guaranteed bill of materials.

3. DESIRED FUTURE SYSTEM CAPABILITIES

The Government seeks a complete, modern, secure, maintainable, and expandable controls solution that provides the following capabilities.

3.1 Server and System Architecture

Respondents shall propose an architecture that includes:

• One primary UMCS server environment;

• One redundant or standby UMCS server environment;

• Backup, restoration, failover, and recovery capability;

• Current and supported hardware, software, and operating-system environment;

• Required software, configuration tools, programming tools, and licenses;

• Identification of all recurring support, maintenance, subscription, and renewal costs.

The proposed solution may retain, migrate, replace, or gateway-integrate legacy components, as appropriate to the respondent’s proposed architecture.

3.2 Controls and Communications

The proposed system shall support:

• BACnet field-controller communications;

• BACnet/IP and BACnet MS/TP communications, as applicable;

• Integration of existing and future HVAC controls equipment;

• Expansion capability for future facilities and additional monitoring points;

• Supervisory controller, gateway, and field-controller capacity appropriate for the proposed solution;

• Communications enclosures, battery backup, cabling, network components, and associated controls infrastructure.

3.3 New Facility Integration

The Government requires installation and integration of a complete controls solution for one additional facility.

The planning basis for this facility is approximately 200–250 control points. Respondents shall use 225 control points as the estimated quantity for pricing purposes.

The proposed solution shall include, as applicable:

• Field controllers;

• Supervisory-controller or gateway capacity;

• Sensors, actuators, thermostats, relays, and control devices;

• Control panels and associated hardware;

• Communications equipment and cabling;

• Alarms, trends, schedules, and control sequences;

• Programming, graphics, testing, commissioning, and documentation.

3.4 User Workstations and Support Equipment

The Government requires the proposed solution to include:

• Three compact user workstations;

• Three workstation monitors;

• CAC-capable keyboards or CAC readers;

• One semi-rugged technical laptop;

• Required Government-standard operating environment software, as applicable;

• Required controls-system configuration and programming tools.

3.5 Power and Monitoring Integration

The proposed solution shall include:

• Replacement and integration of power meters associated with facilities connected to the UMCS;

• Assessment and proposed integration approach for an existing fuel-monitoring interface;

• Power-monitoring data display within the proposed UMCS graphical user interface, where applicable.

Because the number of power meters is not established, respondents shall provide:

1. A planning allowance for power-meter replacement and integration; and

2. A unit price per installed and integrated power meter.

3.6 Cybersecurity and Government Network Integration

The proposed solution shall support operation within a Government network environment and shall include:

• Cybersecurity hardening;

• Support for secure patching and updates;

• CAC-enabled authentication and authorization, as required;

• Required cybersecurity documentation;

• Support for vulnerability remediation activities;

• Support for Risk Management Framework and authorization activities;

• Technical coordination with Government cybersecurity personnel;

• Identification of all required cybersecurity software, hardware, licenses, subscriptions, gateways, and interfaces.

3.7 Government Access and Vendor Independence

The Government requires full administrative and operational access to the installed system.

Respondents shall describe how their proposed solution will provide the Government with:

• Administrator-level access;

• Native and exportable configuration databases;

• Backup and restoration files;

• Programming and configuration tools;

• Required licenses for Government operation and maintenance;

• Graphical user interface source files;

• Point lists, sequences of operation, alarms, trends, and schedules;

• Network and system diagrams;

• Operations and maintenance documentation.

Respondents shall identify all proprietary elements of the proposed solution and explain any limitations on Government ability to operate, configure, maintain, back up, restore, modify, or expand the system.

3.8 Graphical User Interface and Visualization

The proposed system shall provide a modern graphical user interface with:

• Installation-level or campus-level navigation;

• Building-level, floor-level, equipment-level, and point-level navigation;

• System one-line diagrams;

• Equipment graphics;

• Floor-plan graphics;

• Real-time values, equipment status, alarms, setpoints, overrides, trends, schedules, and communication status;

• Color-coded alarm and status indications;

• Spatial visualization capability;

• Color-coded room or zone thermal visualization; and

• Power-meter data display, where applicable.

The Government seeks graphics that provide significantly greater detail, usability, and operational visibility than those available in the current system.

3.9 Building Information and Spatial Visualization

The Government desires a field-verified, BIM-compatible operational model to support the graphical user interface, floor plans, equipment views, spatial visualization, and thermal visualization.

The desired model is not a complete architectural BIM model. The expected model should support, at a minimum:

• Building floor layouts;

• Room and mechanical-space boundaries;

• Major equipment locations;

• Major controls-system components;

• Applicable HVAC zones;

• Power-meter locations;

• Point-to-graphic associations; and

• Live controls-system data display by room, zone, or equipment location.

Respondents shall identify their proposed method, deliverables, assumptions, and cost for providing this capability.

3.10 Lighting and Security Lighting Controls

The Government requires an assessment and modernization recommendation for existing area-lighting and security-lighting controls.

The base requirement includes:

• Existing-condition assessment;

• Recommended modernization approach;

• Proposed control architecture;

• Monitoring and status approach;

• Cybersecurity considerations;

• Potential future UMCS integration approach;

• Implementation phasing;

• Anticipated outages and risks; and

• An itemized modernization estimate.

Lighting-control modernization, new lighting monitoring, and new UMCS integration are not included in the base requirement. Respondents shall provide these as a separately priced option.

4. REQUESTED TECHNICAL RESPONSE

Respondents shall provide a written response addressing the following:

1. Proposed UMCS/BAS product line, manufacturer, and system architecture.

2. Proposed approach for the existing controls-system baseline.

3. Proposed approach for primary and redundant/standby server environments.

4. Proposed approach for the approximately 12 supervisory-control locations.

5. Proposed approach for the approximately 55 existing BACnet field controllers.

6. Proposed approach for the new-facility installation using the 225-control-point planning quantity.

7. Proposed approach for BACnet interoperability and any legacy gateway requirements.

8. Proposed approach for cybersecurity, secure authentication, patching, and Government network integration.

9. Proposed approach for administrator access, software licensing, programming tools, data ownership, and long-term Government maintenance.

10. Proposed graphics, floor plans, spatial visualization, thermal visualization, and BIM-compatible operational model approach.

11. Proposed approach for power-meter replacement and fuel-monitoring interface integration.

12. Proposed approach for lighting and security-lighting controls assessment and optional modernization.

13. Estimated schedule and long-lead equipment considerations.

14. Assumptions, exclusions, risks, and information required before final design or firm-fixed-price proposal.

15. Relevant past performance for comparable facility controls, BAS, UMCS, HVAC controls, OT, or industrial controls modernization projects.

5. REQUESTED PRICING FORMAT

Respondents shall provide estimated pricing, as applicable, using the following format.

Line Item

Description Pricing Type

0001 Primary UMCS server environment Base

0002 Redundant or standby UMCS server environment Base

0003 UMCS software, licenses, configuration tools, and programming tools Base

Existing supervisory-control modernization solution, based on 12 locations

Base

Existing BACnet field-controller migration, replacement, or gateway integration, based on 55 controllers

Base

0006 New-facility controls installation, based on 225 control points Base

Communications enclosures, battery backup, network components, and cabling

Base

0008 Power-meter replacement and integration allowance Base

0009 Fuel-monitoring interface integration Base

Two user workstations, two monitors, CAC readers/keyboards, and one technical laptop

Base

UMCS graphics, equipment graphics, floor plans, and system one-line diagrams

Base

BIM-compatible operational model, spatial visualization, and thermal visualization

Base

Cybersecurity engineering, secure authentication, authorization-support artifacts, and remediation support

Base

Line Item

Description Pricing Type

Functional testing, commissioning, failover testing, turnover, and final documentation

Base

Lighting and security-lighting controls assessment, modernization design, and itemized estimate

Base

1001 Five-year software maintenance, updates, and technical support Option

Lighting and security-lighting controls modernization and UMCS integration

Option

1003 Additional facility integration capability Option

1004 Additional power meter, installed and integrated Unit Price

1005 Additional BACnet field controller, installed and configured Unit Price

1006 Additional control point Unit Price

1007 Additional supervisory controller or gateway, installed and configured Unit Price

1008 BACnet MS/TP cable, installed, terminated, labeled, and tested Unit Price per LF

1009 Category 6 cable, installed, terminated, labeled, and tested Unit Price per LF

6. RESPONSE INSTRUCTIONS

Responses shall be submitted electronically in Adobe PDF format no later than the date and time identified in this request.

Responses should include:

• Cover letter;

• Technical approach;

• Proposed system architecture;

• Product literature or cut sheets;

• Rough Order Magnitude (ROM)/Pricing information;

• Recurring cost information;

• Schedule;

• Assumptions and exclusions;

• Relevant past performance; and

• Respondent point-of-contact information.

7. RELEASE OF DETAILED INFORMATION

Detailed site-specific information, records, drawings, building information, network requirements, cybersecurity requirements, and other technical information are not included in this request.

Any additional information required for final design, validation, or firm-fixed-price proposal development will be provided through the appropriate acquisition process, consistent with applicable access, handling, security, and release requirements.

Points of Contact: Please address any comments/questions regarding this request for information to Ms. Kristin Morrison, at kristin.morrison.1@us.af.mil. Responses are due by 11:00 EST. on 15 January 2027.

File details come from the government source that posted it. Updated .