This document appears to be a response to questions related to a state or local government contract opportunity. The questions cover various aspects of the project, including roof manufacturer/installer and warranty information, equipment lists, licensing requirements, fire alarm inclusion, plumbing requirements, ceiling heights, gas piping, and grease duct specifications. The intent is to provide clarification and additional details to the successful low bid contractor. The document indicates that some of the information will be provided by the contracting agency, CCGA, to the successful bidder.
The document does not provide details on pricing terms, set asides, incumbents, funding requirements, or other salient financial information. It focuses primarily on technical specifications and project requirements that the successful contractor will need to address.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Wednesday, February 14, 2024
1. Can we get Roof Manufacturer / Installer and warranty information?
2. We need equipment list for any equipment under the hood for gas piping (for the shutdown of gas equipment / gas valve) & electrical shunt trip breakers.
3. Is a G.C. License going to be required?
4. Is the Fire Alarm Included in contract?
5. Can we please get clarification on the plumbing requirements for demo & reinstallation of water piping?
The existing AHU and water softener is not in the same location on the drawing as they are in the actual space, on drawing P101 notes 1, 2, & 3 are not clear on what to actually remove and re-install.
6. The new ceiling height is said to be 8’, the windows are higher than 8’ please advise as to what we are doing at the windows and a fresh air vents? See attached Pictures.
7. On drawing P202 note 4 states “ROUTE 2" GAS PIPING SUPPORTED AND SECURE ABOVE
GRADE TO HVAC UNIT (DOAS-1). MAKE 3/4" GAS CONNECTION WITH GAS SHUT OFF
VALVE/UNION AND DIRT TRAP PER MANUFACTURERS RECOMMENDATIONS. PAINT
PIPING INDUSTRY STANDARD” however on the drawing it says 1” gas piping. Please clarify?
8. The roof trusses are on 16” centers, and the drawings are calling for 12”- 0 clearance grease duct and the minimum O.D. size for 12” – 0 clearance grease duct is 18” – 18.5” depending on manufacturer (3” – 3.5” of insulation), please clarify?
This information will be provided by CCGA to the successful low bid Contractor.
This information will be provided by CCGA to the successful low bid Contractor.
That is not the intent.
Modification to the existing FA related to interface with new grease hood is included.
Intent is to remove any plumbing related to fan coil unit that will be removed. All other existing plumbing is to remain as is.
Box out around each window and vent with ACT.
Provide 2" gas piping between regulator GR2 and DOAS.
Please bid ductwork as drawn. Will coordinate conflicts with existing conditions with successful low bid Contractor.