NB688000-26-02216 Requirements and Specifications.pdf

PDF 519 KB Posted

Attached to
Bonding Glass Wafers Federal contract opportunity
Solicitation number
NB688000-26-02216
Issued by
Department of Commerce National Institute of Standards and Technology

About this file

This is a Requirements/Specification Document for NIST's procurement of bonding glass wafers.

NIST's Physical Measurements Lab, Time and Frequency Division, Atomic Devices & Instrumentation Group requires 10 units of specialized glass wafers to support the development of microfabricated Rydberg atom cells for electrical metrology and radio frequency sensing applications. The glass wafers must meet three critical technical specifications: (1) lithium-doped glass composition enabling low-temperature anodic bonding at below 200°C, (2) thermal expansion coefficient matching silicon within 20 parts per million across the 0-450°C temperature range, and (3) polished 4-inch diameter with 0.7mm thickness. These specifications are necessary because standard bonding processes operate at temperatures that degrade the passivated surface coatings required for optimal cell performance. Delivery must be completed within 12 weeks after receipt of order. The government plans to conduct acceptance testing within 7 business days of delivery. No installation, training, warranty, maintenance, special shipping, electronic media, facility utilities, or travel requirements are specified. No separately priced options are included in this solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Bonding Glass Wafers, newest first.
File Type Posted
NB688000-26-02216 RFQ Bonding Glass Wafers.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Re qu ire m en ts

Sp ec ifi ca tio n Do cu m en t

Requirements / Specifications: Bonding Glass Wafers 1 Version 1.0 (2019) Double-click on for further assistance.

Use this document to detail specifications/requirements for an item and/or ancillary services.

TITLE: Bonding Glass Wafers Requesting Lab/Division/Group: Physical Measurements Lab/Time and Frequency Division/ Atomic Devices & Instrumentation Group

NB688000-26-02216

General Statement of Need The National Institute of Standards and Technology (NIST) is the US National Metrology Institute (NMI) responsible for establishing standards along with advancing measurement science, standards, and technology. The Atomic Devices and Instrumentation Group is funded and engaged in developing microfabricated cells using Rydberg atoms for both electrical metrology and radio frequency sensing. To ensure the performance of the cells, passivated surfaces with specific coatings are required. The quality of the coating can be only preserved at a temperature that is below the bonding temperature of the standard process so special glass wafers are needed to achieve lower bonding temperature for the cell fabrication. The acquisition will enable NIST researchers to develop and fabricate high performance cells and enhance current capabilities and meet current research obligations by procuring special glass material/wafers that support low temperature bonding with thermal expansion coefficient similar to Si.

Items and/or Ancillary Services

Item 1: Glass Wafers Quantity: 10 Specifications: The following technical specifications are required for the microfabricated Rydberg cells:

1.1, Li-doped glass wafer that enables low temperature anodic bonding at below 200 C 1.2, Thermal expansion matches Si to be within 20 ppm from 0-450 C 1.3, Polished 4-inch diameter wafter with thickness of 0.7 mm.

Separately Priced Options and Services:

Item 2: [List minimum specifications.

Quantity: [Enter quantity here.] Specifications: [Enter quantity here.]

[List any other item(s) or service requirements here using the same format above.]

Service Requirements / Item Specifications

Section Requirements/Specifications Planning Considerations ☒ N/A

☐ List any visits required to allow potential vendors to see site specific constraints.

[Explain requirement here] ☐ US citizen required on-site (foreign nationals require preregistration 30 days prior) ☐ Vendor rep on-site more than three days ire m en ts

Sp ec ifi ca tio n Do cu m

Requirements / Specifications: Bonding Glass Wafers 2

☐ Other considerations: [List other considerations to ensure an accurate quote]

Shipping & Delivery ☐ N/A

[Enter shipping and delivery information by item here.] Shipping criteria:

☐ Partial delivery acceptable ☐ Direct delivery to building required [Explain need for requirement here] Building has: ☐ Loading dock ☐ Containerization preference: [Choose container] Other requirements: [List any other requirements here] Delivery date criteria:

☒ Delivery of goods, installation, and training shall be completed no later than:

12 Weeks ARO ☐ Deliver no earlier than: [Insert date here] ☐ Other: [List other shipping, delivery, or specil requirements]

Electronic Media ☒ N/A

[Enter electronic media requirements by item here.] ☐ Software ☐ Electronic manuals ☐ License Key ☐ Other: [List any other Electronic Media requirements here] [Enter email address for software delivery here]

Installation ☒ N/A

[Enter installation requirements by item here.] ☐ Vendor technician on site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of packaging material ☐ Equipment set up ☐ Start-up services ☐ Turn key installation ☐ Other [Enter details here.] Note: When installation is required, TPOC or COR shall be the coordination point.

Facility / Utility Considerations ☒ N/A

[List site specific utility considerations by item here.] ☐ OFPM Work Order Number(s) [List any Work Order Number(s) here] ☐ Power available Voltage: [Enter voltage here] (V) Max Current: [Enter max current draw here] (A) Phase: [Choose phase] Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter plug type here] (i.e.: NEMA L5-20P) Environment: [Choose environment] Other power consideration: [List any other power considerations here] ☐ Utility connections: [List relevant available utilities, pressure(s), and flowrate(s)] ☐ Other considerations: [List other considerations to ensure an accurate ire m en ts

Sp ec ifi ca tio n Do cu m

Requirements / Specifications: Bonding Glass Wafers 3 quote] Warranty ☒ N/A

[Choose warranty type here.] [If you require an Extended Manufacturer Warranty, describe the warranty requirements per item here.] What is included?

☐ Labor ☐ Parts ☐ Travel ☐ Cost and liability for returns ☐ Other: [Enter other requirements here] ☐ Warranty length: [Enter warranty length here] Period Length:[Ex. month, 6 month, year etc.]

Training ☒ N/A

[Training requirements (who, when, what, where) here. If on-site, is travel necessary?] ☐ On-site ☐ Off-site location: [Enter location(s) here] ☐ Number of trainees: [Enter number of trainees here] Scope of training:

☐ Operations ☐ Maintenance ☐ Troubleshooting ☐ Safety ☐ Other: [Enter other scope requirements here] ☐ Training materials to be provided: [Describe requirement here] ☐ Other: [Enter other training requirements here] Note: When training is required, TPOC or COR shall be the coordination point.

Inspection and Acceptance ☐ N/A

[Enter inspection requirements per item here] ☒ Planned government acceptance testing (7 business days) ☐ Gov’t acceptance expected to take longer than 7 business days: [Duration] ☐ Inspection and acceptance plan: [Explain here] ☐ Other: [Enter other requirements here]

Maintenance ☒ N/A

[Describe your maintenance requirements per item here] Period Length: [Ex. month, 6 month, year etc.] What is included?

☐ Labor ☐ Spare parts ☐ Consumables ☐ Travel ☐ Cost and liability for returns ☐ Software updates ☐ Manuals ☐ Service plan length: [Enter service plan length here] ☐ Other: [Enter other requirements here] ☐ Requirements: [Enter requirements here] (i.e.: onsite within 72 hours, etc.)

☐ Option Period 1 ☐ Option Period 2 ☐ Option Period 3 ☐ Option Period 4

Government Furnished Material / Equipment

[List any government furnished material/equipment per item here] ☐ Samples for testing ☐ Government equipment which will leave gov't site (TPOC must coordinate with division property custodian) Serial Number: [Enter Serial Number here] ire m en ts

Sp ec ifi ca tio n Do cu m

Requirements / Specifications: Bonding Glass Wafers 4

☒ N/A Description: [Enter description here] NIST property number: [Enter NIST property number here] ☐ Other: [Enter other details here]

Travel ☒ N/A

[Describe any travel requirements per item here] ☐ Explain: [Explain here] ☐ Other: [Enter other requirements here] Vendor: To the maximum extent possible, include as part of appropriate sections above (maintenance, repair, etc.). Otherwise, it will be a separate line item, reimbursable per the Federal Travel Regulation.

Provide suggestions to improve this form by clicking here.

File details come from the government source that posted it. Updated .