NB688000-26-02416 Requirements and Specifications.pdf
PDF 522 KB Posted
- Attached to
- Sources Sought 1071 nm Fiber Amplifier
- Solicitation number
- NB688000-26-02416
About this file
This is a Requirements/Specification Document for a federal procurement issued by the National Institute of Standards and Technology (NIST), Physical Measurements Lab/Time and Frequency Division/Ion Storage Group, for contract number NB688000-26-02416.
NIST requires the procurement of two (2) ytterbium-doped fiber amplifiers operating at 1071 nanometers for use in a clock laser for a new trapped-ion atomic clock. The specified technical requirements include: wavelength of 1071 nm, input power of 1-5 mW, output power adjustable up to 5 W, signal-to-noise ratio of 50 dB or better, polarization extinction ratio of 20 dB or better, and safety interlocks to prevent amplified spontaneous emission (ASE) pulsing during input power disruption. Delivery of goods, installation, and training must be completed within 16-18 weeks after receipt of order (ARO). Government acceptance testing is expected to require 14 business days. Typical facility power available is 60 Hz, 120 V. Base manufacturer warranty is acceptable. NIST will supply the 1071 nm input laser as government-furnished material. No separate pricing options, installation services, training, maintenance, travel requirements, or extended warranty services are specified as requirements in this procurement.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Re qu ire m en ts
Sp ec ifi ca tio n Do cu m en t
Requirements / Specifications: 1071 nm Fiber Amplifier 1 Version 1.0 (2019) Double-click on for further assistance.
Use this document to detail specifications/requirements for an item and/or ancillary services.
TITLE: 1071 nm Fiber Amplifier Requesting Lab/Division/Group: Physical Measurements Lab/Time and Frequency Division/Ion Storage Group
NB688000-26-02416
General Statement of Need The Ion storage group requires two ytterbium-doped fiber amplifiers operating at 1071 nanometers for the clock laser for a new trapped-ion atomic clock.
Items and/or Ancillary Services
Item 1: 1071 nm Fiber Amplifier Quantity: Two (2) Specifications:
1.1 - Wavelength: 1071 nm
1.2 - Input power: 1-5 mW
1.3 - Output power adjustable up to 5 W
1.4 - Signal-to-noise ratio for amplified signal to amplified spontaneous emission (ASE) 50 dB or better
1.5 - Polarization extinction ratio (PER) 20 dB or better
1.6 - Safety interlocks to prevent ASE pulsing in the event of input power disruption.
Separately Priced Options and Services:
Item 2: [List minimum specifications.
Quantity: [Enter quantity here.] Specifications: [Enter quantity here.]
[List any other item(s) or service requirements here using the same format above.]
Service Requirements / Item Specifications
Section Requirements/Specifications Planning Considerations ☒ N/A
☐ List any visits required to allow potential vendors to see site specific constraints.
[Explain requirement here] ☐ US citizen required on-site (foreign nationals require preregistration 30 days prior) ☐ Vendor rep on-site more than three days ☐ Other considerations: [List other considerations to ensure an accurate quote]
Shipping & Delivery ☐ N/A
Delivery in 16 weeks ARO preferred Shipping criteria:
☐ Partial delivery acceptable ☐ Direct delivery to building required [Explain need for requirement here] ire m en ts
Sp ec ifi ca tio n Do cu m
Requirements / Specifications: 1071 nm Fiber Amplifier 2
Building has: ☐ Loading dock ☐ Containerization preference: [Choose container] Other requirements: [List any other requirements here] Delivery date criteria:
☒ Delivery of goods, installation, and training shall be completed no later than:
16-18 Weeks ARO ☐ Deliver no earlier than: [Insert date here] ☐ Other: [List other shipping, delivery, or specil requirements]
Electronic Media ☒ N/A
[Enter electronic media requirements by item here.] ☐ Software ☐ Electronic manuals ☐ License Key ☐ Other: [List any other Electronic Media requirements here] [Enter email address for software delivery here]
Installation ☒ N/A
[Enter installation requirements by item here.] ☐ Vendor technician on site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of packaging material ☐ Equipment set up ☐ Start-up services ☐ Turn key installation ☐ Other [Enter details here.] Note: When installation is required, TPOC or COR shall be the coordination point.
Facility / Utility Considerations ☐ N/A
Typical 60 Hz, 120 V power available ☐ OFPM Work Order Number(s) [List any Work Order Number(s) here] ☐ Power available Voltage: [Enter voltage here] (V) Max Current: [Enter max current draw here] (A) Phase: [Choose phase] Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter plug type here] (i.e.: NEMA L5-20P) Environment: [Choose environment] Other power consideration: [List any other power considerations here] ☐ Utility connections: [List relevant available utilities, pressure(s), and flowrate(s)] ☐ Other considerations: [List other considerations to ensure an accurate quote] ire m en ts
Sp ec ifi ca tio n Do cu m
Requirements / Specifications: 1071 nm Fiber Amplifier 3
Warranty ☐ N/A
Base Manufacturer Warranty is acceptable [If you require an Extended Manufacturer Warranty, describe the warranty requirements per item here.] What is included?
☐ Labor ☐ Parts ☐ Travel ☐ Cost and liability for returns ☐ Other: [Enter other requirements here] ☐ Warranty length: [Enter warranty length here] Period Length:[Ex. month, 6 month, year etc.]
Training ☒ N/A
[Training requirements (who, when, what, where) here. If on-site, is travel necessary?] ☐ On-site ☐ Off-site location: [Enter location(s) here] ☐ Number of trainees: [Enter number of trainees here] Scope of training:
☐ Operations ☐ Maintenance ☐ Troubleshooting ☐ Safety ☐ Other: [Enter other scope requirements here] ☐ Training materials to be provided: [Describe requirement here] ☐ Other: [Enter other training requirements here] Note: When training is required, TPOC or COR shall be the coordination point.
Inspection and Acceptance ☐ N/A
[Enter inspection requirements per item here] ☐ Planned government acceptance testing (7 business days) ☒ Gov’t acceptance expected to take longer than 7 business days: 14 days ☐ Inspection and acceptance plan: [Explain here] ☐ Other: [Enter other requirements here]
Maintenance ☒ N/A
[Describe your maintenance requirements per item here] Period Length: [Ex. month, 6 month, year etc.] What is included?
☐ Labor ☐ Spare parts ☐ Consumables ☐ Travel ☐ Cost and liability for returns ☐ Software updates ☐ Manuals ☐ Service plan length: [Enter service plan length here] ☐ Other: [Enter other requirements here] ☐ Requirements: [Enter requirements here] (i.e.: onsite within 72 hours, etc.)
☐ Option Period 1 ☐ Option Period 2 ☐ Option Period 3 ☐ Option Period 4
Government Furnished Material / Equipment ☐ N/A
1071 nm input laser supplied by NIST ☐ Samples for testing ☐ Government equipment which will leave gov't site (TPOC must coordinate with division property custodian) Serial Number: [Enter Serial Number here] Description: [Enter description here] ire m en ts
Sp ec ifi ca tio n Do cu m
Requirements / Specifications: 1071 nm Fiber Amplifier 4
NIST property number: [Enter NIST property number here] ☐ Other: [Enter other details here]
Travel ☒ N/A
[Describe any travel requirements per item here] ☐ Explain: [Explain here] ☐ Other: [Enter other requirements here] Vendor: To the maximum extent possible, include as part of appropriate sections above (maintenance, repair, etc.). Otherwise, it will be a separate line item, reimbursable per the Federal Travel Regulation.
Provide suggestions to improve this form by clicking here.
File details come from the government source that posted it. Updated .