Statement of Work (SOW) - Call with any questions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combined_Synopsis-Solicitation_Jan2019.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
Statement of Work: Mini-dilution refrigeration unit 1 Last Saved: 8/29/2019 1:58 PM Double-click on for further assistance.
Use this Statement of Work document to purchase an item and/or item-related services.
TITLE: Mini-dilution refrigeration unit Requesting Lab/Division/Group: Physical Measurement Laboratory (PML), Applied Physics Division 686, Faint Photonics Group (Group 6) Requisition Number: NB686060-19-03123
Statement of Need Researchers in the the Faint Photonics Group (686.06) are constructing a cryogenic system to test single photon detectors at temperatures below 80mK. This system will be constructed by adding a small, closed cycle dilution unit to an existing pulse tube cooler. It is expected that the dilution unit be a continuous dilution refrigerator
Items and/or item-related services Section Requirements Related Information Items/Service (required)
ITEM 1: Mini-dilution refrigerator unit
Specification 1.1: Base temperature below 80 mK Specification 1.2: At least 2 microWatts of cooling power below 100mK Specification 1.3: Compatible for use with a mechanical cryocooler with 0.3 Watts of cooling power at 4.2K oling power must be at least 0.3 Watts (at 4.2 K) Specification 1.4: The entire dilution system must not circulate gas to room temperature.
☐ See attached document for detailed specifications
Specification 1.3 Please provide drawings of the system to ensure the system will fit into an existing cryogenic system.
Shipping & Delivery ☐ N/A
Delivery information by item ☐ Phased delivery is acceptable ☐ Software on USB / disk required ☐ Software electronic delivery acceptable Email address for software delivery
Enter related information here
Installation ☒ N/A
Installation requirements ☐ Site visit recommended
Inspection and Acceptance ☐ N/A
Inspection requirements ☒ Government acceptance expected to take longer than 7 days
Ability to validate technical performance for acceptance may be contingent on progress in development of other equipment.
Warranty Base Manufacturer Warranty is acceptable Enter related information here
S
Statement of Work: Mini-dilution refrigeration unit 2 Last Saved: 8/29/2019 1:58 PM Double-click on for further assistance.
☐ N/A If you require an Extended Manufacturer Warranty, describe the warranty requirements.
Period Length:Ex. month, 6 month, year etc.
☐ Option Period 1 ☐ Option Period 2 ☐ Option Period 3 ☐ Option Period 4
Training ☒ N/A
Training requirements Enter related information here
Maintenance
☒ N/A
Describe your maintenance requirements.
☐See attached document for detailed maintenance specifications Period Length: Ex. month, 6 month, year etc.
Enter related information here
☐ Option Period 1 ☐ Option Period 2 ☐ Option Period 3 ☐ Option Period 4
Repair ☐ N/A
No repairs included outside of warranty period Describe your repair requirements.
Period Length: Ex. month, 6 month, year etc.
Enter related information here
☐ Option Period 1 ☐ Option Period 2 ☐ Option Period 3 ☐ Option Period 4
Government Furnished Material / Equipment ☒ N/A
List any government furnished material/equipment here
Enter related information here
Travel ☒ N/A
Describe any travel requirements Vendor: To the maximum extent possible, include as part of appropriate sections above (maintenance, repair, etc.).
Otherwise, it will be a separate line item, reimbursable per the Federal Travel Regulation.
| Use this Statement of Work document to purchase an item and/or item-related services. |
| Use this Statement of Work document to purchase an item and/or item-related services. |
| TITLE: Mini-dilution refrigeration unit |
| TITLE: Mini-dilution refrigeration unit |
| Requesting Lab/Division/Group: Physical Measurement Laboratory (PML), Applied Physics Division 686, Faint Photonics Group (Group 6) |
| Requesting Lab/Division/Group: Physical Measurement Laboratory (PML), Applied Physics Division 686, Faint Photonics Group (Group 6) |
| Requisition Number: NB686060-19-03123 |
| Requisition Number: NB686060-19-03123 |
| Statement of Need |
| Statement of Need |