Attachment B - Specifications.pdf
PDF 232 KB Posted
- Attached to
- QNet Amplifier Pump
- Solicitation number
- NB6760302602025
About this file
This is a Requirements/Specification Document for procurement of a QNet Amplifier Pump microwave synthesizer by the National Institute of Standards and Technology (NIST).
NIST's Communications Technology Laboratory, Quantum Networking and Transduction Division (676.03) requires one QNet Network Analyzer unit to support readout of microwave-optical transducer devices developed collaboratively with the University of Colorado and Joint Institute for Laboratory Astrophysics (CU-JILA). The equipment must function as an electrical coherent pump for quantum networking applications. Critical specifications include: operating frequency range exceeding 16 GHz with full-range tunability; output power greater than +25 dBm with adjustable capability for power-dependent effect studies; phase noise approaching -145 dBc/Hz at 1.5 MHz offset from carrier; rack mount or bench top configuration; manual and programmable control interfaces; external trigger operation capability; external 10 MHz reference frequency input; and N-Type or 2.92 mm (K) coaxial output connector. The high output power requirement ensures signal penetration through the high isolation attenuation of the dilution refrigerator housing the transducer, while ultra-low phase noise performance is essential to prevent degradation of the phase-sensitive amplifier's noise characteristics. Delivery must be completed no later than 21 weeks after release of order (ARO). Acceptance is expected to exceed 7 business days, requiring 15 business days for performance testing. The equipment shall be delivered to NIST-Boulder, Mail Stop 676.03, 325 Broadway, Boulder, CO 80305. Base manufacturer warranty is acceptable. No installation, training, calibration, maintenance, or specialized facility requirements are specified.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment A - Request for Quote.pdf | ||
| Attachment C - Provisions and Clauses.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requirements / Specification Document
TITLE: QNet Amplifier Pump
Requesting Laboratory / Division / Group:
Communications Technology Laboratory Quantum Sensing and Communications Quantum Networking and Transduction (676.03)
General Statement of Need: The product to be procured is a low noise, tunable, high-power, single frequency microwave synthesizer with capability to generate tones of up to 16 GHz. This equipment will be essential for the readout of microwave-optical transducer devices being developed by collaborators at the University of Colorado and Joint Institute for Laboratory Astrophysics (CU-JILA). As part of the quantum networking project within the Communications Technology Laboratory (CTL), these CU-JILA transducer devices will be installed at NIST, with the microwave synthesizer acting as a electrical coherent pump required to achieve good read out SNR. Due to fabrication constraints in making these circuits and readout amplifiers there is inherent uncertainty in the exact resonant frequency and quality factor of any individual device requiring pump tone tunability. Previously, the CU-JILA collaborators identified the need for ultra-low phase noise in such a system to meet the stringent performance requirements. The microwave synthesizer to be acquired by NIST must have similar performance such that added noise of the pumping tone does not adversely impact the added noise of the phase sensitive amplifier device.
There are two critical technical requirements, namely an output power above +25 dBm with an adjustable carrier frequency from roughly DC up to >16 GHz. The high output power is critical for ensuring the generated signal is able to reach the device through the high isolation attenuation required by the dilution refrigerator which houses the transducer. Fine tuning of the output power is required to study power-dependent effects. A wide tuning range up to at least 16 GHz is required, because parametric amplifiers cannot easily be manufactured to create an exact pump operating frequency. The associated phase and amplitude noise of this generator are crucial because they additionally couple to the amplifier as noise decreasing readout performance. A phase noise floor approaching -145 dBc/Hz at 1-1.5 MHz offset frequency from the carrier is desirable. Another technical requirement is the ability to control and program this equipment into a larger experiment.
Additional specifications are noted below.
Item Specifications and Quantities:
Item 1: QNet Network Analyzer Quantity: 1 EACH Specifications: 1.1 Operating frequency range up to >16GHz
1.2 Frequency tunability across the whole range
1.3 Output power: > +25 dBm
1.4 Phase noise approaching -145 dBc/Hz at 1.5MHz offset of
carrier
1.5 Rack mount or bench top unit
1.6 Manual and programmable control interface
1.7 External trigger operation
1.8 External 10 MHz reference frequency input
1.9 N-Type or 2.92 mm (K) coaxial output connector
Procurement Support Information and Ancillary Services:
Section Requirements/Specifications
Planning Considerations ☒ N/A
☐ List any visits required to allow potential vendors to see site specific constraints.
[Explain Requirements.] ☐ US citizen required on-site (foreign nationals require pre-registration 30 days prior to visit.)
☐ Vendor Representative On-Site more than three (3) days.
☐ Other Considerations:
[List other considerations to ensure an accurate quote.]
Shipping & Delivery ☐ N/A
Shipping Address:
☒ NIST-Boulder
Mail Stop: 676.03 325 Broadway Boulder, CO 80305
Shipping Criteria:
☐ Partial Delivery Acceptable
☐ [Enter Shipping and Delivery information by item.] ☐ Direct Delivery to OU Building Required [Explain Need for Requirement]
Building /Room Number: [Enter Building/Room Number] ☐ Building has Loading Dock
Containerization Preference: [Enter Container Type] Other Requirements:
[List Any Other Requirement] Delivery Date Criteria:
☒ Delivery Shall Be Competed No Later Than:
21 weeks ARO ☐ Delivery Shall Be Made No Earlier Than:
Click or tap to enter a date.
☐ Scheduled Deliveries:
Item Number Due Date
☐ Other:
[List Other Shipping, Delivery or Special Requirements.]
Electronic Media ☒ N/A
[Enter Electronic Media Requirements by Item.]
☐ Software ☐ Electronic Manuals ☐ License Key ☐ Other:
[List Any Other Electronic Media Requirements] ☐ US Government Email Address for Software Delivery:
[Enter Address]
Installation ☒ N/A
[Enter Installation Requirements by Item]
☐ Vendor Technician on Site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of Packaging Material ☐ Equipment Set Up ☐ Start-Up Services ☐ Turnkey Installation ☐ Other:
[Enter Details] NOTE: SME shall be the coordination POC.
Facility / Utility Considerations ☒ N/A
[List Site Specific Utility Considerations by Item] ☐ OFPM Work Order Numbers
[List Work Order Numbers]
☐ Power Available
Voltage: [Enter voltage] (V) Maximum Current: [Enter max current draw] (A) Phase: [Choose Phase]
Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter Plug Type] (i.e.: NEMA L5-20P) Environment: [Choose Environment] Other Power Considerations:
[List Any Other Power Considerations.]
☐ Utility Connections:
[List Relevant Available Utilities, Pressure(s) and Flowrate(s).]
☐ Other Considerations:
[List Other Considerations to Ensure an Accurate Quote.]
Inspection and Acceptance ☐ N/A
[Inspection Requirements Per Item (Who, When, What, Where)] ☐ On-Site
☐ Acceptance Not Expected to Exceed 7 Business Days
☒ Acceptance Expected to Exceed 7 Business Days:
15 business days to conduct performance tests.
☐ Inspection and Acceptance Plan:
[Explanation]
[Enter Other Requirements]
Training ☒ N/A
Training Requirements (Who, When, What, Where)
☐ Number of Trainees: [Enter Number of Trainees] ☐ On-Site
☐ Off-Site Location: [Enter Location(s)] Is Trainee Travel Required: [Choose Answer] Scope of Training ☐ Operation ☐ Maintenance ☐ Troubleshooting
☐ Safety ☐ Other [Enter Other Scope of Training Requirements] ☐ Training Materials to be Provided by Government:
[Describe Materials] ☐ Training Materials to be Provided by Vendor:
[Describe Materials] ☐ Other [Enter Other Training Requirements] NOTE: SME shall be coordination POC.
Warranty ☐ N/A
Base Manufacturer Warranty is Acceptable Warranty Length:
What is included?
☐ Labor ☐ Parts ☐ Travel ☐ Cost and Liability for Returns
☐ Other [Enter Other Requirements]
☐ 1 Option Period ☐ 2 Option Periods ☐ 3 Option Periods ☐ 4 Option Periods (Maximum)
Calibration
[Describe Calibration Requirements Per Item] Calibration Plan Length: [i.e. 3 - Years] What is Included?
☐ Labor ☐ Spare Parts ☐ Consumables
☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals
☐ Other [Enter Other Requirements] ☐ Requirements:
[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)
☐ 1 Option Period
Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods
Maintenance
[Describe Maintenance Requirements Per Item] Maintenance Plan Length: [i.e. 3 - Years] What is Included?
☐ Labor ☐ Spare Parts ☐ Consumables
☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals
☐ Other [Enter Other Requirements] ☐ Requirements:
[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)
☐ 1 Option Period
Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods
Government Furnished Material / Equipment ☒ N/A
List Any Government Furnished Material / Equipment Per Item] ☐ Samples for Testing
☐ Equipment which will leave Government Site
Description:
Serial Number:
NIST Property Number:
[Enter Description] [Enter Serial Number] [Enter NIST Property Number]
☐ Other: [Enter Other Details]
Travel
[Describe any Travel Requirements Per Item] ☐ Explain:
[Enter Justification / Requirement]
[Enter Other Requirements]
NOTE TO VENDOR: To the maximum extent possible, include travel requirement estimates as part of pertinent sections above (Installation, Maintenance, Repair, etc.). Otherwise, Travel will be a separate line item, reimbursable per the Federal Travel Regulation.
File details come from the government source that posted it. Updated .