Specifications.pdf

PDF 273 KB Posted

Attached to
SOURCES SOUGHT: 5G Cellular Base Station (BRAND NAME Ericsson) Federal contract opportunity
Solicitation number
NB675030-26-01810
Issued by
Department of Commerce National Institute of Standards and Technology

About this file

This is a Requirements/Specification Document for NIST's procurement of a 5G Cellular Base Station system from Ericsson to modernize the Spectrum Technology and Research Division's measurement and antenna calibration methodologies.

The procurement includes ten line items totaling an Ericsson 5G C-band Next-Generation NodeB (gNB) system with advanced RF features and beamforming capabilities. Item 1 specifies two Radio AIR 6419 B77D units with circular power connectors and beamforming processing. Item 2 requires 40 NR TDD M-MIMO Cell Carriers with 10 MHz bandwidth increments. Item 3 is a comprehensive power supply set including two 3kW PSU units, one 6kW power unit, multiple circuit breakers, cables, and a controller. Item 4 is a GPS kit with L1/L5 antennas, sealing sets, grounding kits, and associated cable assemblies. Item 5 comprises two site material packages for 20-meter sectors including SFP28 transceivers, cable clamps, grounding kits, and mounting brackets. Item 6 is a RAN Processor 6655 with 300 CBW and 12-layer M-MIMO capability including mounting sets and signal/power cables. Items 7 through 10 cover software (Q4.2025 with 100 MHz packages including eMBB and Massive MIMO enablers), a three-year software subscription, a three-year customer support package, and engineering services including integration, commissioning, and 40 hours of onsite support.

The procurement requires delivery within three months after receipt of order to NIST-Boulder, 325 Broadway, Boulder, CO 80305. Installation requirements include vendor technician onsite presence, uncrating/unpackaging, and turnkey installation with engineering services. Training for 10 trainees covers operation, maintenance, troubleshooting, and safety via both onsite and virtual delivery. A three-year manufacturer warranty covering labor, parts, and travel is specified with returns within five business days. A 3-year maintenance plan includes software updates. Inspection and acceptance will occur onsite within 7 business days through basic functional testing and key performance indicator verification. Vendors must possess an active Export Control Classification Number (ECCN) and an active Unique Entity Identification Number (UEI) on SAM.gov at time of award. US citizens are required onsite with foreign nationals requiring 30-day preregistration. NIST will furnish a 19-inch rack and current generation handsets as government-furnished material.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requirements / Specification Document

TITLE: 5G Cellular Base Station (Ericsson)

Requesting Laboratory / Division / Group:

Communications Technology Laboratory Spectrum Technology and Research Division Shared Spectrum Metrology Group (675.03)

General Statement of Need:

To modernize NIST’s measurement and antenna calibration methodologies, the Spectrum Technology and Research Division requires an Ericsson (Brand Name) 5G C-band Next- Generation NodeB (gNB). By incorporating advanced RF features and beamforming capabilities, this high-fidelity base station will allow researchers to replicate real-world deployment dynamics.

Item Specifications and Quantities:

Item 1: Radio AIR 6419 B77D + Pwr. Connector 2-po Quantity: 2 EACH Specifications: 1.1 Circular Power Connector 2-pos 2,5-16mm2 DC-C (2 wire) Specifications: 1.2 AIR 6419 B77D + BF Processing, RoW, 20W HWAC incl.

Item 2: NR TDD M-MIMO Cell Carrier 10 MHz B/W incr. Step HWAC (100

MHz per radio) Quantity: 40 EACH Specifications: 2.1 INF 903 9999/HR903

Item 3: Power Supply Quantity: 1 SET Specifications: 3.1 2 EACH - PSU Power Supply Unit, 96% 230 VAC 3kW

6130/6140 v2 TH

3.2 Power 6250 6kW INF 903 6200/22303

3.3 CB 6A 1U NFS 899 003/1006

3.4 CB 20A 1U NFS 899 003/1020

3.5 16mm2, GNYE, 5m, 1 lug with 2 M6 holes, angle 90 RPM

119 2062/5

3.6 SIGNAL CABLE (Use SP-RPM 777 143/01500 for spare parts)

RPM 777 143/01500

3.7 2 EACH - AC Power Cable RPM 777 403/03000

3.8 Signal Cable (Use SP-RPM 919 727/01000 for spare parts)

RPM 919 727/01000

3.9 Wall mount bracket Power 6250 SXK 111 57/1

3.10 2 EACH - CB 16A 1U NFS 899 003/1016

3.11 CB 40A 1U NFS 899 003/1040

3.12 CB 32A 1U NFS 899 003/1032

3.13 Controller 6610 INF 903 6610/1

Item 4: GPS Kit Quantity: 1 EACH Specifications: 4.1 L1 and L5 Antenna KRE 101 2595/2

4.2 2 EACH - Sealing Set, Feeder Connectors MPP 901 213/1

4.3 GRU 0501 NCD 901 89/1

4.4 1/4inch grounding kit, Alu and Cu cables, tape sealing NGT

901 28/1

4.5 Clamp Kit 7,6 mm 10 pcs NTM 203 219/10

4.6 Earthing cable, 16mm2, 5m G/Y RPM 119 1648/5

4.7 Signal Cable RPM 777 381/02000

4.8 GPS RF jumper N(f)-SMA(m) 1.5m TSR 951 339/1500

4.9 GPS RF jumper, N male- N male, 10m TSR 951 345/2

4.10 GPS bracket steel SXK 109 1931/2

Item 5: Site Material 1x Sector1- (20 m) Quantity: 2 Specifications: 5.1 4 EACH - SFP28 25GBASE-LR Lite RDH 102 75/2 Specifications: 5.2 4 EACH - Universal cable clamp, 10pcs NSV 354 4159/3 Specifications: 5.3 2 EACH - Grounding kit for DC power cab NGT 901 21/1 Specifications: 5.4 4 EACH - Sealing Set, Feeder Connectors MPP 901 213/1 Specifications: 5.5 4 EACH - Tie Strap, W=9.5mm, L=457mm, Plastic/Metal SET

145 095/457 Specifications: 5.6 2 EACH - Overlenght box 30m OIL cable SXA 103 4344/1 Specifications: 5.7 2 EACH - Marking Set Main Remote 3-Sector SVB 153 223/1 Specifications: 5.8 2 EACH - AIR Medium, wall and pole mount bracket with tilt and azimuth SXK 109 2065/1

Specifications: 5.9 2 EACH - 16mm2, GNYE, 5m, 1 lug with 2 M6 holes, straight

RPM 119 2060/5

Specifications: 5.10 2 EACH - 2F LC(FullAXS)-LC SM, 20 m RPM 253 1610/20M

Item 6: Site HW: RAN Processor 6655 Ph. HW with 300 CBW and 12 Layers M-MIMO Quantity: 1 EACH Specifications: 6.1 RAN Processor 6655 Ph. HW with 300 CBW and 12 Layers

M-MIMO INF 903 6506/02

Quantity: 1 Specifications: 6.2 MOUNTING SET/RACK SCREW KIT SXK 111 539/1 Specifications: 6.3 2 EACH - SFP+ CPRI & 10GBase-LR 10km 1310nm -40/+85C Specifications: 6.4 2 EACH - Signal Cable Specifications: 6.5 2 EACH - Power cable Specifications: 6.6 Grounding Cable (Use SP-RPM 777 567/02500 for spare parts) Specifications: 6.7 Cable guide Specifications: 6.8 2F LC-LC SM 2M Specifications: 6.9 2x10mm2 DC Power Cable No CPR No UL

Item 7: Software Q4.2025 , 100 MHz Package Specifications: 7.1 40 EACH - NR eMBB Low/Mid-Band Base Package Specifications: 7.2 40 EACH - Massive MIMO Enabler Specifications: 7.3 40 EACH - Massive MIMO Performance Specifications: 7.4 40 EACH - Peak Rate Evolution

Item 8: Software Subscription Quantity: 1 EACH Specifications: 8.1 3-Year Duration

Item 9: Customer Support Package Quantity: 1 EACH Specifications: 9.1 3-Year Duration

Item 10: Engineering Services Quantity: 1 EACH Specifications: 10.1 3-Year Duration

10.2 Integration

10.3 Commissioning

10.4 40 Hours Of Onsite Support

Vendor Requirements

1. Possess at time of award/contracting an Export Control Classification Number (ECCN).

2. Possess at time of award/contracting a Unique Entity Identification Number (UEI) which registration is listed as “Active” on the GSA System for Award Management (SAM.gov).

Procurement Support Information and Ancillary Services:

[Provide input for each section Below or Mark Not Applicable (N/A)]

Section Requirements/Specifications

Planning Considerations ☐ N/A

☐ List any visits required to allow potential vendors to see site specific constraints.

[Explain Requirements.] ☒ US citizen required on-site (foreign nationals require pre-registration 30 days prior to visit.)

☐ Vendor Representative On-Site more than three (3) days.

☐ Other Considerations:

[List other considerations to ensure an accurate quote.]

Shipping & Delivery ☐ N/A

Shipping Address:

☒ NIST-Boulder

ATTN: TBA

Mail Stop: TBA 325 Broadway Boulder, CO 80305

☐ NIST-Gaithersburg

ATTN:

Mail Stop:

100 Bureau Dr Gaithersburg MD 20899

☐ [Alternate Shipping Address] Shipping Criteria:

☒ Partial Delivery Acceptable

☐ [Enter Shipping and Delivery information by item.]

☒ Direct Delivery to OU Building Required [Explain Need for Requirement]

Building /Room Number: [Enter Building/Room Number] ☐ Building has Loading Dock

Containerization Preference: [Enter Container Type] Other Requirements:

[List Any Other Requirement] Delivery Date Criteria:

☒ Delivery Shall Be Competed No Later Than:

Three months After Receipt of Order (ARO) ☐ Delivery Shall Be Made No Earlier Than:

Click or tap to enter a date.

☐ Scheduled Deliveries:

Item Number Due Date

☐ Other:

Three months after the award date.

Electronic Media ☐ N/A

[Enter Electronic Media Requirements by Item.]

☒ Software ☒ Electronic Manuals ☐ License Key ☐ Other:

[List Any Other Electronic Media Requirements] ☒ US Government Email Address for Software Delivery:

TBA

Installation

[Enter Installation Requirements by Item]

☒ Vendor Technician on Site ☐ Rigging ☒ Uncrating / Unpackaging ☐ Removal of Packaging Material ☐ Equipment Set Up

☐ Start-Up Services ☒ Turnkey Installation ☒ Other: Engineering Services, to include integration, commissioning, travel and 40 hours of onsite support

NOTE: TPOC shall be the coordination POC.

Facility / Utility Considerations ☐ N/A

[List Site Specific Utility Considerations by Item] ☐ OFPM Work Order Numbers

[List Work Order Numbers]

☒ Power Available

Voltage: [Enter voltage] (V) Maximum Current: [Enter max current draw] (A) Phase: [Choose Phase]

Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter Plug Type] (i.e.: NEMA L5-20P) Environment: [Choose Environment] Other Power Considerations:

[List Any Other Power Considerations.]

☐ Utility Connections:

[List Relevant Available Utilities, Pressure(s) and Flowrate(s).]

☐ Other Considerations:

[List Other Considerations to Ensure an Accurate Quote.]

Inspection and Acceptance ☐ N/A

[Inspection Requirements Per Item (Who, When, What, Where)] ☒ On-Site

☒ Acceptance Not Expected to Exceed 7 Business Days

☐ Acceptance Expected to Exceed 7 Business Days:

☒ Inspection and Acceptance Plan:

Basic functional test and key performance indicators (KPIs) verification.

[Enter Other Requirements]

Training

Training Requirements (Who, When, What, Where)

☒ Number of Trainees: 10

☒ On-Site

☒ Off-Site Location: Virtual Is Trainee Travel Required: NO Scope of Training ☒ Operation ☒ Maintenance ☒ Troubleshooting

☒ Safety ☐ Other ☐ Training Materials to be Provided by Government:

[Describe Materials] ☒ Training Materials to be Provided by Vendor:

PowerPoint presentation, electronic manual, or others.

☐ Other

NOTE: TPOC shall be coordination POC Warranty

Base Manufacturer Warranty is acceptable Warranty Length: 3-Years What is included:

☒ Labor ☒ Parts ☒ Travel

☒ Cost and Liability for Returns ☒ Other

Within 5 business days.

☐ 1 Option Period ☐ 2 Option Periods ☐ 3 Option Periods ☐ 4 Option Periods (Maximum)

Calibration ☒ N/A

[Describe Calibration Requirements Per Item] Calibration Plan Length: [i.e. 3 - Years] What is Included?

☐ Labor ☐ Spare Parts ☐ Consumables

☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals

☐ Other

☐ Requirements:

[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)

☐ 1 Option Period

Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods

Maintenance

[Describe Maintenance Requirements Per Item] Maintenance Plan Length: 3-Years What is Included?

☐ Labor ☐ Spare Parts ☐ Consumables

☐ Travel ☐ Cost and Liability for Shipment ☒ Software Updates ☐ Manuals

☐ Other [Enter Other Requirements] ☐ Requirements:

[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)

☐ 1 Option Period

Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods

Government Furnished Material / Equipment ☐ N/A

A 19” rack to host the gNB equipment.

☐ Samples for Testing

☐ Equipment which will leave Government Site

Description:

Serial Number:

NIST Property Number:

[Enter Description] [Enter Serial Number] [Enter NIST Property Number]

☒ Other: Current generation of handsets

Travel

☒ Explain:

40 hours of onsite for installation

NOTE TO VENDOR: To the maximum extent possible, include travel requirement estimates as part of pertinent sections above (Installation, Maintenance, Repair, etc.). Otherwise, Travel will be a separate line item, reimbursable per the Federal Travel Regulation.