STATEMENT OF WORK
Wing 6 Anechoic Chamber Transmit Antenna Positioner Linear Rail System Servo Drive and Related Components Upgrade and Installation
NB672020-19-02890
Requisitioner Contact Information Name: Christopher L. Holloway Email Address: christopher.holloway@nist.gov Phone: 303-497-6184
LAB REQUESTING SERVICE: Microfabrication Group, Quantum Electromagnetics Division, Physical Measurements Laboratory, National Institute of Standards and Technology
1. BACKGROUND INFORMATION
NIST-Boulder has a state-of-the-art research laboratory (the Katharine Bloggett Gebbie Building) to support the most sensitive research done at NIST. Included in this building is a Class 100 microelectronics fabrication facility, called the Boulder Micro-Fabrication Facility (BMF). Among the many critical pieces of equipment in this laboratory are a Heidelberg DWL 2000 and a Heidelberg MLA 150. If either tool is inoperable, NIST mission critical work is halted since these tools are a critical step in many NIST mission critical devices. In order to keep a high tool uptime, the BMF requires a service contract to maintain these tools and offer support if a tool becomes inoperable.
2. OBJECTIVES
3. SCOPE
The Contractor shall replace the existing servo motors and control system with a current state-of-the-art drive and control system on the existing X-Y positioner hardware. The Contractor shall modify the existing hardware as needed to mount the new motors, encoders, limit switches, and other components to provide a complete system. The control system shall provide both manual control (pendant) and external computer control of the positioner and be compatible with current laboratory software. The result of the retrofit will be a fully functional, safety compliant, fail-safe, linear two axis X-Y positioning system. The Contractor shall then install the refurbished X-Y positioner in the proper position at the antenna port of the anechoic chamber aligned with the linear axis of the interior robotic system. All fabrication, installation and purchasing of hardware and software described below will be done by the Contractor unless otherwise explicitly stated.
NIST Two-Axis (X-Y) Transmit Antenna Positioner
Figure 1: Transmit Antenna Positioner.
4. TASKS
a. Overview
The Contractor shall replace outdated motors and related hardware with a state-of-the-art motion system and install the complete refurbished X-Y positioner into the proper position at the transmit antenna port of the anechoic chamber in Room 1-4611.
b. Specific Tasks
The Contractor shall provide all support for project oversight, administration and technical execution of this action. The Contractor shall complete the following tasks:
(1) Replace the existing drive motors, encoders, limit switches, brakes, and
Compumotor control system with new components that perform the following:
(a) Move and control the two lead-screw positioning axes to within 100 microns* as measured by NIST-provided laser tracker.
i. Specification met by approaching the commanded point from the same direction multiple times. Each rail will be commanded at the beginning of motion, ¼, ½, ¾ and full motion range. run three times. RMS of repeatability <100 microns.
ii. Specific points for each axis will be allowed to be entered and then both rails will move toward commanded point
(b) Provide for manual (pendant control) and external computer control of all motion functions with readout for position and status.
i. Servo controller should provide remote communication interface drivers such as C style dynamically linked library and/or be VISA compatible, for remote programming via Python.
ii. Controller shall provide remote access to motion commands (e.g. position, velocity, acceleration, etc.) and status queries (e.g. in motion, errors, etc.)
iii. System shall remember location, motion settings and status in the event of a power failure. The system should restart in the last configuration and allow for a system reset to default conditions when instructed by the operator.
(c) Provide hard limit switched and programmable soft limit positions.
(d) Provide ability to preset programmed positions with one button “GO TO” command from both pendant and external software. The “GO TO” shall meet the positioning accuracy stated in 1*.
(e) Provide multiple emergency stop buttons around platform.
(f) Provide motion brakes for vertical axis that activate when not moving or under power-fail or E-stop conditions to prevent the table from moving under load.
(g) Provide method to prevent movement if any foreign object or personnel are below the vertical carriage and table.
(2) Install the positioner at the transmit port of the anechoic chamber.
(a) Clean and rust-proof steel mounting plates (mounting plates provided by NIST) or if necessary replace existing mounting plates with newly designed attachment hardware.
(b) Fasten the mounting plates to the concrete floor. (Floor drilling may have to be done by NIST facilities personnel.)
(c) Place the two-axis positioner in place on the mounting plates. Align the horizontal axis rails of the two-axis positioner parallel in both dimensions (azimuth and elevation) with the linear rails inside the anechoic chamber (see Fig. 2). Level the table cross range to AC Cart axis.
i. Horizontal Motion – best fit line of forward 75% of motion to be parallel to the motion of the robot base to within 0.007 degree* in both elevation and azimuth. Line calculated using best fit points while dynamically moving.
Measured by:
• Measurements of a Corner Cube Reflector (CCR) affixed to the table mounting corners.
• Taking dynamic motion without measuring beginning and ending 12.5%
• Measuring spatial scan w tracker taking data at 1 mm spacing
• 4 lines created by a CCR at each corner
• Best fit line will be within 0.007 degrees of level as measured by the laser tracker.
• This is an iterative measurement as alignment will have to be optimized
• Compound angle between the positioner and AC Cart axis is the root sum square of the elevation and azimuth angle difference.
• This is NOT a flatness specification.
ii. Vertical Motion –
• Vertical motion of the table
• Using the same CCR positions as the horizontal. Roll in the table, tilting in and out of the page in (top of Fig 2) will be minimized to less than 0.01 degrees
* The ability to meet this requirement may be limited by the existing construction and condition of the positioner rails, beams, and leadscrews. Any adjustment on the requirement must be approved by NIST.
** If the contractor feels that replacing the transmit positioner with a new positioning system with the same table size, range of motion and weight capability is more feasible and cheaper, they may submit a bid for a new table as well.
5. DELIVERY
a.
Description Format Quantity Due Date Initial Design Review (Contractor to provide information for required electrical service so CTL can initiate internal work order for said service)
Meeting and Documentation
1 30 days after award
Critical Design Review Meeting and Documentation
1 90 days after award
Installation Complete Onsite at NIST 1 180 days after award
Acceptance Testing Onsite at NIST 1 30 days after completion
Operational Documentation Hard copies, pdf 1 At completion Training Onsite at NIST 1 60 days after completion
b. Standards for Acceptance of Deliverables:
The TPOC/COR will provide comments on each deliverable within 14 calendar days from receipt of a given deliverable. The Contractor shall make any needed changes to the reports within 14 calendar days from receipt of electronic or written comments from the TPOC/COR. The TPOC/COR will provide written notification to the Contractor when a deliverable is accepted.
6. GOVERNMENT FURNISHED PROPERTY
a. NIST shall provide the complete X-Y positioner hardware pictured in Figure 1, including rails, support beams and frame, lead-screws, carriages, and bearings. NIST shall also provide six (6) steel mounting plates that may be used for installation on the concrete floor at the antenna port of the chamber.
b. Upon award of this requirement, the Government will provide the Contractor with all equipment needed in the performance of this requirement. The Government will also furnish the Contractor with an office, furnished with a desk, chair, computer and a telephone.
c. All property, data and information provided by the Government in the performance of this task remains the property of the Government and shall be surrendered to the government upon completion or termination of this requirement. Likewise, all deliverables generated under this requirement remain the property of the Government.
d. The Government will provide visitor’s access to the NIST facilities during the performance of this service contract.
7. SECURITY
a. NIST is a restricted campus. An identification badge is required for access for entry into buildings and is shown to the armed Security Police when entering the campus.
b. Regular Business Hours. Regular business hours are Monday through Friday, 8:00 am to
5:00 pm Mountain Standard Time.
c. Identification Badges: Contractor employees shall comply with NIST identification and access requirements. Each Contractor employee shall wear a visible identification badge provided by the NIST Security Office.
d. Vehicle Registration: All Contractor employees must register their vehicles with the NIST
Security Office to gain access to the campus. A valid driver’s license, Government-furnished civilian ID, proof of insurance and current registration must be presented to the NIST Security Office, at which time a NIST vehicle pass will be issued. The pass shall be displayed on the vehicle in accordance with NIST Security Office instructions.
8. TRAVEL
Vendor is responsible for all travel (fiscally and logistically) to and from NIST.
9. SPECIAL MATERIAL REQUIREMENTS
10. OTHER UNIQUE REQUIREMENTS
a. Warranty: At a minimum, all parts and labor shall be warranted for one (1) year from the date of project acceptance.
b. Confidential or Proprietary Data: This work does not involve confidential or proprietary data. The certification and accreditation requirements of Clause 1352.239-73 do not apply, and a security accreditation package is not required.
c. Safety: The Contractor employee shall be responsible for knowing and complying with all installation safety prevention regulations. Such regulations include, but are not limited to, general safety, fire prevention, and waste disposal.
11. PLACE OF PERFORMANCE
a. U.S. DOC/NIST 325 Broadway Bldg 11 Boulder, CO 80305
b. Day-to-day supervision and direct control over the work performed by on-site contractor personnel will be the sole responsibility of the contractor.
12. PERIOD OF PERFORMANCE
The period of performance shall not exceed six (6) months from award of this requirement.
Additional photos:
Figure 3. Transmit positioner horizontal axis
Figure 4. Transmit positioner vertical axis