Att. 2 Specifications .pdf

PDF 261 KB Posted

Attached to
Low Relative Intensity Noise 2-Watt Continuous Wave Laser Federal contract opportunity
Solicitation number
NB6720102502213
Issued by
Department of Commerce National Institute of Standards and Technology

About this file

This document is a Requirements/Specification Document for a Low RIN 2W CW laser issued by the National Institute of Standards and Technology (NIST), specifically from the Communications Technology Laboratory's RF Technology Division. The solicitation details two primary items: a Continuous Laser Source and a 5V DV Power Supply with precise technical specifications. The Continuous Laser Source requires a wavelength of 1550.12 nm (±40 pm), 2W output power, FC/APC and SMA RF connectors, frequency modulation up to 100kHz, and specific performance characteristics including low relative intensity noise and narrow linewidth.

Key procurement details include delivery to NIST-Boulder in 20 weeks after receipt (ARO), on-site acceptance within 7 business days, and a half-day virtual training session. The laser is intended to test electro-optic probe performance and enhance signal-to-noise measurements. Shipping will be to Ladan Arissian at NIST's Boulder location, with the base manufacturer's warranty considered acceptable. The solicitation emphasizes technical precision, with requirements for parameters like phase noise (better than 30 micro rad per root Hz at 10Hz) and linewidth (less than 1kHz).

View the file

Other files for this federal contract opportunity

Other files attached to Low Relative Intensity Noise 2-Watt Continuous Wave Laser, newest first.
File Type Posted
Att.1 RFQ-NB6720102502213.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requirements / Specification Document

TITLE: Low RIN 2W CW laser

Requesting Laboratory / Division / Group:

Communications Technology Laboratory RF Technology Division High-Speed Waveform Metrology Group 672.03

General Statement of Need:

This project required a narrow-linewidth continuous-wave (CW) laser with low intensity noise to test the performance of electro-optic (EO) probes and to enhance signal-to-noise measurements.

Item Specifications and Quantities:

Item 1: Continuous Laser Source Quantity: 1 Specifications: 1.1 Wavelength 1550.12 nm plus minus 40 pm

1.2 Output power 2W

1.3 FC/APC connector

1.4 SMA RF output connector

1.5 Frequency modulation up to 100kHz

1.6 RIN less that -150 dB/Hz at 100 kHz

1.7 Phase noise better than 30 micro rad per root Hz at 10Hz

1.8 RS232 connection

1.9 Linewidths od less than 1kHz

Item 2: 5 V DV Power Supply Quantity: 1 Specifications: 2.1 RS232 cable

Procurement Support Information and Ancillary Services:

[Provide input for each section Below or Mark Not Applicable (N/A)]

Section Requirements/Specifications

Planning Considerations ☒ N/A

☐ List any visits required to allow potential vendors to see site specific constraints.

[Explain Requirements.] ☐ US citizen required on-site (foreign nationals require pre-registration 30 days prior to visit.)

☐ Vendor Representative On-Site more than three (3) days.

☐ Other Considerations:

[List other considerations to ensure an accurate quote.]

Shipping & Delivery ☐ N/A

Shipping Address:

☒ NIST-Boulder

ATTN: Ladan Arissian Mail Stop: 672.00 325 Broadway Boulder, CO 80305

Shipping Criteria:

☐ Partial Delivery Acceptable

☐ [Enter Shipping and Delivery information by item.] ☐ Direct Delivery to OU Building Required [Explain Need for Requirement]

Building /Room Number: [Enter Building/Room Number] ☐ Building has Loading Dock

Containerization Preference: [Enter Container Type] Other Requirements:

[List Any Other Requirement] Delivery Date Criteria:

☐ Delivery Shall Be Competed No Later Than:

Click or tap to enter a date.

☐ Delivery Shall Be Made No Earlier Than:

Click or tap to enter a date.

☐ Scheduled Deliveries:

Item Number Due Date

☒ Other:

20 weeks ARO

Electronic Media ☒ N/A

[Enter Electronic Media Requirements by Item.]

☐ Software ☐ Electronic Manuals ☐ License Key ☐ Other:

[List Any Other Electronic Media Requirements] ☐ US Government Email Address for Software Delivery:

[Enter Address]

Installation

[Enter Installation Requirements by Item]

☐ Vendor Technician on Site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of Packaging Material ☐ Equipment Set Up ☐ Start-Up Services ☐ Turnkey Installation

NOTE: SME shall be the coordination POC.

Facility / Utility Considerations ☒ N/A

[List Site Specific Utility Considerations by Item] ☐ OFPM Work Order Numbers

[List Work Order Numbers]

☐ Power Available

Voltage: [Enter voltage] (V) Maximum Current: [Enter max current draw] (A) Phase: [Choose Phase]

Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter Plug Type] (i.e.: NEMA L5-20P) Environment: [Choose Environment] Other Power Considerations:

[List Any Other Power Considerations.]

☐ Utility Connections:

[List Relevant Available Utilities, Pressure(s) and Flowrate(s).]

☐ Other Considerations:

[List Other Considerations to Ensure an Accurate Quote.]

Inspection and Acceptance ☐ N/A

[Inspection Requirements Per Item (Who, When, What, Where)] ☐ On-Site

☒ Acceptance Not Expected to Exceed 7 Business Days

☐ Acceptance Expected to Exceed 7 Business Days:

[Duration]

☐ Inspection and Acceptance Plan:

[Explanation]

[Enter Other Requirements]

Training ☐ N/A

Training Requirements (Who, When, What, Where)

☐ Number of Trainees: [Enter Number of Trainees] ☐ On-Site

☐ Off-Site Location: [Enter Location(s)] Is Trainee Travel Required: [Choose Answer] Scope of Training ☒ Operation ☐ Maintenance ☐ Troubleshooting

☐ Safety ☐ Other [Enter Other Scope of Training Requirements] ☐ Training Materials to be Provided by Government:

[Describe Materials] ☐ Training Materials to be Provided by Vendor:

[Describe Materials] ☒ Other Virtual Training ½ day NOTE: SME shall be coordination POC.

Warranty ☐ N/A

Base Manufacturer Warranty is acceptable Warranty Length: [i.e. 3 - Years] What is included?

☐ Labor ☐ Parts ☐ Travel ☐ Cost and Liability for Returns

☐ Other

☐ 1 Option Period ☐ 2 Option Periods ☐ 3 Option Periods ☐ 4 Option Periods (Maximum)

Calibration

[Describe Calibration Requirements Per Item] Calibration Plan Length: [i.e. 3 - Years] What is Included?

☐ Labor ☐ Spare Parts ☐ Consumables

☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals

☐ Other [Enter Other Requirements] ☐ Requirements:

[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)

☐ 1 Option Period

Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods

Maintenance

[Describe Maintenance Requirements Per Item] Maintenance Plan Length: [i.e. 3 - Years] What is Included?

☐ Labor ☐ Spare Parts ☐ Consumables

☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals

☐ Other [Enter Other Requirements] ☐ Requirements:

[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)

☐ 1 Option Period

Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods

Government Furnished Material / Equipment ☒ N/A

List Any Government Furnished Material / Equipment Per Item] ☐ Samples for Testing

☐ Equipment which will leave Government Site

Description:

Serial Number:

NIST Property Number:

[Enter Description] [Enter Serial Number] [Enter NIST Property Number]

☐ Other: [Enter Other Details]

Travel

[Describe any Travel Requirements Per Item] ☐ Explain:

[Enter Justification / Requirement]

NOTE TO VENDOR: To the maximum extent possible, include travel requirement estimates as part of pertinent sections above (Installation, Maintenance, Repair, etc.). Otherwise, Travel will be a separate line item, reimbursable per the Federal Travel Regulation.

File details come from the government source that posted it. Updated .