NASRF Hatchery Buildings Q_A1.pdf

PDF 106 KB Posted

Attached to
PMAA, 4215, NASRF Isolation and Fish Staging Buildings
Solicitation number
IFB1 PMAA 2017000250 3
Issued by
Alamosa County, Denver City, Colorado

About this file

This is a Questions and Answers document from a state and local contract opportunity involving Colorado Parks and Wildlife and the NASRF Hatchery Buildings project, with participation from project officials including Bob D. Brosche, John Howard, Bill Kane, Dale Pizel, James Pribyl, and Robert W. Bray. The document addresses clarifications related to Invitation for Bid (IFB) 201 7*250 dated May 8, 20[17], concerning the construction and renovation of hatchery buildings. Key questions addressed structural excavation requirements, bid item specifications for foundation work, slab construction, and backfill procedures; trench spacing and isolation building specifications; building material manufacturer approvals; and structural height measurements for an 8-foot wall component. The document clarifies that trenches shall be spaced at 10-foot centers, that alternative approved manufacturers may be used if their products meet project specifications, and that wall height measurements are taken 8 feet above the finished floor or per drawing specifications without requiring formal acknowledgment in the bid.

The document does not provide specific pricing information, contract award dates, renewal options, or detailed funding sources. No set-aside provisions, incumbent contractor information, or specific response deadlines are stated in this Q&A document. The content focuses primarily on technical clarifications and construction specification details rather than contract terms or financial arrangements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bob D. Brosche John Howard, Vice

May 8, 20

IFB1: 201

Question

A

Question

A

Question

A

Question

A

Note thi package eid, Director, Colora e-Chair Bill Kane • D

Nat

17*250 n: Why is ex Item 2 an

Answer: Stru performe whereas B n: Can you

Answer: The n: Is the con

Answer: An may be manufact (though n n: Is the 8’ wall?

Answer: Th specificat s is not an ado Parks and Wildlif Dale Pizel James Pr tive Aquatic xcavation, b nd Bid Item uctural exc d associate Bid Item 2 re verify the s trenches sh ntractor req alternative approved b turer it can not necessar

’ height of is height s tions.

Addendum fe • Parks and Wildlif ribyl, Chair James

PROJEC

cs Species R backfill, and 3?

cavations re ed with the efers to all o spacing betw hall be space quired to us e building m by the Proj be submitte ry).

FRB measu shall be m and does n fe Commission: Robe Vigil Dean Wingfie

CT QUESTIO

Restoration d compactio eferenced in e foundation other neces ween trenc ed at 10’ on se one of th manufacturer ject Manage ed to the Pr red from ab measured 8 not need to ert W. Bray • Chris C ld Michelle Zimme

ONS

Facility – H on listed in n Bid Item n, slab and sary site wo hes in the I center typi e listed bui r that meets

er. If there roject Manag bove the fl

8’ above fi o be acknow

Castilian Jeanne Ho erman, Secretary A

Hatchery Bu the descrip

3 refer to d other str ork.

solation bu ical for all d ilding manu s the buildin e is concer ger prior to oor or the inished floo wledged as orne Alex Zipp ildings ption of both o any earth uctural fea ilding?

drains.

facturers?

ng specifica rn of a spe the bid ope top of the or per dra such in the h Bid hwork tures ations ecific ening stem awing e bid