NASA cornerstone engraving SOW.docx

DOCX document 2 MB Posted

Attached to
Engraving Hampton VA Federal contract opportunity
Solicitation number
EQPAAB-26-0003
Issued by
Not on record

About this file

This is a Statement of Work (SOW) for professional stone engraving and inlay services at NASA's Flight Dynamics Research Facility in Hampton, Virginia. The contractor must provide on-site sandblasted engraving with hand V-cut decorative outlining on existing wall panels, fabricate a polished Absolute Black Granite seal in the shop for sandblast engraving and inlay into the limestone wall on-site, and complete finishing work including painted lettering and cleaning of the immediate work area. All work must be completed by July 31, 2026, in time for the facility dedication.

Work shall be performed during standard business hours (Monday-Friday, 6:00 AM to 2:30 PM) with all submittals due within one week of contract award. The government will provide all artwork, approved drawings, and final spell checks, as well as on-site parking for equipment and air compressors. The scope explicitly excludes overtime or weekend work, gold leaf gilding, and general building cleaning beyond the immediate work area. The related solicitation (EQPAAB-26-0003) indicates an anticipated award date of July 21, 2026, and invites all responsible sources to submit quotations.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW)

1.1 Objective To provide professional stone engraving and inlay services at the Flight Dynamics Research Facility (20 Langley Blvd., Hampton, VA 23666). All work to be completed prior to the dedication on July 31, 2026.

1.2 Scope of Services

· Engraving: On-site sandblasted engraving and hand V-cut decorative outlining on existing wall panels.

· Granite Seal Inlay: Shop fabrication of a polished Absolute Black Granite seal, to be sandblast-engraved and inlaid into the limestone wall on-site.

· Finishing: Lettering to be painted as required, followed by a cleaning of the immediate work area.

1.3 Performance Requirements

· Work Hours: Standard hours are Monday–Friday, 6:00 AM – 2:30 PM.

· Timeline: All submittals are due within one week of contract award, with all on-site work to be completed by July 31, 2026.

· Government Furnished Information (GFI): The government shall provide all artwork, approved drawings, and final spell checks.

· Site Access: The government will provide on-site parking close to the work area for necessary equipment and air compressors.

1.4 Exclusions This scope excludes overtime or weekend work, gold leaf gilding, and general building cleaning beyond the immediate work area.