SOL[NAFIB3-18-Q-0018].pdf

PDF 220 KB Posted

Attached to
Roller Skates for CYS Program
Solicitation number
NAFIB3-18-Q-0018
Issued by

About this file

Solicitation No. NAFIB3-18-Q-0018 Roller Skates for CYS Program, USAG-Humphrey

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE OF PAGESNo appropriated funds of the United States shall become due or paid the contractor by reason of this Request for Quotation.

REQUEST FOR QUOTATIONS

(Nonappropriated Funds)

(THIS IS NOT AN ORDER) 1 3

APO AP 96205-5742

Korea Office supporting IMCOM-Pacific

a. NAME OF CONSIGNEE

9. DESTINATION

(See Schedule)

OTHER

FOB DESTINATIONX

7. DELIVERY

6. DELIVERY BY (Date)

See Schedule

5b. FOR INFORMATION CALL: (No collect calls)

Unit # 15742 On Behalf Of Enterprise Fund

IMCOM G9 NAF Contracting Department of the Army5a. ISSUED BY

PRKD1-JH-G1-17-0004

3. REQUISITION/PURCHASE REQUEST NO.

03/15/2018

2. DATE ISSUED

NAFIB3-18-Q-0018

1. REQUEST NO.

11. SCHEDULE (Include applicable Federal, State and local taxes)

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the NAFI to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.03/21/2018 1700 CS

10. PLEASE FURNISH QUOTATIONS TO

THE ISSUING OFFICE IN BLOCK 5a ON

OR BEFORE CLOSE OF BUSINESS (Date)

e. ZIP CODEd. STATEf. ZIP CODEe. STATEd. CITY

c. CITYc. STREET ADDRESS

b. COMPANYa. NAME

8. TO:

b. STREET ADDRESS

NUMBER

7918-544202

AREA CODE

TELEPHONE NUMBER

Yun-Hui Kim

NAME

ITEM NO.

(a)

SUPPLIES/SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

Roller Skates

(See schedule for more details)

12. DISCOUNT FOR PROMPT PAYMENT

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations

13. NAME AND ADDRESS OF QUOTER

b. STREET ADDRESS

c. COUNTY

d. CITY e. STATE f. ZIP CODE

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

16. SIGNER

a. NAME (Type or print)

c. TITLE (Type or print)

a. NAME OF QUOTER

AREA CODE

NUMBER

15. DATE OF QUOTATION

b. TELEPHONE are are not attached

DA FORM 4067, NOV 04

For use of this form see AR 215-4;

the proponent agency is OACSIM

THE SCHEDULE

1. SUPPLIES OR SERVICES AND PRICES/COSTS:

CLIN Description of Items Qty Unit U/Price Amount

0001 Roller Skates 75 PR

0002 Freight 1 EA

2. DESCRIPTION/SPECS/WORK STATEMENT:

a. Items shall be the same or equal to the item description as shown below.

- 4 Wheels

- Any Color (offerors shall provide color options)

- Synthetic Leather Boot

- 3/4 Boot

- Reinforced Toe

- Sure Grip Probe Nylon Plates

- Indoor Wheels

- ABEC-5

- American Sizes: Youth and Adult size (determined after contract awarded)

b. Offerors shall provide the specifications and catalogue or picture of item, and estimate lead time with their quotation.

3. PREPARATION FOR DELIVERY:

Preservation, packaging and packing shall conform to MIL-Standard 129, Level A. Level of packing shall afford adequate protection against damage in accordance with durability of item(s) during shipment from supply source to receiving activity. A packing list shall be included with each shipment.

4. INSPECTION AND ACCEPTANCE:

a. The final inspection and acceptance will be performed by the Requiring Activity or Receiving Officer at the delivery point.

b. RESPONSIBILITY FOR SUPPLIES (NOV 2004) (BE-004)

(a) Title to supplies furnished under this contract shall pass to the NAFI upon formal acceptance, regardless of when or where the NAFI takes physical possession, unless the contract specifically provides for earlier passage of title.

(b) Unless the contract specifically provides otherwise, risk of loss of or damage to supplies shall remain with the Contractor until, and shall pass to the NAFI upon

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Acceptance by the NAFI or delivery of the supplies to the NAFI at the destination specified in the contract, whichever is later, if transportation is f.o.b. destination.

(c) Paragraph (b) of this section shall not apply to supplies that so fail to conform to contract requirements as to give a right of rejection. The risk of loss of or damage to such nonconforming supplies remains with the Contractor until cure or acceptance. After cure or acceptance, paragraph (b) of this section shall apply.

(d) Under paragraph (b) of this section, the Contractor shall not be liable for loss of or damage to supplies caused by the negligence of officers, agents, or employees of the NAFI acting within the scope of their employment.

(End of clause).

5. DELIVERY OR PERFORMANCE:

a. Time of Delivery: Delivery of quantity specified under the schedule is requested not later than ten (10) days after receipt of order. (Preferred not required)

b. Delivery Point:

(1) (For US vendors) Tracy Army Depot, 25600 Chrisman Road, Tracy, CA 95376 (Shipping instruction will be provided with order)

(2) (For local vendors) Youth Sports, USAG-Humphreys, DF&MWR, Unit # 15228, Pyeongtaek, Kyonggi-do, Korea

6. ORDER ADMINISTRATION DATA:

a. Consideration and payment: In consideration for the performance accepted hereunder the Paying Office will make payment to the contractor via Electronic Funds Transfer (EFT) no later than 30 days from date of receipt of invoice in paying office or acceptance of material, whichever is later.

b. Invoices for payment shall be submitted to the following address: (E-mail submission will be acceptable)

Central Accounting Office Army Finance and Accounting Service-Korea Attn: EARM-FMC-CA Unit # 15236 Email: usarmy.yongsan.8-army.mbx.175-fmsc-cao-documents@mail.mil mailto:usarmy.yongsan.8-army.mbx.175-fmsc-cao-documents@mail.mil

I - Contract Clauses

Clauses

BI.001 DEFINITIONS (NOV 2004)

(a) "Head of the agency" (also called "agency head"), including any deputy or assistant chief official of the agency; and the term "authorized representative" means any person, persons, or board (other than the Contracting Officer) authorized to act for the head of the agency or Secretary.

(b) "Contracting Officer" means a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.

(c) "Commercial Item" means a product or a service (e.g., items, supplies, materials, components) sold or traded to the general public in the course of conducting normal business operations at established catalog or market prices.

(d) Except as otherwise provided in this contract, the term "subcontracts" includes, but is not limited to, purchase orders and changes and modifications to purchase orders under this contract.

(End of clause)

BI.002 NONAPPROPRIATED FUND INSTRUMENTALITY (NOV 2004)

The Nonappropriated Fund Instrumentality (NAFI), which is party to this contract, is a nonappropriated fund instrumentality of the Department of the Army. NO APPROPRIATED FUNDS OF THE UNITED

STATES SHALL BECOME DUE OR BE PAID THE CONTRACTOR BY REASON OF THIS

CONTRACT. This contract is NOT subject to The Contract Disputes Act of 1978.

(End of clause)

BI.004 PROTECTING THE NAFI'S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED OR PROPOSED FOR DEBARMENT (DEC 2010)

(a) The Government suspends or debars Contractors to protect the Government's/NAFI's interests.

The Contractor shall not enter into any subcontract in excess of $30,000 with a Contractor that is debarred, suspended, or proposed for debarment unless there is a compelling reason to do so.

(b) The Contractor shall require each proposed first-tier subcontractor, whose subcontract will exceed $30,000, to disclose to the Contractor, in writing, whether as of the time of award of the subcontract, the subcontractor, or its principals, is or is not debarred, suspended, or proposed for debarment by the Federal Government.

(c) A corporate officer or a designee of the Contractor shall notify the Contracting Officer, in writing, before entering into a subcontract with a party that is debarred, suspended, or proposed for debarment (see FAR 9.404 for information on the Excluded Parties List System). The notice must include the following:

(1) The name of the subcontractor.

(2) The Contractor's knowledge of the reasons for the subcontractor being in the Excluded Parties List System.

(3) The compelling reason(s) for doing business with the subcontractor notwithstanding its inclusion in the Excluded Parties List System.

(4) The systems and procedures the Contractor has established to ensure that it is fully protecting the NAFI's interests when dealing with such subcontractor in view of the specific basis for the party's debarment, suspension, or proposed debarment.

(End of clause)

BI.010 INVOICES (APR 2011)

(a) An invoice is a written request for payment under the contract for supplies delivered or for services rendered. In order to be proper, an invoice must include as applicable the following:

(1) Name and address of the contractor.

(2) Invoice date.

(3) Contract number or other authorization for supplies delivered, services performed (including order number and contract line item number).

(4) Description, quantity, unit of measure, unit price and extended price of supplies delivered or services performed.

(5) Shipping and payment terms (e.g., shipment number and date of shipment, prompt payment discount terms). Bill of lading number and weight of shipment will be shown for shipments on Government/NAFI bills of lading.

(6) Name and address of contractor official to whom payment is to be sent (must be the same as that on the contract or on a proper notice of assignment).

(7) Name (where applicable), title, phone number, mailing address of person to be notified in event of defective invoice.

(8) Any other information or documentation required by the contract (such as evidence of shipment). Invoices shall be prepared and submitted in duplicate (one copy shall be marked "original") unless otherwise specified.

(b) For purposes of determining if interest begins to accrue under the Prompt Payment Act (Public Law 97-177, as amended).

(1) A proper invoice will be deemed to have been received when it is received by the office designated in the contract for receipt of invoices and acceptance of the supplies delivered or services rendered has occurred;

(2) Payment shall be considered made on the date on which check for such payment is dated;

(3) Payment terms (e.g., "net 20") offered by the contractor will not be deemed a "required payment date"; and

(4) The following periods of time will not be included:

(i) after receipt of an improper invoice and prior to notice of any defect or impropriety, but not to exceed 7 days (3 days on contracts for meat food products, and 5 days on contacts for perishable agricultural commodities, dairy products, edible fats or oils and food products prepared from edible fats or oils);

and

(ii) between the date of a notice of any defect or impropriety and the date a proper invoice is received. When the notice is in writing, it shall be considered made on the date shown on the notice.

(5) If the NAFI makes payment by Electronic Funds Transfer (EFT) (see applicable contract clause). In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purposes of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(End of clause)

BI.011 EXAMINATION OF RECORDS (NOV 2005)

(a) The Contractor agrees that the Contracting Officer or the Contracting Officer's duly authorized representative shall have the right to examine and audit the books and records of the Contractor directly pertaining to the contract during the period of the contract and until the expiration of three years after the final payment under the contract.

(b) The Contractor agrees to include the clause in (a) above, in all subcontracts.

(End of clause)

BI.055 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (DEC 2010)

(a) Except as authorized by the Office of Foreign Assets Control (OFAC) in the Department of the Treasury, the Contractor shall not acquire, for use in the performance of this contract, any supplies or services if any proclamation, Executive order, or statute administered by OFAC, or if OFAC's implementing regulations at 31 CFR Chapter V, would prohibit such a transaction by a person subject to the jurisdiction of the United States.

(b) Except as authorized by OFAC, most transactions involving Cuba, Iran, and Sudan are prohibited, as are most imports from Burma or North Korea, into the United States or its outlying areas. Lists of entities and individuals subject to economic sanctions are included in OFAC's List of Specially Designated Nationals and Blocked Persons at http://www.treas.gov/offices/enforcement/ofac/sdn/. More information about these restrictions, as well as updates, is available in the OFAC's regulations at 31 CFR Chapter V and/or on OFAC's website at http://www.treas.gov/offices/enforcement/ofac.

(c) The Contractor shall insert this clause, including this paragraph (c), in all subcontracts.

(End of clause)

BI.056 INCONSISTENCY BETWEEN ENGLISH VERSION AND TRANSLATION OF

CONTRACT (NOV 2004)

In the event of inconsistency between any terms of this contract and any translation thereof into another language, the English language meaning shall control.

(End of clause)

BI.068 PAYMENTS (NOV 2004)

The NAFI will pay the Contractor, upon the submission of proper invoices or vouchers, the prices stipulated in this contract for supplies delivered and accepted or services rendered and accepted, less any deductions provided in this contract. Unless otherwise specified in this contract, payments will be made on partial deliveries accepted by the NAFI if-

(a) The amount due on the deliveries warrants it, or

(b) The Contractor requests it and the amount due to the deliveries is at least $1,000 or 50 percent of the total contract price.

(End of clause)

BI.070 DISCOUNTS FOR PROMPT PAYMENT (NOV 2004)

(a) Discounts for prompt payment will not be considered in the evaluation of offers. However, any offered discount will form a part of the award, and will be taken if payment is made within the discount period indicated in the offer by the offeror. As an alternative to offering a prompt payment discount in conjunction with the offer, offerors awarded contracts may include prompt payment discounts on individual invoices.

(b) In connection with any discount offered for prompt payment, time shall be computed from the date of the invoice. If the Contractor has not placed a date on the invoice, the due date shall be calculated from the date the designated billing office receives a proper invoice, provided the agency annotates such invoice with the date of receipt at the time of receipt. For the purpose of computing the discount earned, payment shall be considered to have been made on the date that appears on the payment check or, for an electronic funds transfer, the specified payment date.

When the discount date falls on a Saturday, Sunday, or legal holiday when Federal Government offices are closed and NAFI financial management activities are not expected to be conducted, payment may be made on the following business day.

(End of clause)

BI.073 EXTRAS (NOV 2004)

Except as otherwise provided in this contract, no payment for extras shall be made unless the Contracting Officer has authorized such extras and the price in writing.

(End of clause)

BI.074 PROMPT PAYMENT (APR 2011)

Notwithstanding any other payment clause in this contract, the NAFI will make invoice payments and contract financing payments under the terms and conditions specified in this clause. Payment shall be considered as being made on the day a check is dated or the date of an electronic funds transfer. All days referred to in this clause are calendar days, unless otherwise specified. (However, see subparagraph (a)(4) of this clause concerning payments due on Saturdays, Sundays, and legal holidays.)

(a) Invoice payments-

(1) Due date.

(i) Except as indicated in subparagraph (a)(2) of this clause, the due date for making invoice payments by the designated payment office shall be the later of the following two events:

(A) The 30th day after the designated billing office has received a proper invoice from the Contractor (except as provided in subdivision (a)(1)(ii) of this clause).

(B) The 30th day after Government/NAFI acceptance of supplies delivered or services performed by the Contractor. On a final invoice where the payment amount is subject to contract settlement actions, acceptance shall be deemed to have occurred on the effective date of the contract settlement.

(ii) If the designated billing office fails to annotate the invoice with the actual date of receipt at the time of receipt, the invoice payment due date shall be the 30th day after the date of the Contractor's invoice; provided a proper invoice is received and there is no disagreement over quantity, quality, or Contractor compliance with contract requirements.

(2) Certain food products and other payments.

(i) Due dates on Contractor invoices for meat, meat food products, or fish;

perishable agricultural commodities; and dairy products, edible fats or oils, and food products prepared from edible fats or oils are-

(A) For meat or meat food products, as defined in section 2(a)(3) of the Packers and Stockyard Act of 1921 (7 U.S.C.182(3)), and as further defined in Pub.L.98-181, including any edible fresh or frozen poultry meat, any perishable poultry meat food product, fresh eggs, and any perishable egg product, as close as possible to, but not later than, the 7th day after product delivery.

(B) For fresh or frozen fish, as defined in section 204(3) of the Fish and Seafood Promotion Act of 1986 (16 U.S.C.4003(3)), as close as possible to, but not later than, the 7th day after product delivery.

(C) For perishable agricultural commodities, as defined in section 1(4) of the Perishable Agricultural Commodities Act of 1930 (7 U.S.C.499a(4)), as close as possible to, but not later than, the 10th day after product delivery, unless another date is specified in the contract.

(D) For dairy products, as defined in section 111(e) of the Dairy Production Stabilization Act of 1983 (7 U.S.C. 4502(e)), edible fats or oils, and food products prepared from edible fats or oils, as close as possible to, but not later than, the 10th day after the date on which a proper invoice has been received. Liquid milk, cheese, certain processed cheese products, butter, yogurt, ice cream, mayonnaise, salad dressings, and other similar products, fall within this classification.

Nothing in the Act limits this classification to refrigerated products.

When questions arise regarding the proper classification of a specific product, prevailing industry practices will be followed in specifying a contract payment due date. The burden of proof that a classification of a specific product is, in fact, prevailing industry practice is upon the Contractor making the representation.

(ii) If the contract does not require submission of an invoice for payment (e.g., periodic lease payments), the due date will be as specified in the contract.

(3) Contractor's invoice. The Contractor shall prepare and submit invoices to the designated billing office specified in the contract. A proper invoice must include the items listed in subdivisions (a)(3)(i) through (a)(3)(viii) of this clause. If the invoice does not comply with these requirements, it shall be returned within 7 days after the date the designated billing office received the invoice (3 days for meat, meat food products, or fish; 5 days for perishable agricultural commodities, edible fats or oils, and food products prepared from edible fats or oils), with a statement of the reasons why it is not a proper invoice. Untimely notification will be taken into account in computing any interest penalty owed the Contractor in the manner described in subparagraph (a)(5) of this clause.

(i) Name and address of the Contractor.

(ii) Invoice date. (The Contractor is encouraged to date invoices as close as possible to the date of the mailing or transmission.)

(iii) Contract number or other authorization for supplies delivered or services performed (including order number and contract line item number).

(iv) Description, quantity, unit of measure, unit price, and extended price of supplies delivered or services performed.

(v) Shipping and payment terms (e.g., shipment number and date of shipment, prompt payment discount terms). Bill of lading number and weight of shipment will be shown for shipments on Government bills of lading.

(vi) Name and address of Contractor official to whom payment is to be sent (must be the same as that in the contract or in a proper notice of assignment).

(vii) Name (where practicable), title, phone number, and mailing address of person to be notified in the event of a defective invoice.

(viii) Any other information or documentation required by the contract (such as evidence of shipment).

(ix) While not required, the Contractor is strongly encouraged to assign an identification number to each invoice.

(4) Interest penalty. An interest penalty shall be paid automatically by the designated payment office, without request from the Contractor, if payment is not made by the due date and the conditions listed in subdivisions (a)(4)(i) through (a)(4)(iii) of this clause are met, if applicable. However, when the due date falls on a Saturday, Sunday, or legal holiday when Federal Government offices are closed and Government/NAFI business is not expected to be conducted, payment may be made on the following business day without incurring a late payment interest penalty.

(i) The designated billing office received a proper invoice.

(ii) A receiving report or other Government/NAFI documentation authorizing payment was processed, and there was no disagreement over quantity, quality, or Contractor compliance with any contract term or condition.

(iii) In the case of a final invoice for any balance of funds due the Contractor for supplies delivered or services performed, the amount was not subject to further contract settlement actions between the NAFI and the Contractor.

(5) Computing penalty amount. The interest penalty shall be at the rate established by the Secretary of the Treasury under Section 12 of the Contract Disputes Act of 1978 (41 U.S.C. 611, however other provisions of the Act are not applicable to NAFIs see Disputes Clause) that is in effect on the day after the due date, except where the interest penalty is prescribed by other governmental authority (e.g., tariffs). This rate is referred to as the "Renegotiation Board Interest Rate," and it is published in the Federal Register semiannually on or about January 1 and July 1. The interest penalty shall accrue daily on the invoice principal payment amount approved by the NAFI until the payment date of such approved principal amount; and will be compounded in 30-day increments inclusive from the first day after the due date through the payment date. That is, interest accrued at the end of any 30-day period will be added to the approved invoice principal payment amount and will be subject to interest penalties if not paid in the succeeding 30-day period. If the designated billing office failed to notify the Contractor of a defective invoice within the periods prescribed in subparagraph (a)(3) of this clause, the due date on the corrected invoice will be adjusted by subtracting from such date the number of days taken beyond the prescribed notification of defects period. Any interest penalty owed the Contractor will be based on this adjusted due date. Adjustments will be made by the designated payment office for errors in calculating interest penalties.

(i) For the sole purpose of computing an interest penalty that might be due the Contractor, Government/NAFI acceptance shall be deemed to have occurred constructively on the 7th day (unless otherwise specified in this contract) after the Contractor delivered the supplies or performed the services in accordance with the terms and conditions of the contract, unless there is a disagreement over quantity, quality, or Contractor compliance with a contract provision. In the event that actual acceptance occurs within the constructive acceptance period, the determination of an interest penalty shall be based on the actual date of acceptance. The constructive acceptance requirement does not, however, compel Government/NAFI officials to accept supplies or services, perform contract administration functions, or make payment prior to fulfilling their responsibilities.

(ii) The following periods of time will not be included in the determination of an interest penalty:

(A) The period taken to notify the Contractor of defects in invoices submitted to the NAFI, but this may not exceed 7 days (3 days for meat, meat food products, or fish; 5 days for perishable agricultural commodities, dairy products, edible fats or oils, and food products prepared from edible fats or oils).

(B) The period between the defects notice and resubmission of the corrected invoice by the Contractor.

(C) For incorrect electronic funds transfer (EFT) information, in accordance with the EFT clause of this contract.

(iii) Interest penalties will not continue to accrue after the filing of a claim for such penalties under the clause Disputes, or for more than 1 year. Interest penalties of less than $1 need not be paid.

(iv) Interest penalties are not required on payment delays due to disagreement between the NAFI and the Contractor over the payment amount or other issues involving contract compliance or on amounts temporarily withheld or retained in accordance with the terms of the contract. Claims involving disputes, and any interest that may be payable, will be resolved in accordance with the clause entitled Disputes.

(6) Prompt payment discounts. The designated payment office also shall pay an interest penalty automatically without request from the Contractor, if a discount for prompt payment is taken improperly. The interest penalty will be calculated as described in subparagraph (a)(5) of this clause on the amount of discount taken for the period beginning with the first day after the end of the discount period through the date when the Contractor is paid.

(7) Additional interest penalty.

(i) A penalty amount, calculated in accordance with subdivision (a)(7)(iii) of this clause, shall be paid in addition to the interest penalty amount if the Contractor-

(A) Is owed an interest penalty of $1 or more;

(B) Is not paid the interest penalty within 10 days after the date the invoice amount is paid; and

(C) Makes a written demand to the designated payment office for additional penalty payment, in accordance with subdivision (a)(7)(ii) of this clause, postmarked no later than 40 days after the invoice amount is paid.

(ii)(A) Contractors shall support written demands for additional penalty payments with the following data. No additional data shall be required.

Contractors shall-

(1) Specifically assert that late payment interest is due under a specific invoice, and request payment of all overdue late payment interest penalty and such additional penalty as may be required;

(2) Attach a copy of the invoice on which the unpaid late payment interest was due; and

(3) State that payment of the principal has been received, including the date of receipt.

(B) Demands must be postmarked on or before the 40th day after payment was made, except that-

(1) If the postmark is illegible or nonexistent, the demand must have been received and annotated with the date of receipt by the designated payment office on or before the 40th day after payment was made; or

(2) If the postmark is illegible or nonexistent and the designated payment office fails to make the required annotation, the demand's validity will be determined by the date the Contractor has placed on the demand; provided such date is no later than the 40th day after payment was made.

(iii)(A) The additional penalty shall be equal to 100 percent of any original late payment interest penalty except

(1) The additional penalty shall not exceed $5,000;

(2) The additional penalty shall never be less than $25; and

(3) No additional penalty is owed if the amount of the underlying interest penalty is less than $1.

(B) If the interest penalty ceases to accrue in accordance with the limits stated in subdivision (a)(5)(iii) of this clause, the amount of the additional penalty shall be calculated on the amount of interest penalty that would have accrued in the absence of these limits, subject to the overall limits on the additional penalty specified in subdivision (a)(7)(iii)(A) of this clause.

(C) For determining the maximum and minimum additional penalties, the test shall be the interest penalty due on each separate payment made for each separate contract. The maximum and minimum additional penalty shall not be based upon individual invoices unless the invoices are paid separately. Where payments are consolidated for disbursing purposes, the maximum and minimum additional penalty determination shall be made separately for each contract therein.

(D) The additional penalty does not apply to payments regulated by other Government regulations (e.g., payments under utility contracts subject to tariffs and regulation).

(b) Contract financing payments-

(1) Due dates for recurring financing payments. If this contract provides for contract financing, requests for payment shall be submitted to the designated billing office as specified in this contract or as directed by the Contracting Officer. Contract financing payments shall be made on the [] day after receipt of a proper contract-financing request by the designated billing office. In the event that an audit or other review of a specific financing request is required to ensure compliance with the terms and conditions of the contract, the designated payment office is not compelled to make payment by the due date specified.

(2) Due dates for other contract financing. For advance payments, loans, or other arrangements that do not involve recurring submissions of contract financing requests, payment shall be made in accordance with the corresponding contract terms or as directed by the Contracting Officer.

(3) Interest penalty not applicable. Contract financing payments shall not be assessed an interest penalty for payment delays.

(c) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government/NAFI has otherwise overpaid on a contract financing or invoice payment, the Contractor shall

(1) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the-

(i) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(ii) Affected contract number and delivery order number if applicable;

(iii) Affected contract line item or subline item, if applicable; and

(iv) Contractor point of contact.

(2) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

(End of clause)

BI.077 MANDATORY INFORMATION FOR ELECTRONIC FUNDS TRANSFER (NOV 2004)

(a) Method of payment. All payments by the NAFI under this contract shall be made by electronic funds transfer (EFT), except as provided in paragraph (b) of this clause.

(b) Exceptions to the EFT are as follows:

(1) Contracts awarded to companies located in OCONUS

(2) Contracts denominated or paid in other than US currency

(3) Classified contracts when such payments would compromise national security

(4) Contracts executed by deployed Contracting Officers in the course of military operations

(5) Contracts executed by any Contracting Officer in the course of emergency operations, e.g., responses to natural disaster or national or civil emergencies

(c) Waiver. The servicing accounting office may waive payment by EFT under the following situations:

(1) Sole Proprietorship Contractors. Sole Proprietorship Contractors may elect, in writing, to be designated as individuals and paid by check. Waiver will be granted to all such Contractors.

(2) Infrequently used Contractors. The servicing accounting office will make a determination, at its own discretion, whether or not to use EFT to pay infrequently used Contractors. Generally, this will apply only to those Contractors paid no more than once a year.

(3) Advance checks for Entertainers. Entertainers may be paid by check when the servicing accounting office determines this to be the most appropriate method of payment.

(d) Mandatory submission of Contractor's EFT information.

(1) The Contractor is required to provide the payment office with the following information required to make payment by EFT.

(i) Name and address of the Contractor

(ii) Nine-digit Routing Transit Number of the Contractor's financial agent

(iii) Contractor's account number, title of account, and the type of account (checking or savings)

(2) Any changes to the Contractor's original information, to include the closure of account, must be provided to the payment office at least 30 days prior to the effective date of payment.

(e) Mechanisms for EFT payment. The NAFI may make payment by EFT through the Automated Clearing House (ACH) network, subject to the rules of the National Automated Clearing House Association.

(f) Suspension of payment.

(1) The NAFI is not required to make any payment under this contract until after receipt, by the designated office, of the correct EFT payment information from the Contractor.

Until receipt of the correct EFT information, any invoice or contract financing request shall be deemed not to be a proper invoice for the purpose of prompt payment under this contract. The prompt payment terms of the contract regarding notice of an improper invoice and delays in accrual of interest penalties apply.

(2) If the EFT information changes, the NAFI shall begin using the new information no later than 30 days after receipt by the designated office. However, the Contractor may request that no further payments be made until the payment office implements the updated EFT information. If such suspension would result in a late payment under the prompt payment terms of this contract, the Contractor's request for suspension shall extend the due date for payment by the number of days of the suspension.

(g) Liability for uncompleted or erroneous transfers.

(1) If an uncompleted or erroneous transfer occurs because the NAFI used the Contractor's EFT information incorrectly, the NAFI remains responsible for-

(i) Making a correct payment;

(ii) Paying any prompt payment penalty due; and

(iii) Recovering any erroneously directed funds.

(2) If an uncompleted or erroneous transfer occurs because the Contractor's EFT information was incorrect, and-

(i) If the funds are no longer under the control of the payment office, the NAFI is deemed to have made payment and the Contractor is responsible for recovery of any erroneously directed funds; or

(ii) If the funds remain under the control of the payment office, the NAFI shall not make payment and the provisions of paragraph (f) shall apply.

(h) EFT and prompt payment. A payment shall be deemed to have been made in a timely manner in accordance with the prompt payment terms of this contract if the date specified for settlement of the payment is on or before the prompt payment due date.

(i) EFT and assignment of claims. If the Contractor assigns the proceeds of this contract as provided for in the assignment of claims terms of this contract, the Contractor shall require as a condition of any such assignment, that the assignee shall provide the EFT information required by paragraph (d) of this clause to the designated office, and shall be paid by EFT in accordance with the terms of this clause. In all respects, the requirements of this clause shall apply to the assignee as if it were the Contractor.

(j) Liability for change of EFT information by financial agent. The NAFI is not liable for errors resulting from changes to EFT information provided by the Contractor's financial agent.

(End of clause)

BI.079 DISPUTES (NOV 2004)

(a) This contract is subject to the rules and regulations promulgated by the Secretary of Defense and Secretary of the Army for NAF contracting.

(b) The contract is not subject to the Contract Disputes Act of 1978 (41 U.S.C. 60I-613).

(c) All disputes arising under or relating to this contract shall be resolved under this clause.

(d) "Claims," as used in this clause, means a written demand or written assertion by one of the contracting parties seeking, as a matter of right, the payment of money in a sum certain, the adjustment or interpretation of contract forms, or other relief arising under or relating to this contract. A claim arising under a contract, unlike a claim relating to that contract, is a claim that can be resolved under a contract clause that provides for the relief sought by the claimant. A voucher, invoice, or other routine request for payment that is not in dispute when submitted is not a claim under this clause. The submission may be converted to a claim under this clause, by complying with the submission requirements of this clause. if it is disputed either as to liability or amount or is not acted upon in a reasonable time.

(e) (1) A claim by the Contractor shall be made in writing and submitted to the Contracting Officer for a written decision. A claim by the NAFI against the Contractor shall be subject to a written decision by the Contracting Officer.

(2) For Contractor claims exceeding $100,000, the Contractor shall submit with the claim a certification that-

(i) The claim is made in good faith;

(ii) Supporting data are accurate and complete to the best of the Contractor's knowledge and belief; and

(iii) The amount requested accurately reflects the contract adjustment for which the contractor believes the NAFI is liable.

(3) (i) If the Contractor is an individual, the certification shall be executed by that individual.

(ii) If the Contractor is not an individual, the certification shall be executed by-

(A) A senior company official in charge at the Contractor's plant or location involved, or

(B) An officer or general partner of the Contractor having overall responsibility for the conduct of the Contractor's affairs.

(f) For contract claims of $100,000 or less, the Contracting Officer must, if requested in writing by the Contractor, render a decision within 60 days of the request. For Contractor-certified claims over $100,000, the Contracting Officer must, within 60 days, decide the claim or notify the Contractor of the date by which the decision will be made.

(g) The Contracting Officer's decision shall be final unless the contractor appeals as provided in paragraph (h) of this clause.

(h) The Contracting Officer's decision on claims may be appealed by submitting a written appeal to the Armed Services Board of Contract Appeals within 90 days of receipt of the Contracting Officer's final decision. Decisions of the Armed Services Board of Contract Appeals are final and are not subject to further appeal.

(i) The Contractor shall proceed diligently with performance of this contract, pending final resolution of any request for relief, claim, appeal, or action arising under the contract, and comply with any decision of the Contracting Officer.

(End of clause)

BI.104 CHANGES (NOV 2004)

(a) The Contracting Officer may at any time, by written order, and without notice to the sureties, if any, make changes within the general scope of this contract in any one or more of the following:

(1) Drawings, designs, or specifications when the supplies to be furnished are to be specially manufactured for the NAFI in accordance with the drawings, designs, or specifications.

(2) Method of shipment or packing.

(3) Place of delivery.

(b) If any such change causes an increase or decrease in the cost of, or the time required for, performance of any part of the work under this contract, whether or not changed by the order, the Contracting Officer shall make an equitable adjustment in the contract price, the delivery schedule, or both, and shall modify the contract.

(c) The Contractor must assert its right to an adjustment under this clause within 30 days from the date of receipt of the written order. However, if the Contracting Officer decides that the facts justify it, the Contracting Officer may receive and act upon a proposal submitted before final payment of the contract.

(d) If the Contractor's proposal includes the cost of property made obsolete or excess by the change, the Contracting Officer shall have the right to prescribe the manner of the disposition of the property.

(e) Failure to agree to any adjustment shall be a dispute under the Disputes clause. However, nothing in this clause shall excuse the Contractor from proceeding with the contract as changed.

(End of clause)

BI.111 COMMERCIAL WARRANTY (NOV 2004)

The Contractor agrees that the supplies or services furnished under this contract shall be covered by the most favorable commercial warranties the Contractor gives to any customer for such supplies or services and that the rights and remedies provided herein are in addition to and to not limit any rights afforded to the NAFI by any other clause of this contract.

(End of clause)

BI.113 LIMITATION OF LIABILITY-SUPPLIES (NOV 2004)

(a) Except as provided in paragraphs (b) and (c) below, and except for remedies expressly provided elsewhere in this contract, the Contractor shall not be liable for loss of or damage to property of the NAFI (excluding the supplies delivered under this contract) that-

(1) Occurs after NAFI acceptance of the supplies delivered under this contract; and

(2) Results from any defects or deficiencies in the supplies.

(b) The limitation of liability under paragraph (a) of this clause shall not apply when a defect or deficiency in, or the NAFI's acceptance of, the supplies results from willful misconduct or lack of good faith on the part of any of the Contractor's managerial personnel. The term "Contractor's managerial personnel," as used in this clause, means the Contractor's directors, officers, and any of the Contractor's managers, superintendents, or equivalent representatives who have supervision or direction of-

(1) All or substantially all of the Contractor's business;

(2) All or substantially all of the Contractor's operations at any one plant, laboratory, or separate location at which the contract is being performed; or

(3) A separate and complete major industrial operation connected with the performance of this contract.

(c) If the Contractor carries insurance, or has established a reserve for self-insurance, covering liability for loss or damage suffered by the NAFI through purchase or use of the supplies required to be delivered under this contract, the Contractor shall be liable to the NAFI, to the extent of such insurance or reserve, for loss of or damage to property of the NAFI occurring after NAFI acceptance of, and resulting from any defects or deficiencies in, the supplies delivered under this contract.

(End of clause)

BI.124 ASSIGNMENT OF CLAIMS (NOV 2004)

The contractor cannot assign any right or delegate any obligations under this contract without the prior written permission of the Contracting Officer.

(End of clause)

BI.125 NONWAIVER OF DEFAULTS (NOV 2004)

Any failure by the NAFI at any time, or from time to time, to enforce or require strict performance of any terms or conditions of this contract will not constitute waiver thereof and will not affect or impair such terms or conditions in any way or the NAFI's right at any time to avail itself or such remedies as it may have for any breach or breaches of such terms and conditions.

(End of clause)

SOL SCHEDULE.pdf
THE SCHEDULE

File details come from the government source that posted it.