RFC-001 Response.docx

DOCX document 20 KB Posted

Attached to
EATON 3930 UPS SYSTEM BATTERY REPLACEMENT MUOS CHESAPEAKE
Solicitation number
N7027224Q0030
Issued by

About this file

This document is a Request for Clarification (RFC) related to a federal contract opportunity for the replacement of UPS batteries at the Northwest Building 352 in Chesapeake, Virginia.

The key details are:

  • The solicitation number is N7027224Q0030 and the contract is for the EATON 3930 UPS System Battery Replacement at the MUOS Chesapeake facility.
  • The RFC asks 5 questions about the site, including the availability of a loading dock, storage space, elevator access, and any obstacles for delivering and moving the batteries.
  • The answers indicate there is a loading dock, storage space on-site, the units are on the first floor, and there are no obstacles for battery delivery and installation.
  • The federal agency involved is the Department of the Navy Naval Supply Systems Command.

View the file

Other files

File Type Posted
RFC-002 Response.docx DOCX document
ANNEX B EVAL FACTORS.docx DOCX document
ANNEX A PWS.docx DOCX document
24Q0030 RFQ.docx DOCX document
24Q0030 BNLS REDACTED.pdf PDF
ANNEX C PRICE BREAKDOWN.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N7027224Q0030

UPS BATTERIES REPLACEMENT AT NORTHWEST BLDG 352 CHESAPEAKE, VA

REQUEST FOR SPECIFICATION CLARIFICATION

RFC -001

NAME OF CONTRACTOR: _______________________________________________

SPECIFICATION ITEM NO.: _ SAM.GOV Notice ID: N7027224Q0030.

PARAGRAPH / SECTION NO: _VARIOUS_

TITLE: UPS BATTERIES

QUESTION:

1. Is there a loading dock on site?

2. Is there room to store batteries on site before install?

3. Are the units on the first floor? If not, is there an elevator available for use?

4. Are there any obstacles between the loading dock/entry point & the units (steps, ramps, narrow doors, etc.)?

5. Is floor protection needed to move the batteries?

ANSWER:

1. Yes

2. Yes

3. First Floor

4. No

5. No