DIACAP CHECKLIST

View the file

Other files

File Type Posted
PASS APPLICATION blank.pdf PDF
Standard Form 85P.pdf PDF
GTMO —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SITE/COMMAND FULL NAME SYSTEM FULL NAME SYSTEM ACRONYM SYSTEM VERSION# UIC

C/U Platform Request Type CCSD DITPR-DON DADMS ID FAM Status Legacy CARS Case#

NATO Wireless NNPI MAC Level Mission Criticality PPS PIA Date E-Authentication Risk Assess. Annual Security Review Date Contingency Plan Test Date Impact Date

Program Manager IAM User Rep

ValidatorUFFC CIO1 RepJean Simmons
DOCUMENTSVERSIONYES/NOCOMMENTS
SIPNo
Version3.5Yes/No
If Line Items Not Applicable Is N/A AnnotatedYes/NoNo
Is Compliance Annotated in Line 42a-42i (Line 42 should be blank; box is just a header)Yes/NoYes
Impact Statement AnnotatedYes/No
DIACAP Team Roles CompletedYes/No
C&A PlanNo
Plan is Dated & Version Listed On Cover Page (Date and Version Match Change Page/Version History)Yes/No
Accreditation Type Annotated (Annotated either on the cover and /or within the document; Type Accreditation, Site Accreditation or System Accreditation)Yes/NoNo
Mission Description (Primary Mission Statement of the System/Site)Yes/NoNo
CONOPS Summary (If Type Accreditation ensure Fielding Sites or Plan is Annotated)Yes/NoNo
User Description and Clearances (Ensure # of users and Foreign National Info is Annotated)Yes/NoYes
NATO (If Applicable)Yes/NoYes
Operating and Computing EnvironmentYes/NoYes
Physical Security Measures/FacilityYes/No
Threat Analysis (Ensure TEMPEST and COMSEC is annotate if applicable)Yes/No
Security Roles (Ensure IAM is annotated/defined and if applicable, note the Guest Role)Yes/No
System Architecture Diagram (Ensure NTD 08-08 Compliance)Yes/No
Accreditation Boundary DiagramYes/No
Building and Location AnnotatedYes/No
Server/Components Name Annotated (Include Make, Model & Firmware Version Number)Yes/No
IP Addresses AnnotatedYes/No
Cross Domain Solutions AnnotatedYes/No
Circuit Identifiers AnnotatedYes/No
Routers DepictedYes/No
Switches DepictedYes/No
IDS/Firewall DepictedYes/No
Any External Interfaces Other Than CCSD DepictedYes/No
Data Flow Diagram (In-Bound, Outbound or Both)Yes/No
Hardware ListYes/No
Device Name, Manufacture, Model#, FirmwareYes/No
IA EnabledYes/No
CC Eval and PurposeYes/No
If Not Applicable, AnnotatedYes/No
Software ListYes/No
ApplicationYes/No
VersionYes/No
IA EnabledYes/No
CC EvalYes/No
FAM StatusYes/No
DADMS#Yes/No
If Not Applicable, AnnotatedYes/No
Ports, Protocols and Services (PPS) Depicting Internal Ports from External Ports Acceptable; Include HBSS Port(s) if Applicable)Yes/No
PortYes/No
ProtocolYes/No
Description/ServiceYes/No
ClassificationYes/No
Boundary CrossedYes/No
Direction-Inbound/Outbound/BothYes/No
DoDI 8551.1 and NTD 08'10 CompliantYes/No
Configuration Management Plan Annotate IAVM Process/Plan; Who is Responsible for Patch Management Process; Patch Distribution and Patch Implementation)Yes/No
C&A Tasks and MilestonesYes/No
Contingency Plan (Annotate Business Continuity Plan, Disaster Recovery Plan and Incident Response Plan)Yes/No
Implementation PlanNo
Ensure Correct IACs were used per the MAC and CLYes/No
Implementation Status (Ensure Yes and No is Annotated in Boxes; Appropriately and All Boxes are Annotated; Planned Box is Only Annotated in Activity OneYes/No
Responsible EntityYes/NoYes
ResourcesYes/NoNo
Estimated Completion Date (Date Needed in Est; should be length of Accreditation after Activity One)Yes/No
Comments (If Inherited, Enter the Specific; If N/A, Enter the Justification)Yes/No
Ensure Traceability with other IAC DocumentsYes
Test PlanNo
All Applicable Tests Performed & Annotated (If Not Completed, Automatic CAT I Finding from Navy ODAA)Yes/No
60 Days or Less from when Uploaded to IATSYes/NoYes
Retina Scans Test Engine No Older than Two Versions Back Remediation Report and Executive Summary No Access Should Show 0 in Executive Report All Audits Must Be Checked IP Addresses Match C&A Plan, Test Plan and Reports All Ports are Accounted for on PPS Table or ExplainedYes/NoNo
Gold Disk Scan Must Utilize Platinum Policy Ensure Correct Server Type Scanned All Unknowns Reviewed and Annotated AccordinglyYes/No
STIGs/SRRs Checklist Raw Test Reports Must Utilize for any Test Pertaining to System/Application or Site that is not AutomatedYes/No
Traceability with Components in C&A PlanYes/No
Validation ReportNo
Source Annotated in Inherited From BoxYes/No
Not Applicable Justification Provided in CommentsYes/NoYes
Actual Results Box Status Annotated Correctly Example:Yes/NoNo
Applied Mitigation Annotated for each weakness (Mitigation should justify the Residual Risk entered in the CAT column and will be used on the POA&M )Yes/No
CAT (Residual Risk Annotated as CAT I, II or III. If no mitigation applied, Raw Risk (Original DISA Severity Category) is used.Yes/No
POA&M (Validator provides a recommendation on the finding if applicable and suggested mitigation actions for PM if no immediate mitigation applied or avail.Yes/No
Risk Analysis Annotated by Validator Correctly Example:Yes/No
If No Finding, No Action NeededYes/No
Ensure Traceability with other IAC DocumentsYes/No
POA&MNo
Ensure Header is Completed Correctly & FullyYes/No
Non-Compliant, Inherited Non-Compliant, False Positive and N/A IACs Should be AnnotatedYes/NoNo
Date Last Updated (Must be Changed to Coincide with Last Date Document Content was Changed/Edited)Yes/NoYes
Weakness (Detailed Weakness Statement Pertaining to Specific Finding Provided)Yes/No
CAT (Ensure Residual Risk or DIACAP Severity is Annotated)Yes/No
IA Control (IA Control Associated/Assigned IRT Tools/STIGS/Checklists Used)Yes/No
POC (Office or Organization Responsible for Resolving Weakness)Yes/No
Resources Required (Annotate Funding, Manpower or Material; What’s Required to Resolve Weakness and Justify Security Costs)Yes/No
Scheduled Completion Date (Date When Weakness will be Resolved; Should NOT be Changed nor Altered once entered; If CAT II, for an ATO MUST have Completion Date within 180 Days of Accreditation Decision w/Adequate Mitigation Plan or Milestones.)Yes/No
Milestones w/Completion Dates (Specific Steps & Dates Required to Correct Weakness Entered Here; Entries Should Not Change Nor Be Deleted) Example:Yes/No
Milestone Changes (Milestone Completion Dates Annotated Here)Yes/No
Source Identifying Weakness (Identify Tool Utilized to Test the IAC and Specific Test/Audit ID) Example:Yes/No
Status (Ongoing, Completed or Risk Accepted and Date) Example:Yes/No
Comments Ensure Residual Risk or DIACAP Severity is Annotated Ensure Mitigation Statements are Sufficient and Adequate Request for ODAA to Accept Risk may be Annotated Here Ensure that “Zero-Day” Mitigation is used if possible to Lower Risk Ensure Adequate Explanation Provided for False PositivesYes/No
N/A IA Controls If Applicable, Should be Reported in POA&MYes/No
Inherited Findings If Applicable, Should be Reported on Inherited Findings TabYes/No
False Positives If Applicable, Should be Reported on False Positives TabYes/No
Ensure Traceability with other IAC Documents (Particularly Implementation and Scorecard)Yes/No
SCORECARDNo
Ensure Header is Completed Correctly & Fully Overall Risk Level Should Be Annotated Last Update Date is Entered Accreditation Information (Blank; For ODAA Use) Ensure Last Update Column is filled outYes/NoNo
Ensure Traceability with other IAC DocumentsYes/NoYes
ARTIFACTSNo
Retina Scans Test Engine No Older than Two Versions Back Remediation Report and Executive Summary No Access Should Show 0 in Executive Report All Audits Must Be Checked IP Addresses Match C&A Plan, Test Plan and Reports All Ports are Accounted for on PPS Table or ExplainedYes/NoNo
Gold Disk Scan Must Utilize Platinum Policy Ensure Correct Server Type Scanned All Unknowns Reviewed and Annotated AccordinglyYes/NoYes
STIGs/SRRs Checklist Raw Test Reports Must Utilize for any Test Pertaining to System/Application or Site that is not AutomatedYes/No
S&S DocumentYes/No
C&A Package Signature PageYes/No
Contingency PlanYes/No
Contingency Plan Signature PageYes/No
Privacy Impact Assessment (If Applicable)Yes/No
ARTIFACTS FOR CLASSIFIEDNo
SCQYes/NoNo
PDS Compliancy LetterYes/NoYes
Space Certification LetterYes/No
COMMENTS:

OLD IATS - NEW IATS -