J-1502000-08__Inspection_Requirements.pdf

PDF 90 KB Posted

Attached to
NAVO GENERATOR/UPS/CPU MAINTENANCE, STENNIS SPACE CENTER, MS
Solicitation number
N6945018R5205
Issued by

About this file

J-1502000-08__Inspection_Requirements.pdf

View the file

Other files

File Type Posted
Amend0015.pdf PDF
Amend0014.pdf PDF
Amendment_0013.pdf PDF
Amendment_0012.pdf PDF
Amendment_0011.pdf PDF
Amendment_0010.pdf PDF
Amendment_0009.pdf PDF
Amendment_0008.pdf PDF
Amendment_0007.pdf PDF
J-1502000-04_Equip_Inv-Rev_Amend0006.pdf PDF
Amendment_0006.pdf PDF
Amendment_05.pdf PDF
Amendment_0004.pdf PDF
Amendment0003.pdf PDF
Amendment0002w-Attachmts.pdf PDF
Amendment_0001w-Attachmt.pdf PDF
J-1502000-06.docx DOCX document
N6945018D5205.pdf PDF
J-1502000-04_Equip_Inv.xlsx XLSX spreadsheet
J-1502000-05_Min_Report-CEP.xlsx XLSX spreadsheet
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J-1502000-08 DAILY INSPECTION and WEATHER RELATED REQUIREMENTS

Daily Inspections

Contractor shall perform daily visual and physical inspections Monday thru Friday to ensure systems at buildings 1011, 1032, and 9322 are fully operational. Daily inspections must be documented and turned in with the monthly PM information. Daily Inspections shall include the following:

Building 1011

Plant Monitoring System: Check all systems for proper operation and check all system parameters for any inconsistences. Log any alarms or inconsistences and contact COR immediately if there are any issues.

Generator Systems:

Check Kohler Switchgear Interface panel to ensure system is available for normal emergency operation and check all system parameters for inconsistences. Log any alarms or inconsistences and contact COR immediately if there are any issues.

Visual and Physical inspection of generator components including:

o Battery System o Engine Oil levels o Coolant Levels o Day Tank

Fuel Levels

Transfer Pump Operation

Water Fuel Separators o Block Heater Operation o Visual Evidence of leaking fluids o General Appearance o Log any alarms or inconsistences

Visual and Physical inspection of switchgear components including:

o Breaker Positions o DC power supply

Batteries

Panel o Indicators Lamps and Gauges

UPS Systems:

Check Interface Panels to ensure proper system operation and check all system parameters for inconsistences. Log any alarms or inconsistences and contact COR immediately if there are any issues.

Visual and Physical inspections of the room condition and components including:

o Room Temperature and Humidity o UPS Filters o Breaker Positions o Log UPS system parameters

Battery Systems:

Check Battery Cycle Monitor to ensure proper system operation and check all system parameters for inconsistences. Log any alarms or inconsistences and contact COR immediately if there are any issues.

Visual and Physical inspection of the battery banks including:

o General appearance

Connector condition

Bulging Jars

Corrosion buildup o Visual Evidence of leaking fluids

HVAC Systems:

Check HVAC equipment operation to ensure UPS, Battery, and Generator equipment room environments are within parameters so not to be detrimental to the operation of the equipment. Log any alarms or inconsistences and contact COR immediately if there are any issues.

Visual and Physical inspection of the equipment including:

o Excessive equipment condensation o Chilled water piping leaks o Noise, smell, or vibration evidence of impending equipment failure.

o Pump operation

Building 1032

Check Kohler Switchgear Interface panel to ensure system is available for normal emergency operation and check all system parameters for inconsistences. Log any alarms or inconsistences and contact COR immediately if there are any issues.

Visual and Physical inspection of generator components including:

o Battery System o Engine Oil levels o Coolant Levels o Tank

Fuel Levels

Water Fuel Separators o Block Heater Operation o Visual Evidence of leaking fluids o General Appearance o Log any alarms or inconsistences

UPS Systems:

Check Interface Panels to ensure proper system operation and check all system parameters for inconsistences. Log any alarms or inconsistences and contact COR immediately if there are any issues.

Visual and Physical inspections of the room condition and components including:

o Room Temperature and Humidity o UPS Filters o Breakers Position o Battery Cabinet

Visual Evidence of leaking fluids o Log UPS system parameters

Check Transfer Switch Interface panel to ensure system is available for normal emergency operation and check all system parameters for inconsistences. Log any alarms or inconsistences and contact COR immediately if there are any issues.

Visual and Physical inspection of generator components including:

o Battery System o Engine Oil levels o Coolant Levels o Fuel Tank both Belly and External

Fuel Levels

Transfer Pump Operation

Water Fuel Separators o Bi‐fuel controller and Generator operation panel o Block Heater Operation o Visual Evidence of leaking fluids o General Appearance o Log any alarms or inconsistences

Severe Weather Pre and Post inspection and Named Storm Ride‐Out:

If the Nation Weather Service issues a severe weather warning for the Stennis Space Center area, the contractor shall perform an inspection within 24 hours to insure emergency backup systems are completely operational. This may coincide with a daily inspection.

Contractor shall provide ride‐out personnel 24 hours prior to storm landfall for any named storm that is anticipated for the duration of the event.