Amendment_0004.pdf
PDF 31 KB Posted
- Solicitation number
- N6945018R5205
About this file
Amendment_0004.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend0015.pdf | ||
| Amend0014.pdf | ||
| Amendment_0013.pdf | ||
| Amendment_0012.pdf | ||
| J-1502000-08__Inspection_Requirements.pdf | ||
| Amendment_0011.pdf | ||
| Amendment_0010.pdf | ||
| Amendment_0009.pdf | ||
| Amendment_0008.pdf | ||
| Amendment_0007.pdf | ||
| J-1502000-04_Equip_Inv-Rev_Amend0006.pdf | ||
| Amendment_0006.pdf | ||
| Amendment_05.pdf | ||
| Amendment0003.pdf | ||
| Amendment0002w-Attachmts.pdf | ||
| Amendment_0001w-Attachmt.pdf | ||
| J-1502000-06.docx | DOCX document | |
| N6945018D5205.pdf | ||
| J-1502000-04_Equip_Inv.xlsx | XLSX spreadsheet | |
| J-1502000-05_Min_Report-CEP.xlsx | XLSX spreadsheet |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR5126981
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The pupose of this Amendment is to revise Section C and Answ er Bidder Questions. The proposal due date and all other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Jan-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6945018R5205
X 9B. DATED (SEE ITEM 11)
01-Dec-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 4 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Jan-2018
CODE
NAVFAC SOUTHEAST
PWD GULFPORT FEAD
2401 UPPER NIXON ROAD, BLDG 322
GULFPORT MS 39501-5001
N69450 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6945018R5205
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES REV
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0004
The purpose of this Amendment is to answer the following bidder questions:
Question: Page 9 L.7. and page 27 item 2.8; These sections reference security clearances. Can the process for this be shared along with any costs associated with obtaining the required security clearances?
Answer: Upon award, the Government will assist the Contractor with completion of required base access forms. There are no costs associated with submittal of these forms. Obviously, the Contractor will be responsible for administrative efforts in completing the required forms.
Question: Page 30 item 2.8.3; Will there be any cost associated with the vehicle passes and employee badging requirements?
Answer: None, other than the administrative time it takes to complete them. No vehicle passes are required for Stennis – only employee badging.
Question: Page 4; IDIQ Item 003 Pricing requests a per hour rate however materials may be needed as well. Is the hour rate just to assist you with a budget number? If not are parts just being ignored per say here?
Answer: The fully burdened, per hour rate to be bid will be utilized for post-award negotiation of IDIQ Task Orders. Any associated/required material costs will be added to post-award IDIQ Task Order pricing, as appropriate.
Question: Requesting clarification on FFPS and the pricing provided and how they relate to IDIQ's, especially when looking at page 44 item number 3.1.
A. Please maybe elaborate on the process and provide some examples.
B. It appears that the IDIQ is for repairs, however item number 3.1 makes it seem we are to cover all repairs up to $3000. Please explain.
C. It is stated that we have a limit of liability (LOL) of up to $3000 per occurrence. Where are to "include" our estimated costs we will have to cover? Would we just factor these LOL type of jobs into our FFP prices provided?
Answer: The Central Energy Plant and all associated equipment are covered by the $3,000 Limit of Liability under the Firm Fixed Price requirements of the contract.
Example #1: If a repair requires $250 in parts and another $300 in labor on a valve in a chiller in the CEP yard, the vendor would cover all costs under the Firm Fixed Price requirements of the contract.
Example #2: If in one month, a valve had to be replaced at a total negotiated cost of $5,000, the Government would issue an IDIQ Task Order to cover the $2,000 above the LOL. If a different valve were to fail in the next month and negotiated costs for that repair totaled $5,000, we would pay the $2,000 (after LOL).
Example #3: If during the same month, two valves failed, the Government would pay only costs which exceed the $3,000 LOL.
The point is to avoid issuance of a Task Order for every little repair. In addition, the LOL does NOT apply to CRU or Disintegrator repairs. The Government will pay the full value for everything that is not simple PM related.
Solicitation Section C, 1502000, Paragraph 3.1 is revised to add: The LOL does not apply to Computer Room A/C Unit (CRU) repairs. When applicable, the LOL will not exceed $3,000 per month.
Paragraph 3.2.3 already states that the LOL does not apply to the Disintegrator.
Question: Page 46, Item 3.2.1.1; Will all of these units require seasonal shut down? This does not seem likely so please provide a list of which ones do get shut down seasonally.
Answer: This is a decision based upon the vendor's experience and knowledge of the weather conditions in this part of the country.
Question: Reference is made to an Integrated Maintenance Program. Can you provide a copy of the current IMP that the current vendor follows so that a baseline and general understanding can be realized to ensure what we create would be acceptable?
Answer: This is a document provided by the contractor/vendor based upon their best practices and procedures.
Question: Mention is made in addendum 2 to testing of breakers. Can the scope of work this is referring to be provided or reidentified as I don't recall seeing a scope.
Answer: We defer to the minimum recommended manufacturer's testing procedures
Question: Is there a scope of work for the generators and automatic transfer switches? For instance, I did not see anything detailing what frequency oil changes are to be performed.
Answer: We will require the minimum recommended manufacturer's maintenance procedures, along with the IMP processes developed by the vendor. The intent is to ensure no loss of service.
Question: I did not see a scope of work for the disintegrator.
Answer: See Solicitation Section C, 1502000, Paragraph 3.2.3, Industrial Paper Disintegration System.
Question: Is the base period for 1 year?
Answer: Yes
Question: Can you provide a serial number for the Whitaker Bros Paper Disintegrator?
Answer: Model: WHI310; Serial #: 5215; Type: CS
SECTION C - DESCRIPTIONS AND SPECIFICATIONS is revised:
3.1 Trouble Calls/
Service Calls
The Contractor shall perform trouble call work in a timely manner.
The Contractor will be totally responsible for all equipment under the IMP up to the Limit of Liability (LOL) of $3,000 labor and material cost per piece of equipment per occurrence except where noted. The LOL does not apply to Computer Room A/C Unit (CRU) repairs.
When applicable, the LOL will not exceed $3,000 per month.
If there is a repair or replacement of a piece of equipment required, the LOL of $3,000 will be deducted from the cost to the Government.
The Contractor shall receive trouble calls in accordance with the work reception requirements in Annex 2.
The Contractor shall schedule and perform trouble calls in a way that minimize disruptions to customers and Government operations.
The Contractor shall perform trouble calls to accomplish any work identified within the entire boundary of the installation and will include a wide variety of work.
The Contractor shall maintain sufficient materials and equipment on hand to support trouble call work requirements. Lack of availability of material or equipment will not relieve the Contractor from the requirement to complete trouble call work within the time limits specified.
The Government may combine multiple repair requirements received for the same trade in the same building or structure at the same time into one trouble call as long as the trouble call threshold is not exceeded.
FFP Service and Emergency Trouble calls costs shall not exceed $3,000 per occurrence.
The Contractor shall notify the KO upon identification that the trouble call will exceed the limit listed above in accordance with reporting requirements in Annex 2. IDIQ work may be issued for repairs exceeding the trouble call limit.
Service/trouble calls responded to within one hour of receipt of call.
Service/trouble calls completed within 48 hours of receipt of call.
Work is continued without interruption until emergent condition is mitigated.
Building equipments are restored to normal working condition, including recertification if applicable.
When repair is complete the Building equipment does not present danger to personnel or other equipment.
(End of Summary of Changes)