Amendment_0001w-Attachmt.pdf

PDF 91 KB Posted

Attached to
NAVO GENERATOR/UPS/CPU MAINTENANCE, STENNIS SPACE CENTER, MS
Solicitation number
N6945018R5205
Issued by

About this file

Amendment_0001w-Attachmt.pdf

View the file

Other files

File Type Posted
Amend0015.pdf PDF
Amend0014.pdf PDF
Amendment_0013.pdf PDF
Amendment_0012.pdf PDF
J-1502000-08__Inspection_Requirements.pdf PDF
Amendment_0011.pdf PDF
Amendment_0010.pdf PDF
Amendment_0009.pdf PDF
Amendment_0008.pdf PDF
Amendment_0007.pdf PDF
J-1502000-04_Equip_Inv-Rev_Amend0006.pdf PDF
Amendment_0006.pdf PDF
Amendment_05.pdf PDF
Amendment_0004.pdf PDF
Amendment0003.pdf PDF
Amendment0002w-Attachmts.pdf PDF
J-1502000-06.docx DOCX document
N6945018D5205.pdf PDF
J-1502000-04_Equip_Inv.xlsx XLSX spreadsheet
J-1502000-05_Min_Report-CEP.xlsx XLSX spreadsheet
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR5126981

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to provide a revised Attachment J-1502000-06 and to provide a minor corrections regarding the Contract Number cited in Section C and the page number indicated for Clause 52.212 in the Contractor Information. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Dec-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6945018R5205

X 9B. DATED (SEE ITEM 11)

01-Dec-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 4 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Dec-2017

CODE

NAVFAC SOUTHEAST

PWD GULFPORT FEAD

2401 UPPER NIXON ROAD, BLDG 322

GULFPORT MS 39501-5001

N69450 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6945018R5205

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES REV

SUMMARY OF CHANGES

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

1. CONTRACTOR INFORMATION (Solicitation Pages 8-9) – corrected page number (was Page 167):

L.2. PROPOSAL SUBMITTAL REQUIREMENTS: Proposals submitted in response to this Solicitation shall be provided NLT COB 25 January 2018 and should include the following:

Cover Letter, which includes the Solicitation Number; the name, address, telephone & facsimile numbers, email addresses of the Offeror;

the DUNS Number, CAGE Code and Tax Identification Number (TIN) of the Offeror; and contact information of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this solicitation.

SF1449 with Blocks 17a, 30a/b/c completed, as well as signed/ Acknowledged Amendments, if any are issued.

Section B Contract Line Item Lump Sum Pricing for all FFP CLINs AND a fully burdened hourly labor rate for CLIN 0003.

Documents addressing ALL Evaluation Criteria included in Solicitation Clause 52.212-2 (See Page 147).

Offers may be submitted electronically to cara.morano@navy.mil. Hard copy submittals shall include four (4) copies of the complete proposal.

Address offer (Mail or FedEx) to: FEAD Gulfport, Attn: Cara Morano, 2401 Upper Nixon Avenue, Building 322, Naval Construction Battalion Center, Gulfport, MS 39501-5001.

2. DESCRIPTIONS & SPECIFICATIONS (Solicitation Page 20) – corrected Contract Number (was N6945018D5206)

0200000 - Management and Administration Spec Item Title Description 2 Management and

Administration For Contract N6945018D5205

3. Revised Attachment J-1502000-06 is provided.

(End of Summary of Changes)

JOHN C. STENNIS SPACE CENTER

MAINTENANCE TASK SHEET # M-2

Reciprocating Chiller Task#1 Frequency- Annual (52weeks)

Step Description

1 Log chiller condition upon arrival to the job site and prior to start of any work. Inspect for vibrations, unusual noises, etc.

2 Pull oil sample and perform a complete oil analysis. Compile a report of the findings and evaluation of the data from the analysis (Shall meet requirements of EXHIBIT II).

3 Obtain refrigerant sample and perform a refrigerant analysis to check for acid and/or moisture.

4 Change oil and filter elements (oil and refrigerant), as determined by oil and refrigerant analysis.

5 Check all refrigerant, oil, chilled water, and condensing water operating temperatures, pressures and flows associated with the chiller during normal operation and verify that all are within manufacturer's recommended parameters. Verify chilled water and condenser water flows are within manufacturer's design. Test the operation of all flow switches, high/low oil switch, high/low compressor discharge and suction refrigerant pressure switches, and operation of all pump auxiliary contacts. Calibrate as needed.

6 Check all motor electrical connections, safety voltage and current devices, starters, etc. Perform thermography on motor controller and associated wiring and connections (from line feed terminals to the equipment load).

7 Meg test compressor motors.

8 Check motor shafts and alignment, as applicable.

9 Lubricate rotating and moving components, as applicable.

10 Switch the lead-lag compressor, as applicable.

11 Check for refrigerant and oil leaks.

12 Clean air cooled condenser coils (where applicable).

13 Check for proper refrigerant charge, superheat and subcooling.

14 Functionally check controls: chilled water temperature, hot gas bypass, low ambient controls, condenser water cooling tower bypass, pump interlocks, etc., as applicable.

15 Check the equipment room, the chiller and associated equipment for rust and corrosion. Clean, paint and repair damaged or corroded surfaces and insulation.

16 Remove trash, dust and debris from the equipment cabinets, surfaces and equipment room.

17 Check chilled water piping system and peripheral equipment for proper operation, for damage, leaks, rust and corrosion. Clean, paint and repair damaged or corroded equipment and components as applicable.

Task#2 Frequency- 5 Years (260 weeks)

The following requirements shall be performed on each chiller every five

(5) years (maximum allowed time span between analysis for a chiller).

This work shall be scheduled such that the procedures will be performed on approximately the same number of chillers each fiscal year, and allnchillers shall be covered over a five year period.

1 Clean and check chiller tubing banks: chilled water tubing and condenser water tubing (where applicable).

2 Perform eddie current tubing analysis.

3 Provide a complete inspection/analysis report relative to all work/task performed upon completion. Provide also a report of all discrepancies found as a result of all inspections and analysis along with recommended additional testing, corrections or modifications.

MAINTENANCE TASK SHEET # M Sl Air Handling Unit Task#1 Frequency-Quarterly (13weeks)

Step Description 1 Check equipment for proper operation

2 Replace throw-away filters or clean permanent filters

Frequency-Annual(52 weeks)

Step Description

Clean and flush cooling coils, condensate drain pans and drain lines.

2 Clean heating coils, dampers, screens, plenums, etc., as applicable.

3 Check electrical connections.

4 Check fans and motors for excessive noise, vibration, heat, etc.

5 Lubricate electrical motors, as applicable.

6 Functionally check controls.

7 Check belts, replace as required.

8 Check guards and covers.

9 Check piping and valves for leaks.

10 Check for rust and corrosion. Clean, paint and repair damaged or corroded surfaces and insulation.

11 Remove trash, dust and debris from equipment and equipment room

MAINTENANCE TASK SHEET # M-13

Gas Unit Heater Task#1 Frequency- Annual (52 weeks)

Step Description 1 Functionally check controls and operation of the unit.

2 Visually inspect the unit for corrosion or damage which could lead to improper combustion or fire hazards.

3 Clean, paint and repair damaged or corroded surfaces and insulation.

Hercules MSDS - CORRSHIELD NT402

SAFETY DATA SHEET

BetzDearborn, Division of Hercules Incorporated 4636 Somerton Road Trevose, PA 19053

Business telephone: (215) 355-3300

EMERGENCY TELEPHONE (HEALTH/ACCIDENT) (800) 877-1940 (USA)

ISSUE DATE: 16-NOV-2001

HMIS RATINGS (See Section 16 for additional information) HEALTH:2

FLAMMABILITY:1

REACTIVITY:0

1 PRODUCT IDENTIFICATION PRODUCT NAME:

CORRSHIELD NT402

PRODUCT APPLICATION AREA: CORROSION INHIBITOR.

2 COMPOSITION / INFORMATION ON INGREDIENTS

Information for specific product ingredients as required by the U.S. OSHA HAZARD COMMUNICATION STANDARD is listed. Refer to additional sections of this MSDS for our assessment of the potential hazards of this formulation.

HAZARDOUS INGREDIENTS:

CAS# CHEMICAL NAME

7632-00-0 SODIUM NITRITE

Oxidizer; toxic (by ingestion); potential blood toxin

12179-04-3 BORIC ACID, DISODIUM SALT, PENTAHYDRATE

Irritant (abraded skin); slight irritant (respiratory) No component is considered to be a carcinogen by the National Toxicology Program, the International Agency for Research on Cancer, or the Occupational Safety and Health Administration at OSHA thresholds for carcinogens.

3 HAZARDS IDENTIFICATION

EMERGENCY OVERVIEW WARNING

May cause moderate irritation to the skin. Severe irritant to the eyes.

Mists/aerosols cause irritation to the upper respiratory tract.

DOT hazard: ORS (when container > RQ) Emergency Response Guide #31 Odor: Slight; Appearance: Yellow, Liquid

Fire fighters should wear positive pressure self-contained breathing apparatus(full face-piece type). Proper fire-extinguishing media: Flood with water. Use of CO2 or foam may not be effective.

POTENTIAL HEALTH EFFECTS

ACUTE SKIN EFFECTS:

Primary route of exposure; May cause moderate irritation to the skin.

ACUTE EYE EFFECTS: Severe irritant to the eyes.

ACUTE RESPIRATORY EFFECTS

Mists/aerosols cause irritation to the upper respiratory tract.

INGESTION EFFECTS: Toxic; May cause gastrointestinal irritation with possible nausea, vomiting, headache, dizziness, unconsciousness and injury to the kidneys and liver.

TARGET ORGANS:

Prolonged or repeated exposures may cause CNS depression and/or toxicity to the liver, kidney, and blood system.

MEDICAL CONDITIONS AGGRAVATED: Not known.

SYMPTOMS OF EXPOSURE:

May cause redness or itching of skin.

4 FIRST AID MEASURES SKIN CONTACT:

Remove contaminated clothing. Wash exposed area with a large quantity of soap solution or water for 15 minutes.

EYE

CONTACT:

Immediately flush eyes with water for 15 minutes. Immediately contact a physician for additional treatment.

INHALATION:

Remove victim from contaminated area to fresh air. Apply appropriate first aid treatment as necessary.

INGESTION:

Do not feed anything by mouth to an unconscious or convulsive victim. Dilute contents of stomach. Induce vomiting by one of the standard methods. Immediately contact a physician.

NOTES TO PHYSICIANS: No special instructions

5 FIRE FIGHTING MEASURES

FIRE FIGHTING INSTRUCTIONS:

Fire fighters should wear positive pressure self-contained breathing apparatus (full face-piece type). EXTINGUISHING MEDIA:

Flood with water. Use of CO2 or foam may not be effective.

HAZARDOUS DECOMPOSITION PRODUCTS

Thermal decomposition (destructive fires) yields elemental oxides. FLASH POINT:

> 200F > 93C P-M(CC) MISCELLANEOUS:

ORS (when container > RQ) NA3082;Emergency Response Guide #31

6 ACCIDENTAL RELEASE MEASURES PROTECTION AND SPILL

CONTAINMENT:

Ventilate area. Use specified protective equipment. Contain and absorb on absorbent material. Place in waste disposal container. Flush area with water. Wet area may be slippery. Spread sand/grit.

DISPOSAL INSTRUCTIONS:

Water contaminated with this product may be sent to a sanitary sewer treatment facility,in accordance with any local agreement,a permitted waste treatment facility or discharged under a permit. Product as is - Incinerate or land dispose in an approved landfill.

7 HANDLING & STORAGE HANDLING:

Contains an oxidizer. Avoid all contact with reducing agents, oils, greases, organics and acids. Do not allow to dry.

STORAGE: Keep containers closed when not in use. Protect from freezing.

8 EXPOSURE CONTROLS / PERSONAL PROTECTION

EXPOSURE LIMITS

CHEMICAL NAME

SODIUM NITRITE

PEL (OSHA): NOT DETERMINED TLV (ACGIH): NOT DETERMINED

BORIC ACID,DISODIUM SALT,PENTAHYDRATE PEL (OSHA): NOT

DETERMINED

TLV (ACGIH): 1 MG/M3

ENGINEERING CONTROLS:

Adequate ventilation to maintain air contaminant below exposure limits.

PERSONAL PROTECTIVE EQUIPMENT:

Use protective equipment in accordance with 29 CFR1910 Subpart I

RESPIRATORY PROTECTION:

A RESPIRATORY PROTECTION PROGRAM THAT MEETS OSHA'S 29

CFR

1910.134 AND ANSI Z88.2 REQUIREMENTS MUST BE FOLLOWED

WHENEVER WORKPLACE CONDITIONS WARRANT A

RESPIRATOR'S USE.

USE AIR PURIFYING RESPIRATORS WITHIN USE LIMITATIONS

ASSOCIATED WITH THE EQUIPMENT OR ELSE USE SUPPLIED AIR-

RESPIRATORS.

If air-purifying respirator use is appropriate, use a respirator with dust/mist filters.

SKIN PROTECTION:

rubber gloves-- Wash off after each use. Replace as necessary.

EYE PROTECTION:

splash proof chemical goggles

9 PHYSICAL & CHEMICAL PROPERTIES

Specific Grav.(70F,21C) 1.250 Vapor Pressure (mmHG) ~ 18.0 Freeze Point (F) < < 0 Vapor Density (air=1) < 1.00 Freeze Point (C) < -18

Viscosity(cps 70F,21C) 12 % Solubility (water) 100.0 Odor Slight Appearance Yellow Physical State Liquid

Flash Point P-M(CC) > 200F > 93C pH As Is (approx.) 11.6

Evaporation Rate (Ether=1) < 1.00 NA = not applicable ND = not determined

10 STABILITY & REACTIVITY STABILITY:

Stable under normal storage conditions. HAZARDOUS POLYMERIZATION:

Will not occur.

INCOMPATIBILITIES:

May react with strong oxidizers.

DECOMPOSITION PRODUCTS:

Thermal decomposition (destructive fires) yJi-1e5l0d2s00e0-l0e6mental oxides.

BETZDEARBORN INTERNAL PUMPOUTP/CagLe 9EoAf 1N5

OUT CATEGORIES: "B"

11 TOXICOLOGICAL INFORMATION

Oral LD50 RAT: ~275 mg/kg

NOTE - Estimated value Dermal LD50 RABBIT: >5,000 mg/kg

NOTE - Estimated value

12 ECOLOGICAL INFORMATION

AQUATIC TOXICOLOGY

Daphnia magna 48 Hour Static Acute Bioassay LC50= 340; No Effect Level= 180 mg/L

Fathead Minnow 96 Hour Acute Toxicity (Estimated) LC50= 1140; No Effect Level= 740 mg/L

Rainbow Trout 96 Hour Static Acute Bioassay LC50= 180; No Effect Level= 100 mg/L

BIODEGRADATION BOD-28 (mg/g): 1 BOD-5 (mg/g): 0

COD (mg/g): 79 TOC (mg/g): 4

13 DISPOSAL CONSIDERATIONS

If this undiluted product is discarded as a waste, the US RCRA hazardous waste identification number is : Not applicable.

Please be advised; however, that state and local requirements for waste disposal may be more restrictive or otherwise different from federal regulations. Consult state and local regulations regarding the proper disposal of this material.

14 TRANSPORT INFORMATION

DOT HAZARD: ORS (when container > RQ) UN / NA NUMBER: NA3082

DOT EMERGENCY RESPONSE GUIDE #: 31

15 REGULATORY INFORMATION TSCA:

All components of this product are listed in the TSCA inventory. CERCLA

AND/OR SARA REPORTABLE QUANTITY (RQ):

32 gallons due to SODIUM NITRITE;

SARA SECTION 312 HAZARD CLASS

Immediate(acute);Delayed(Chronic) SARA SECTION 302 CHEMICALS:

No regulated constituent present at OSHA thresholds

SARA SECTION

CHEMICALS:

CAS#

CHEMICAL

NAME

RANGE

7632-00-0 SODIUM

NITRITE

21.0-30.0%

MAINTENANCE TASK SHEET # M-8

Pump Task#1 Frequency- Quarterly (13 weeks)

Step Description

1 Check pumps and components for excessive noise, vibration, overheating, etc.

2 Perform vibration analysis on pump and motor (shall meet requirements of EXHIBIT II).

3 Based on vibration analysis results, lubricate, realign, etc, as required.

4 Provide a complete analysis evaluation of the vibration testing, and enter into the signature database.

MAINTENANCE TASK SHEET# Me12

RTU,Packaged and Unitary Units (OX type units) Task #1 Frequency- Quarterly (13 weeks)

1 Check equipment for proper operation.

2 Check for signs of refrigerant leakage or loss, as applicable.

3 Replace throw-away filters or clean permanent filters.

Frequency- Annual.(52 weeks) Step Description 1 Clean and flush coils, condensate pans and drain lines.

2 Clean condenser coils, heating coils/elements, dampers, screens, plenums, etc., as applicable.

3 Check electrical connections.

4 Check fans, compressors and motors for excessive noise, vibration, heat, etc.

5 Lubricate electrical motors, as required.

6 Functionally check controls.

7 Check belts, as applicable.

8 Check guards and covers.

9 Check piping and valves for leaks.

10 Check refrigerant charge.

11 Check for rust and corrosion. Clean, paint and repair damaged or corroded surfaces and insulation.

12 Remove trash, dust and debris from equipment and equipment room, as applicable.

Task#3 Inspect belts (where applicable) and replace, as required.

Task#4 Replace throw-away filters and clear permanent filters.

MAINTENANCE TASK SHEET# M 14

Fan, Blower or Vent Task#1 Frequency- Annual (52weeks)

1 Functionally check operation of the unit.

2 Visually inspect the unit for corrosion or damage. Clean, paint and repair damaged or corroded surfaces and insulation.

Computer Room Units (Quarterly PM Inspections)

1. Check unit for proper operation.

2. Replace throw-away filters or clean permanent filters.

Computer Room Units (Semi-Annual PM Inspections)

1. Check unit for proper operation.

2. Replace throw-away filters or clean permanent filters.

3. Check fans, compressors and motors for excessive noise, vibration, heat, etc.

4. Check cooling coils, heating coil/elements and condensate pans and drain lines.

5. Check condenser unit (where applicable).

6. Clean and check humidifier (where applicable).

7. Check belts.

8. Check piping and valves for leaks.

Computer Room Units (Annual PM Inspections)

1. Check unit for proper operation.

2. Replace throw-away filters or clean permanent filters.

3. Check fans, compressors and motors for excessive noise, vibration, heat, etc.

4. Check cooling coils, heating coil/elements and condensate pans and drain lines.

5. Check condenser unit (where applicable).

6. Clean and check humidifier (where applicable).

7. Check belts.

8. Check piping and valves for leaks. Clean and flush coils, condensate pans and drain lines.

9. Clean condenser coils, heating coils/elements, dampers, screens, plenums, etc., as applicable.

10. Clean and functionally check humidifier (where applicable).

11. Check electrical connections.

12. Lubricate electrical motors, as required.

13. Functionally check controls.

14. Check guards and covers.

15. Check refrigerant charge (where applicable).

16. Check for rust and corrosion. Clean, paint and repair damaged or corroded surfaces and insulation.

17. Remove trash, dust and debris from equipment and equipment room, as applicable.

Amendment 0001
J-1502000-06 Rev

File details come from the government source that posted it.