Amendment_0012.pdf
PDF 42 KB Posted
- Solicitation number
- N6945018R5205
About this file
Amendment_0012.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend0015.pdf | ||
| Amend0014.pdf | ||
| Amendment_0013.pdf | ||
| J-1502000-08__Inspection_Requirements.pdf | ||
| Amendment_0011.pdf | ||
| Amendment_0010.pdf | ||
| Amendment_0009.pdf | ||
| Amendment_0008.pdf | ||
| Amendment_0007.pdf | ||
| J-1502000-04_Equip_Inv-Rev_Amend0006.pdf | ||
| Amendment_0006.pdf | ||
| Amendment_05.pdf | ||
| Amendment_0004.pdf | ||
| Amendment0003.pdf | ||
| Amendment0002w-Attachmts.pdf | ||
| Amendment_0001w-Attachmt.pdf | ||
| J-1502000-06.docx | DOCX document | |
| N6945018D5205.pdf | ||
| J-1502000-04_Equip_Inv.xlsx | XLSX spreadsheet | |
| J-1502000-05_Min_Report-CEP.xlsx | XLSX spreadsheet |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR5126981
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to add an Attachment in Section J and associated verbiage in Section C of the Solicitation, as w ell as extend the proposal due date to Noon on 21 March 2018. Revised pricing or proposals may be submitted electronically to cara.morano@navy.mil or hard copy (4 copies required) as indicated on Page 9, Paragraph L.2. of the original Solicitation. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Mar-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6945018R5205
X 9B. DATED (SEE ITEM 11)
01-Dec-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Mar-2018
CODE
NAVFAC SOUTHEAST
PWD GULFPORT FEAD
2401 UPPER NIXON ROAD, BLDG 322
GULFPORT MS 39501-5001
N69450 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6945018R5205
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES REV
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0012
1. This Amendment accomplishes the following:
A. Modifies Solicitation Section C – 1502000, Paragraph 3.2 From:
3.2 Preventive
Maintenance:
The Contractor shall develop and implement a PM program for systems and equipment to ensure proper operation, to minimize breakdowns, and to maximize useful life. For Bldg 1011,at least two generators and all associated switchgear equipment must remain operable at all time.
The Contractor shall submit a PM program to the KO to validate completeness. The PM program shall be developed based on an economical approach, manufacturers’ recommended procedures, OEM standards, and maintenance required to satisfy equipment warranties.
As a minimum, the work described in J- 1502000-03 will be provided to all systems.
The systems and equipment, including associated inventories that shall be included in the PM program are addressed in the PM Spec Items below.
The Contractor shall perform any repairs up to $3,000 per PM occurrence except where noted.
Notification of repair work exceeding the PM limit shall be submitted to the KO by close of business the following day of identification.
IDIQ work may be issued for repairs exceeding the PM limit; however, the Government will only be liable for the amount of cost exceeding the Contractor’s liability limit. ($3,000)
Excessive or repeated system or equipment breakdowns or deficiencies may indicate the need to adjust or modify the Contractor’s PM program. These changes will be made at no additional cost to the Government.
The Contractor shall submit a monthly PM schedule and unaccomplished PM report.
To:
3.2 Preventive
Maintenance:
The Contractor shall develop and implement a PM program for systems and equipment to ensure proper operation, to minimize breakdowns, and to maximize useful life. For Bldg 1011,at least two generators and all associated switchgear equipment must remain operable at all time.
The Contractor shall submit a PM program to the KO to validate completeness. The PM program shall be developed based on an economical approach, manufacturers’ recommended procedures, OEM standards, and maintenance required to satisfy equipment warranties.
Minimum inspection and weather related requirements are as indicated in Attachment J-1502000-08.
The systems and equipment, including associated inventories that shall be included in the PM program are addressed in the PM Spec Items below.
The Contractor shall perform any repairs up to $3,000 per PM occurrence except where noted.
Notification of repair work exceeding the PM limit shall be submitted to the KO by close of business the following day of identification.
IDIQ work may be issued for repairs exceeding the PM limit; however, the Government will only be liable for the amount of cost exceeding the Contractor’s liability limit. ($3,000)
Excessive or repeated system or equipment breakdowns or deficiencies may indicate the need to adjust or modify the Contractor’s PM program. These changes will be made at no additional cost to the Government.
The Contractor shall submit a monthly PM schedule and unaccomplished PM report.
B. Adds Attachment J-1502000-08 to the Section J Table of Contents, as indicated below:
SECTION J
DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
TABLE OF CONTENTS
ATTACHMENT
NUMBER
ATTACHMENT TITLE
J-0200000-01 ACRONYMS and DEFINITIONS
J-0200000-02 WAGE DETERMINATION
J-0200000-03 REFERENCES, INSTRUCTIONS, DIRECTIVES
J-0200000-04 INVOICING PROCEDURES
J-0200000-05 FORMS
J-0200000-06 GOVERNMENT-FURNISHED PROPERTY, MATERIALS, AND SERVICES
J-1502000-01 FACILITIES PROPERTY AND SYSTEMS INVENTORY (DRAWINGS)
J-1502000-02 SITE MAPS
J-1502000-03 DISINTEGRATOR SYSTEM MANUALS
J-1502000-04 EQUIPMENT INVENTORY
J-1502000-05 MINIMUM REPORTING
J-1502000-06 MINIMUM PREVENTIVE MAINTENANCE FOR HVAC & CRU’S
J-1502000-07 MINIMUM PREVENTIVE MAINTENANCE FOR DISINTEGRATOR
J-1502000-08 DAILY INSPECTION AND WEATHER RELATED REQUIREMENTS
C. Adds Attachment J-1502000-08, which is provided separately.
D. Extends the proposal due date until Noon on 21 March 2018.
2. All other terms and conditions remain unchanged.
(End of Summary of Changes)