Questions and Answers.docx

DOCX document 283 KB Posted

Attached to
Security door demo & replacement
Solicitation number
N6893627Q0021
Issued by

About this file

This is a Questions and Answers document addressing inquiries about solicitation N6893627Q0021 for security door demolition and replacement at Naval Base Ventura County, Point Mugu, California. The project, with a magnitude under $25,000, requires replacement of a single secure door (36" x 84" x 1" thick steel) in room PM351 2nd Floor RM2502 with a solid steel frame (16-18 gauge, 1" wide). Key specifications include a hollow metal door factory-painted to match the existing color with an STC 42 minimum rating, reuse of the existing steel frame, and installation of a Hirsch 8336ABTR000 uTrust TS Scramble Prox reader and Lockmasters LockOne LKM10K lock series. The government confirmed no RF shielding is required, existing power source is available for the CAC reader, and the existing frame will remain in place despite language about frame removal in demolition scope. Prospective contractors must hold or utilize subcontractors holding Hirsch and LockSet dealer certifications to satisfy technical acceptability requirements, with prime or subcontractor certification acceptable as documentation.

Quotes must be submitted by email to Andrea Farrell (andrea.m.farrell7.civ@us.navy.mil) and Markelle Griffin (markelle.r.griffin.civ@us.navy.mil) by 4 PM PST on November 23, 2026, with acknowledgement of amendment N6893627Q0021-00001. The installation must be completed in one day with the room remaining secured overnight; the government may consider extended timelines with approved temporary security solutions at PHYSEC discretion. Personnel requirements include one qualified person serving as both superintendent and site safety officer with base badging per NBVC_PASS-ID requirements. Payment processing occurs via WAWF invoicing on a Net 30 basis with partial delivery and partial payment acceptable. No site visit will be conducted; materials typically require 4-6 weeks lead time with potential completion date extension into January 2027 if delays occur. The pre-construction kickoff meeting is desired in-person. The project is a 100% Small Business Set-Aside with performance and payment bonds not required due to contract magnitude.

View the file

Other files

File Type Posted
Solicitation Amendment - N6893627Q00210001.pdf PDF
Solicitation - N6893627Q0021.pdf PDF
Wage Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A: N6893627Q0021 Scope PM351 2nd FL Security Door Replacement

1) Is it possible to get photos of the existing door entry?

Existing Door Frame: Could the Government provide photographs or detailed drawings showing the existing door frame and surrounding conditions to support accurate pricing and installation planning? Door entry is for PM351 2nd FL RM2502 single Secure Door to be replaced. Refer to DoDM 5200.01-V3, February 24, 2012, Appendix to Enclosure 3 for guidance on secure door installation/requirements:

Steel door, 36” x 84”, 1 ¾” thick. Solid steel frame, heavy gauge (16 ga or 18 ga), 1 ½” wide, recessed back from face of concrete wall 2”.

Drawings: The SOW mentions a drawing showing the conceptual design. It was not included in the posted files. Please provide the drawing and photos of the existing door, frame and hardware.

Since there will be no site visit, can you provide existing-condition drawings, full measurements, or photographs available to assist with confirming compatibility with the specified replacement hardware?

Frame: The materials list says to reuse the existing steel frame, while the demolition item says to remove the door, frame and hardware. Please confirm the frame stays. Yes, the frame can stay in place on the single door.

It is said the frame stays in place is this correct? Yes

2) Door configuration: Please confirm this is a pair of doors in a 6'0" x 8'0" opening, which leaf is active, the swing direction, and whether flush bolts, an astragal and a coordinator are required. Single door

3) Finish: Should the door be hollow metal, factory primed and field painted? If so, what color? Hollow metal, factory painted same color as existing door

4) Access control and alarm: Will the existing reader cabling and access control system be reused? Who does the programming and the final alarm panel connection, the contractor or government security staff? PHYSEC

5) The Scope of Work calls to replace the existing CAC Reader with a new Hirsch 8336ABTR000 uTrust TS Scramble Prox read. Is there an existing power source to connect the new CAC reader? Yes

6) What is the STC rating? STC 42 minimum

7) Would you like an RF shielding applied to this opening? No

8) Are interface specifications or wiring diagrams available for the existing access control and intrusion detection systems? Unknown

9) Please also confirm that “LockSet” refers to the LKM10K / X-10 (Lockmasters / Kaba Mas) product line. Refer to the SOW

Does "LockSet" mean the Lockmasters LockOne LKM10K lock series named in the SOW? Refer to the SOW

Admin

1) Could you please confirm whether payment and performance bonds are required for this procurement?

Magnitude of this construction project: Less than $25,000 Performance bonds: Contracts exceeding $150,000, Payment Bonds: Contracts exceeding $35,000 but not exceeding $150,000

2) The solicitation asks for proof of LockSet and Hirsch dealer certification. Would a subcontractor's certification meet that requirement if the subcontractor performs the lock and card reader work and we include their certificates with our quote? Yes

Dealer certification: Will the Hirsch and LockSet dealer certification of a subcontractor that supplies and installs the lock, reader and alarm switches satisfy this requirement, or must the prime contractor hold the certifications? Yes

3) Could you please confirm whether formal certified dealer status and direct manufacturer authorization are mandatory conditions of technical acceptability, or if an offeror may satisfy this requirement by sourcing the specified products through established suppliers and utilizing qualified personnel for installation?

Specifically, would a quotation be technically acceptable if the offeror can demonstrate that:

All specified LockSet and Hirsch products will be genuine, new, and procured through legitimate commercial supply channels;

The proposed products fully comply with the solicitation's technical specifications; and Installation will be performed by qualified personnel with experience installing and integrating the specified security hardware and access control systems?

Hirsch and LockSet dealer certification Prime or sub must provide proof.

4) Lead time: The lock and reader typically take 4-6 weeks. Can the completion date move into January 2027 if materials are delayed? Yes

5) Personnel: For this one-day installation, may one qualified person serve as both superintendent and site safety officer? Yes

6) Can you please confirm the minimum requirement for on-site personnel:

Base access: badging requirements per NBVC_PASS-ID@us.navy.mil, One qualified person may serve as both superintendent and site safety officer Hirsch and LockSet dealer certification Prime or sub must provide proof.

7) Submission and payment: Please confirm quotes go to Ms. Farrell by email, and payment is one WAWF invoice after completion, net 30.

Submissions and quotes by email to:

andrea.m.farrell7.civ@us.navy.mil markelle.r.griffin.civ@us.navy.mil.

Partial Delivery Partial Payment acceptable upon delivery and/or job completion. Example: Invoicing for locks/materials if they are delivered/accepted prior to job completion.

Invoices and payment processing via WAWF Net 30.

scheduling/access

1) Installation Timeline: The SOW requires the door replacement to be completed in one day, with Room remaining secured overnight. Would the Government consider allowing additional installation time if the contractor provides an approved temporary security solution to ensure the room remains secured? This would require PHYSEC discretion and guidance.

2) Please also confirm U.S. citizens and green card holders are eligible for base badges. U.S. Citizens must apply for badging at NBVC_PASS-ID@us.navy.mil. Consult with them about Green Card holders.

3) Site Access: If photographs or detailed drawings are unavailable, would the Government consider arranging a site visit for prospective contractors to assess the existing conditions before submitting their quotations? No

4) Kickoff: May the pre-construction kickoff be held virtually? An in-person Pre-Con Kick Off is desired.