N6893626Q5141 Amendment 0001 2026.08.13.pdf
PDF 589 KB Posted
- Solicitation number
- N6893626Q5141
About this file
This document is Amendment 0001 to solicitation N6893626Q5141, issued by Naval Air Warfare Center Weapons Division (NAWCWD) on August 13, 2026, with an effective date of August 13, 2026. The amendment modifies the Performance Work Statement (PWS) for a High Temperature, Controlled Atmosphere Furnace Suite based on industry questions and government answers provided during the sources sought phase.
The key modifications to the PWS address three critical requirements: (1) the power allowance has been increased from 60 kVA to up to 250 kVA to accommodate the electrical demands of the furnace suite operating at 480V, 3-phase, 60 Hz; (2) the vacuum pressure requirement for the 2200°C furnace chamber has been relaxed from 10^-5 torr to 10^-3 torr to reflect practical operating conditions during heating operations; and (3) clarifications that the suite must consist of two separate furnace chambers and two separate vacuum systems that cannot be replaced by alternative single-chamber configurations with interchangeable hot zones. The furnace suite must include two chambers (1300°C with 14.8" × 11.8" × 11.8" capacity and 2200°C with 12" × 12" × 12" capacity), combined chiller and control systems, NEMA-1 enclosed combination cabinets with PLC and HMI controls, and critical spare parts. The contractor must provide engineering design package, installation support, up to two days of factory training, up to three days of on-site training, assembly drawings with utility information within 4-6 weeks, and a one-year warranty. All suite components except the chiller must fit within a 20 ft × 12 ft footprint with height under 10 ft, and the contractor must include packaging and shipping costs to China Lake, California 93555.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Conformed RFQ N6893626Q5141 2026.08.13.pdf | ||
| Solicitation - N6893626Q5141 2026.08.06.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
Created On:
13 Aug 2026, 22:50 PM Greenwich Mean Time
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section A [Mod Specific] - Mod Specific
Miscellaneous text in this section has been modified to:
Industry Questions and Government Answers
Responses to the following questions have resulted in two minor modifications to the PWS: an update to the pressure limits of the 2200C furnace from 10^-5 to 10^-3, and an update to the power allowance from 60kVA to up to 250kVA.
The Government does not plan to answer any further questions. The Government encourages all offerors to submit their best terms in response to this RFQ by the required deadline.
Industry Question 1: 60 kVA Maximum Power Requirement
The PWS requires the complete furnace suite to operate at 480V, 3-phase, 60 Hz and not exceed 60 kVA. Based on historical experience, a furnace with a minimum 12" 12" 12" usable chamber capable of 2200C typically requires substantially more than 60 kVA.
Could you please confirm whether the 60 kVA maximum is an absolute requirement, particularly for the 2200C furnace?
If it cannot be increased, would the customer consider either:
1) a smaller chamber size,
2) a lower maximum operating temperature, or
3) another configuration that reduces the electrical load?
Government Answer 1: We require the chamber sizes and maximum operating temperatures as noted in the PWS to fit specific parts and conditions.
However, we have reassessed our available power supply panels and can accommodate power requirements of 480V, 3 phase, 60Hz, and up to 250
. The PWS has been updated accordingly.kVA
Q2: Separate Furnaces / Separate Power Supplies
Would the customer accept two standalone furnace systems with independent power supplies and controls, while utilizing a shared/switchable cooling system, instead of a common power supply and switching arrangement? Only one furnace would be operated at a time.
A2: As specified in PWS 2.1.1 and 2.1.22, we require that the combination cabinet(s) be combined or stacked. It must be capable of being switched to operate one furnace or the other. Please note in PWS 2.1.22 we do allow for multiples on the power supply(ies), programmable logic controller(s), and touch screen HMI control system(s) within the combined or stacked combination cabinet.
Q3: Alternative Single-Chamber Configuration
Would the customer consider a single furnace chamber with interchangeable refractory-metal and graphite hot zones, provided the offered configuration can meet the required temperature ranges, part-size requirements, vacuum capability, atmosphere control, and other performance requirements?
Or are two physically separate furnace chambers and two separate vacuum systems mandatory?
A3: As specified in PWS 2.1.1, we do require 2 furnace chambers and 2 vacuum systems. These shall be separate items within the suite. A configuration that uses a single chamber with interchangeable hot zones will not meet our performance requirements.
N6893626Q51410001
Q4: Loading Platform / Drawer Requirement
For a front-loading furnace, is the full-extension drawer/platform specifically required, or would the customer consider a conventional front-loading furnace design where the workpiece is manually placed into the furnace chamber using an appropriate hearth/loading fixture?
A4: As specified in PWS 2.1.7, we require the front-loading configuration to have an integrated platform on drawer glides to accommodate placing /removing a sample on the chamber hearth work without the operator having to reach into the chamber. If a vendor has a mechanism different from drawer glides on a front-loading chamber that accomplishes loading/unloading the sample from the chamber without the operator needing to reach into the chamber, that may be considered to meet the requirement, provided it also meets other chamber requirements, including the stability as specified in PWS 2.1.8.
Q5: Vacuum Requirement for 2200C Graphite Furnace
Please confirm whether the 10^-5 Torr vacuum capability must be maintained for both furnace chambers across their full operating temperature ranges, including the 2200C graphite furnace.
Would an alternative high-vacuum pumping configuration be acceptable provided the specified 10^-5 Torr performance is achieved?
A5: We have not specified what type of elements should be used in either furnace chamber. However, upon further review, we recognize that some typical systems for 2200C furnace chambers have multiple factors affecting the possible vacuum range that can be safely held during heating operations. Our application requires at least remaining in the high vacuum range, so for the 2200C furnace, we will accept a vacuum pump system that can pump the chamber to and hold at least torr during full heating operations. PWS 2.1.12 and 2.1.17 has been updated accordingly.10^-3
Q6: NRTL Certification
Would UL certification/approval performed through an NRTL satisfy the electrical certification requirement in Section 2.2.3, provided the completed system also complies with the applicable NFPA 70, 79, and 86 requirements?
A6: Yes, UL is on the list of currently recognized NRTLs.
Q7: Due to the custom nature of the furnace design and the amount of engineering required to come up with pricing, this would require an Engineering Contract for the design and this would cost in the neighborhood of $100,000 to $150,000.00 to come up with a preliminary design information and price quotation.
A7: During our market research and sources sought phases, we received input from market vendors that the requirements as stated in our PWS were possible and we have received multiple preliminary designs as market research at no cost. No costs will be reimbursed prior to the selection of an awardee. CLIN 0001 of this effort is for the Engineering Design Package to be fully developed, and the quoted price shall be included in an offeror's initial quote.
Q8: Example drawings have been provided.
A8: We note that in at least one drawing reference, service requirements list Burner Pilot Gas: Propane. The PWS specifies in 4.2 that we will provide electricity, water, inert gas (specified as argon and nitrogen in 2.1.14), and compressed air. We cannot provide natural gas, steam, or propane.
Section C - Description/Specifications/Statement of Work
Miscellaneous text in this section has been modified to:
Performance Work Statement (PWS) for
High Temperature, Controlled Atmosphere Furnace Suite
1.0 Background
The Composites Engineering Laboratory at Naval Air Warfare Center Weapons Division (NAWCWD) China Lake designs, prototypes, and fabricates composite structures using a variety of methods, striving to remain on the cutting edge of composite materials innovation, new application design, and system prototyping capabilities. Many high temperature, extreme environment materials require heat treatment under careful, fine control of chamber temperature and atmosphere. Different furnace designs are suitable for certain materials processing requirements. Factors such as chamber size and shape, materials used in furnace construction and insulation, power supplies, cooling systems, and furnace element type all influence the final capability of each furnace. The furnace suite features specified in this PWS will fulfill materials processing needs for high temperature composite materials, enabling novel material research and development (R&D), particularly for efforts to develop ceramic and metal composites materials suitable for hypersonic radomes, nozzles, leading edges, and other components. These furnaces are critical material processing tools for the workflow of prototyping additive manufacturing (AM) parts made of ceramic and metal composites. AM material development enables more efficient use of materials, greater capability to test small batches of research materials reducing initial risk, decreased environmental impact through reduced material waste, more complex geometry potential and more consistent composite part production due to AM layer-by-layer build process, and increased potential to successfully transition developed R&D materials and processing methods from lab scale to full scale production.
1.1 Scope
NAWCWD intends to procure a suite of high temperature, controlled atmosphere furnaces in support of current and future capability for metal and ceramic-based composite materials research, development, testing, processing, and production. The furnaces will heat treat metal and ceramic composite test articles and small- to mid-scale proof of concept parts. The Composites Lab routinely prototypes parts of different composite materials and requires high temperature, controlled atmosphere furnaces within its laboratory workflow.
2.0 Requirements
The contractor shall provide a High Temperature, Controlled Atmosphere Furnace Suite that meets the following:
2.1. Furnace Suite Design/Product Specifications and Performance Parameters
2.1.1. Suite shall consist of 2 furnace chambers, 2 vacuum systems, combined chiller, and combined or stacked combination cabinet(s). Every component that is combined shall be capable of being switched between one furnace or the other and have an included switching mechanism that directs its function to the active furnace chamber. There will not be any instance that both furnace chambers will operate simultaneously.
2.1.2. For the 2 furnace chambers: The first shall be designed to operate at max temperature of 1300 degrees Celsius, have an interior chamber size able to physically fit a part of 14.8" x 11.8" x 11.8" and the second shall be designed to operate at a max temperature of 2200 degrees Celsius and have an interior chamber size able to physically fit a part of 12" x 12" x 12".
2.1.3. The furnace elements within each furnace chamber shall be selected to support corrosion resistance and thermal conductivity under high temperature operation such that the elements' expected lifetime meets or exceeds current industry standards under proper use conditions of the selected material in application. The elements shall be of materials and a design that can be readily replaced under current industry standard practices.
2.1.4. Each furnace chamber shall be designed to have integrated radiation and heat shields surrounding their elements to reduce power consumption.
2.1.5. Both furnace chambers shall be designed to have copper water-cooled power feed-throughs delivering power to their elements. There shall not be any water-to-vacuum joints in the power feed-through.
2.1.6. The furnace chamber hot zone shall be designed to maintain consistent temperature within +/- 10 degrees Celsius in the uniform temperature zone. Inside the interior chamber, the uniform temperature zone shall occupy at least 85% of the x-y dimension and at least 40% of the z dimension.
2.1.7. The furnaces chambers shall be either A) a top loading chamber with integrated lift platforms capable of raising and lowering to fully accommodate placing a sample on the chamber hearth work plate and lowering the sample into the chamber without the operator having to reach into the chamber. Or B) a front loading chamber with integrated platform on drawer glides capable of being fully pulled out of the chamber to accommodate placing a sample on the chamber hearth work plate and pushing the sample into the chamber without the operator having to reach into the chamber. Both front loaders and top loaders must fit within the space as defined in 2.1.35 even when fully open.
2.1.8. The stability and anti-vibration of the lift/drawer platform shall be such that a high aspect ratio part can be placed on a "short" surface with a "long" dimension standing perpendicular to the lift/drawer platform and be consistently and fully lowered and raised (or pushed and pulled) into the chamber without the part toppling. As an example for concept, a high aspect ratio item like a ball point pen should be able to be stood on its cap end on the platform and be fully moved into and out the chamber without falling over due to platform motion.
2.1.9. The furnace chambers both shall be stainless steel, double-walled, water-cooled, and electropolished inside and out for improved vacuum pumping and integrity.
2.1.10. Both furnace chambers shall be mounted on powder coated steel frames that stabilize and support the chambers at a height above the ground for ease of operator use.
2.1.11. Both furnace chambers and lids shall be designed with mechanical system support to facilitate ease of opening, so the operator would not be required to physically lift any component of the furnace during any sample loading or unloading operations.
2.1.12. Each furnace chamber shall have a connected vacuum system capable of pumping the chamber to a pressure of at least 10^-5 torr for the 1300C furnace chamber and 10^-3 torr for and able to safely pump on a chamber filled with particulate the 2200C furnace chamber, typically generated under metal and ceramic sintering.
2.1.13. Vacuum systems on both furnace chambers shall include required O-rings, seals, supports, and other hardware and plumbing to connect the vacuum system to the suite. Vacuum lines shall be made of stainless steel.
2.1.14. Each furnace chamber shall have a connection (backfill and flowing) for two standard inert gases (argon and nitrogen) and shall be equipped to support nominal pressure operation up to 2 PSIG with safety interlocks and an over-pressure relief port and valve.
2.1.15. Gas system tubing and fittings shall be made of stainless steel.
2.1.16. On each furnace chamber, both gas lines shall have a solenoid controlled inlet valve, a mechanism to prevent backflow of gas from exit lines into the chamber, an integrated flow meter for flow control and monitoring, and a low-pressure switch for low flow inert gas.
2.1.17. Each furnace chamber shall be able to operate across its entire temperature range under vacuum condition down to 10^-5 torr for the 1300C furnace chamber and 10^-3 torr for the and under inert atmosphere conditions to 2 PSIG. Each furnace 2200C furnace chamber chamber shall have at minimum: one mounted compound gauge reading no higher than 30 PSI and no lower than -30 PSI, two mounted capacitance diaphragm gauges with one ranging between 1000 to 1 torr and the other between 10 to 0.01 torr, one safety pressure relief valve which activates at 5 PSIG, and one leak check port with a manual valve that supports attaching a helium leak detector. Leak detector may be proposed but is not required to be supplied from the contractor.
2.1.18. Both furnace chambers shall be capable of pumping down to 10^-1 torr within 45 minutes or less and be able to maintain vacuum with a leak rate of less than 1x10^-2 torr L/sec.
2.1.19. Both furnace chambers shall be capable of safely backfilling from their maximum vacuum pressure to atmospheric pressure within 45 minutes or less.
2.1.20. Both furnaces chambers shall be connected to a shared water chiller system which can be switched to provide cooling service to one operating furnace chamber at a time.
2.1.21. The chiller system shall be a stainless-steel, closed loop, recirculating reservoir system, capable of maintaining cooling such that the exterior surface of either furnace chamber does not exceed 60 degrees Celsius during operation. The water connection to source water should be designed to handle up to 60 PSIG and a Valves between the chiller flow rate of 12 GPM or less.
circuits shall be manually adjustable ball valves. Flow meters shall be integrated to support chiller system feedback and control, with at least 1 flow meter monitoring each critical circuit.
2.1.22. Each furnace chamber shall be connected to a NEMA-1 enclosed combination cabinet which shall be either combined or stacked to minimize suite footprint. The combination cabinet
(s) shall include the power supply(ies), electrical wiring, programmable logic controller(s) (PLC), and touch screen human machine interface (HMI) control system(s).
2.1.23. The furnace suite power connection shall operate with 480V, 3 phase, 60 Hz, and no more than . The power supply shall be controlled by silicon-control rectifier (SCR) 250 kVA (thyristor) for power regulation and equipped with current limit protection.
2.1.24. Contractor shall provide required main circuit breaker to serve as a main power disconnect of the suite power supply and any required motor starters, fuses, circuit breakers, relays, and switches for each of the suite components.
2.1.25. The HMI system for each furnace shall display a graphical user interface (GUI) in English that supports intuitive user operation of the furnace and be fully integrated to work with the PLC.
2.1.26. The software providing the HMI GUI must not require licensing renewal or software updates to support continued furnace suite operation.
2.1.27. The HMI system (separate for each furnace chamber or shared and switchable) shall have the following minimum specifications: one 24" touch screen monitor, a Windows 10 (or newer) operating system computer with the contractor provided software control system preloaded and ready for user use, an integrated DVD/RW drive, a local area network (LAN) card or ethernet port, 3.8 GHz Quad Core CPU, 16 GB RAM, and a 2 TB SSD hard drive.
2.1.28. All of the furnace suite components must NOT have integrated Wi-Fi, live video streaming, video recording capabilities, or ability to have data transmitted wirelessly. These components all shall NOT require internet connectivity or cloud storage in order to execute programs, store data, or to attain software updates. Integrated LAN card(s) or ethernet port(s) shall be able to support isolated internal network connections such as for direct computer-to-computer transmission and shall not require access to external internet or cloud connections to sustain furnace functions.
2.1.29. The HMI shall be integrated with the PLC and support user access to programming furnace temperature and atmosphere recipes (with ability to store at least 8 programmed recipes), viewing stored data of previous runs, viewing data trends, selecting user security levels and system access, setting overtemperature controls, viewing and responding to furnace alarms (current and historical), adjusting proportional-integrative-derivative (PID) controls, and configuring system settings.
2.1.30. Information displayed on the HMI for each furnace during operation shall include the supplied current and voltage to the heating elements, current program stage from recipe, set point for temperature and pressure, actual temperature and pressure, inert gas flow/vacuum pressure, and chiller system water flow rate and temperature. This data shall be selectable for recording at a frequency the customer selects within a range of at least 1 sec to 30 min.
2.1.31. Both furnace chambers shall have, at minimum, two type C thermocouples, at least one for control and one for overtemperature control.
2.1.32. Type C thermocouple sheathing, gauge, and connection design can limit the safe operation temperature range below 2200 degrees Celsius. If the thermocouples of either furnace chamber are temperature limited for safe operation below their maximum operating temperature, they shall be designed to automatically withdraw from the hot zone upon reaching a preset temperature limit. When the type C thermocouple is withdrawn, the furnace chamber temperature shall be controlled by a two-color pyrometer aligned to take measurements through a sight window into the chamber.
2.1.33. The overtemperature control shall consist of a dedicated high limit controller and thermocouple set, one set for each furnace chamber and each set integrated for use and viewing on the HMI system.
2.1.34. The HMI and all furnace controls for both furnace chambers should be positioned on the combination cabinets for easy user access and system monitoring.
2.1.35. When assembled and fully connected, all suite components, except the chiller, shall fit within a footprint of 20ft x 12ft and height shall be under 10ft. The chiller shall be designed to be set up outside the designated building and connected through the exterior building wall to the remainder of the furnace components. It is preferrable for the chiller to be able to sit against a metal exterior building wall and within a 3ft width, but alternate design and space needs will be considered.
2.1.36. Critical spare parts shall be included in the suite package, suitable for both furnace chambers and including, at minimum, for each furnace chamber: a set of extra heating elements, set of extra heat shields, kit of extra O-rings and seals, extra vacuum sensors, and set of extra control and overtemperature thermocouples. For each furnace chamber individually, critical spare parts unique to each chamber should also be included if needed.
2.1.37. Contractor shall provide a list of recommended spare parts, if any fall outside of the critical spare parts already included in the suite package.
2.1.38. Contractor shall provide a list of their factory acceptance criteria and defined metrics to be met.
2.1.39. Any suite components requiring compressed air shall operate up to 100 PSI.
2.1.40. Contractor shall make arrangements for and include cost for suitable suite packaging and shipping freight to NAWCWD in China Lake, CA 93555.
2.1.41. The Contractor shall prepare and submit an EDP (Engineering Design Package) that describes the proposed technical approach for satisfying all requirements of this PWS. The Contractor shall not proceed with work implementing the EDP until Government concurrence has been obtained.
2.2. Safety
2.2.1. For lines plumbed between suite components, whether for gas, vacuum, compressed air, cooling water, or electricity, all lines shall be planned to minimize tripping hazards to operators and maximally route through conduits or along structural members, edges, or connection points of each suite component. Lines routed along the floor shall be in locations where a regular user walkway is not expected in the recommended suite arrangement.
2.2.2. Furnace suite shall have design considerations for safe operation of a high temperature, controlled atmosphere furnace within a closed building.
2.2.3. Furnace suite shall meet electrical certification from a Nationally Recognized Testing Laboratory (NRTL).
2.2.4. Furnace suite shall conform, at minimum, to National Fire Protection Association (NFPA) codes and standards 70 - National Electric Code:, 79 - Electrical Standard for Industrial Machinery, and 86 - Standard for Ovens and Furnaces.
2.2.5. No furnace suite component shall generate noise higher than 70dB.
2.2.6. Both furnace chambers shall be equipped with a heat zone contactor that only permits power to the heating elements when water flow, overtemperature alarm, and system interlock are activated for safe operation.
2.2.7. Both furnace chambers shall be equipped with an interlock mechanism that restricts opening the chamber while temperature conditions are unsafe for the furnace chamber materials and the operator.
2.2.8. If water flow interruption restricts cooling capability of the chiller for more than 5 seconds, the power supply to active heating elements shall be cut off to prevent overheating of suite components.
2.2.9. Control system shall include at least one readily accessible method to execute an emergency command to stop program run which deenergizes the heating elements in the active furnace chamber. This shall include at least a physical control switch or knob but may also include a stop program button on the touchscreen HMI.
2.2.10. The control system for each furnace chamber shall have an integrated uninterruptable power supply (UPS) capable of providing at least 30 minutes of power in the event of power failure.
2.2.11. Recommended maintenance schedules shall be provided by the contractor.
2.3. System Support
2.3.1. The contractor shall have demonstrated practiced capability in high temperature, controlled atmosphere laboratory furnace engineering design, delivery, and customer service support for at least 10 years. Documentation of the capability shall be verifiable, potential verification routes include published trade articles, documented research efforts, independent analyses, or testimonials from other research laboratory customers.
2.3.2. The contractor shall be responsible for developing and demonstrating checkout procedures to verify the machine meets the requirements of this Statement of Work before installation.
2.3.3. The contractor shall provide at least one physical copy and one digital copy of:
assembly drawings with utility information, installation instructions, operation instruction manuals, drawings for recommended suite arrangement, maintenance manuals and schedules, and wiring diagrams to support the delivered unit.
2.3.4. The assembly drawings with utility information shall include location call outs of utility connection points on all suite components and be provided to the NAWCWD technical point of contact within 4-6 weeks of purchase order for review, feedback, and acceptance before suite is constructed.
2.3.5. Training shall be offered for up to 2 days at the contractor facilities by the contractor during government site visit prior to shipment of the unit.
2.3.6. The contractor shall provide a separately priced line item for on-site machine installation and set-up at NAWCWD, which the Government may elect to procure at it's discretion.
2.3.7. The contractor shall train lab personnel at NAWCWD for up to 3 days in the proper use of the machine immediately after installation - to include safety, programming, and hardware operation.
2.3.8. The contractor shall provide the industry standard 1-year warranty against defects of material and workmanship from the date of commissioning at NAWCWD.
3.0 Deliverables
3.1. High Temperature, Controlled Atmosphere Furnace Suite in accordance with Section 2.0
3.2. Assembly drawings with utility information in accordance with Section 2.3
3.3. Installation instructions in accordance with Section 2.3
3.4. Operation instruction manuals in accordance with Section 2.3
3.5. Drawings for recommended suite arrangement in accordance with Section 2.3
3.6. Maintenance manuals and schedules in accordance with Section 2.3
3.7. Wiring diagrams in accordance with Section 2.3
3.8. Training per Section 2.3
4.0 Special Considerations
4.1. The Government will be responsible for utility connections to the machine.
4.2. The Government will provide electricity, water, inert gas, and compressed air as needed for the suite. Natural gas and steam are unavailable at the installation site.
| IDCode: J |
| Page: 1 |
| Pages: 10 |
| AmendNo: 0001 |
| EffDate: 13 Aug 2026 |
| ReqNo: See Continuation Sheet |
| ProjNo: |
| IssCode: N68936 |
| AdmCode: |
| IssuedBy: NAVAL AIR WARFARE CENTER |
WEAPONS CT 25400E D, 429 E BOWEN RD STOP 4015
CHINA LAKE, CA 93555-6018
UNITED STATES
Kyle Hedman, Email: kyle.d.hedman.civ@us.navy.mil Telephone: 7607933166 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: N6893626Q5141 |
| SolDate: 06 Aug 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: The purpose of this amendment is to answer Industry questions and accordingly make minor updates to the PWS. |