N6893620Q0174
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
SOW
STATEMENT OF WORK
February 26, 2020
1.0 SCOPE
The Energetics Department at NAWC-WD China Lake, CA has a requirement for 11 insulated storage containers to support the lay-up requirements stated in the LTC-TR-263 Launch Test Capability Layup Plan Rev NC.
2.0 Applicable Documents (Drawings, Specs, Any applicable standards, etc.)
LTC-TR-263 Launch Test Capability Layup Plan Rev NC
3.0 TECHNICAL SPECIFICATIONS AND REQUIREMENTS
3.1 GENERAL
The Contractor shall install 2” of Energy Guard Polyiso insulation boards on the outside of 11 conex boxes, which includes using high quality Bonding Adhesive to both Poly and conex box outside walls and roof. The Contractor shall also install 2” of Energy Guard Polyiso on the inside of the entry door of the conex box. The Contractor shall ensure that all seams of polyiso be sealed with a high quality self-adhering seam tape. The Contractor shall ensure that any roof penetrations be sealed with APOC 581 Armor flash, prior to final coating. After polyiso boards are installed, the Contractor shall apply two coats of APOC Sun-Shield Elastomeric Roof coating over the entire outer portion of the insulation. The Contractor is responsible for providing all materials for this effort.
3.1.1 Insulating
The Contractor shall install insulation boards on the outside of ten 20’ and one 40’ conex box as stated in 3.1 above.
3.1.1 Waterproofing
The Contractor shall install weatherproofing materials on all seems and penetrations outside of ten 20’ and one 40’ conex boxes as stated above.
3.1.2 Coating
The Contractor shall spray two coats of Apoc Elastomeric coating outside of ten 20’ and one 40’ conex boxes as stated above.
3.2 DIMINSIONAL & INSPECTION REQUIREMENTS
None
3.3 PRODUCTION
N/A
4.0 DELIVERABLES
4.1 REQUIRED DELIVERABLES
N/A
4.2 DELIVERY SCHEDULE
Timely delivery of this service is two weeks after receipt of order.
5.0 NAWCWPNS ACCESS REQUIREMENTS
5.1 Unclassified: All Contractor personnel must be eligible to perform Non-Critical Sensitive work as defined by SECNAV M-5510.30. All Contractor personnel are required to have a favorably adjudicated Tier-3 investigation from the Office of Personnel Management. The Contractor shall submit a request for personnel security investigation to the Government Security Office. The Government Security Office shall initiate the Contractor's Electronic Questionnaire for Investigations Processing (eQIP)), shall do a preliminary screening of the Contractor's eQIP for suitability and derogatory information. The Contractor employee shall provide all requested information pursuant to the Privacy Act of 1974. The Government Security Office may deny the Contractor access to Government facilities and information and may prohibit the Contractor from performance of sensitive duties for failure to provide requested information or when derogatory or adverse information is present on the Contractor's eQIP, in such cases, the Contractor employee may not perform on the Contract.
5.2 All Contractors must have be a US citizen (passport or appropriate document must be presented) or possess a valid Green Card. Background vetting is required for access if access if not already obtained. Contractor personnel are required to wear or prominently display installation identification badges while visiting or performing work on the installation(s). Upon completion of the contract or expiration of base identification, the contractor shall ensure that all base identification passes and any other secondary area access badges/identification issued to contractor employees are returned to the appropriate component issuing office.
5.3 Contractor employees shall comply with local base procedures for entry into any federal installation controlled and restricted areas. If contractor employees require unescorted entry to controlled or restricted areas, the contractor shall comply with the appropriate Federal Installations Command Physical Security Plan and DoD Personnel Security Program, DoD 5200.2-R.
(End of Summary of Changes) image1.wmf