The file's text, extracted by GovTribe without its formatting.
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Launch Test Capability (LTC) |
| N68936-13-R-0069 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A001 |
| REVISIONS TO EXISTING GOVERNMENT DOCUMENTS |
| CONOPS |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| DI-ADMN-80925 |
| PWS Para. 3.1.1, 3.2.1.1, 3.3.2.1, 3.4.1.1, 4.0 |
| NAWCWD Code 470000D |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
lt
b. COPIES
| 8. APP CODE |
| see blk 16 |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
A
16. Remarks
Block 4: Contractor format is acceptable as long as DID is used for guidance.
Block 9: Use Distribution Statement D: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. Department of Defense contractors only; Critical Technology determined April 2012.
Blocks 10, 12 & 13: Submit Building Occupancy Data, test data, post operations and maintenance data throughout phase. Testing updates due at SVR. Final CONOPS updates due NLT 10 DA end of test series.
Block 14: Submit in an electronic format agreed upon by both Government and Contractor prior to 1st submittal.
See Contract Clause 5252.247-9505, Technical Data and Information for distribution addresses.
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Naval Air Warfare Center, Weapons Division, China Lake, CA 93555-6100 |
| 140819 |
DRRB Chairperson 140819
DD Form 1423-1, 1 Jun 1990
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Launch Test Capability (LTC) |
| N68936-13-R-0069 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A002 |
| SCIENTIFIC AND TECHNICAL REPORTS |
| Air Dispersion Analysis Report |
Meteorological Analysis Report
Magnetometer Analysis Report
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| DI-MISC-80711A |
| PWS Para. 3.1.2.1, 3.1.2.2, 3.1.2.3, 3.1.7.3, 3.2.5.1, 3.2.5.2, 3.2.5.3, 3.3.1, 4.0 |
| NAWCWD Code 470000D |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
lt
b. COPIES
| 8. APP CODE |
| see blk 16 |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
N/A
16. Remarks
Block 4: Contractor format is acceptable as long as DID is used for guidance.
Block 9: Use Distribution Statement D: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. Department of Defense contractors only; Critical Technology determined April 2012.
Blocks 10, 12 & 13: Submit at SVR.
Block 14: Submit in an electronic format agreed upon by both Government and Contractor prior to 1st submittal.
See Contract Clause 5252.247-9505, Technical Data and Information for distribution addresses.
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Naval Air Warfare Center, Weapons Division, China Lake, CA 93555-6100 |
| 140819 |
140819
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Launch Test Capability (LTC) |
| N68936-13-R-0069 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A003 |
| TECHNICAL REPORT – STUDY/SERVICES |
| Verification Opportunities Analysis Report |
ICD Compliance Issue Report
Maintenance, Repair and Modification Report
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| DI-MISC-80508B |
| PWS Para. 3.1.7.1, 3.3.3.1, 4.0 |
| NAWCWD Code 470000D |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
lt
b. COPIES
| 8. APP CODE |
| see blk 16 |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
N/A
16. Remarks
Block 4: Contractor format is acceptable as long as DID is used for guidance.
Block 9: Use Distribution Statement D: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. Department of Defense contractors only; Critical Technology determined April 2012.
Blocks 10, 12 & 13: Submit Verification Opportunities Analysis Reports ASREQ throughout pre-construction and construction of facility and ICD compliance issues NLT 10 DA discovery. Submit Maintenance, Repair and Modification Solution Report at SVR.
Block 14: Submit in an electronic format agreed upon by both Government and Contractor prior to 1st submittal.
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Naval Air Warfare Center, Weapons Division, China Lake, CA 93555-6100 |
| 140819 |
140819
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Launch Test Capability (LTC) |
| N68936-13-R-0069 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A004 |
| SAFETY ASSESSMENT REPORT |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| DI-saft-80102b |
| PWS Para. 3.1.2.4, 3.2.5.4 , 4.0 |
| NAWCWD Code 470000D |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
lt
b. COPIES
| 8. APP CODE |
| see blk 16 |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
N/A
16. Remarks
Block 4: Contractor format is acceptable as long as DID is used for guidance.
Block 9: Use Distribution Statement D: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. Department of Defense contractors only; Critical Technology determined April 2012.
Blocks 10, 12 & 13: Submit ASREQ in accordance with MIL-STD-882.
Block 14: Submit in an electronic format agreed upon by both Government and Contractor prior to 1st submittal.
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Naval Air Warfare Center, Weapons Division, China Lake, CA 93555-6100 |
| 140819 |
140819
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Launch Test Capability (LTC) |
| N68936-13-R-0069 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A005 |
| TEST PLANS/TEST PROCEDURES |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| DI-SESS-81704 |
| PWS Para. 3.1.4.1, 3.1.6.3, 3.1.7.4, 4.0 |
| NAWCWD Code 470000D |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
lt
b. COPIES
| 8. APP CODE |
| see blk 16 |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
N/A
16. Remarks
Block 4: Contractor format is acceptable as long as DID is used for guidance.
Block 9: Use Distribution Statement D: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. Department of Defense contractors only; Critical Technology determined April 2012.
Blocks 10, 12 & 13: Submit NLT 10 days prior to test/inspection; submit final plans at SVR.
Block 14: Submit in an electronic format agreed upon by both Government and Contractor prior to 1st submittal.
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Naval Air Warfare Center, Weapons Division, China Lake, CA 93555-6100 |
| 140819 |
140819
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Launch Test Capability (LTC) |
| N68936-13-R-0069 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A006 |
| TEST/INSPECTION REPORT |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| DI-NDTI-80809B |
| PWS Para. 3.1.4, 3.1.5.3, 3.1.5.4, 3.1.7.2, 3.2.4, 3.2.4.1, 4.0 |
| NAWCWD Code 470000D |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
lt
b. COPIES
| 8. APP CODE |
| see blk 16 |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
N/A
16. Remarks
Block 4: Contractor format is acceptable as long as DID is used for guidance.
Block 9: Use Distribution Statement D: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. Department of Defense contractors only; Critical Technology determined April 2012.
Blocks 10, 12 & 13: Submit NLT 15 DA test; final results due at SVR.
Block 14: Submit in an electronic format agreed upon by both Government and Contractor prior to 1st submittal.
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Naval Air Warfare Center, Weapons Division, China Lake, CA 93555-6100 |
| 140819 |
140819
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Launch Test Capability (LTC) |
| N68936-13-R-0069 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A007 |
| TASK PERFORMANCE ANALYSIS REPORT |
| CDAS Requirements Analysis |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| DI-hfac-81894 |
| PWS Para. 3.1.5.1, 4.0 |
| NAWCWD Code 470000D |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
lt
b. COPIES
| 8. APP CODE |
| see blk 16 |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
N/A
16. Remarks
Block 4: Contractor format is acceptable as long as DID is used for guidance. Analysis to include the development of system architecture for the CDAS.
Block 9: Use Distribution Statement D: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. Department of Defense contractors only; Critical Technology determined April 2012.
Blocks 10, 12 & 13: Submit ASREQ; submit final at SVR.
Block 14: Submit in an electronic format agreed upon by both Government and Contractor prior to 1st submittal.
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Naval Air Warfare Center, Weapons Division, China Lake, CA 93555-6100 |
| 140819 |
140819
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Launch Test Capability (LTC) |
| N68936-13-R-0069 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A008 |
| SPECIAL INSPECTION EQUIPMENT CALIBRATION PROCEDURES |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| DI-QCIC-810007 |
| PWS Para. 3.1.5.5, 4.0 |
| NAWCWD Code 470000D |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
lt
b. COPIES
| 8. APP CODE |
| see blk 16 |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
N/A
16. Remarks
Block 4: Contractor format is acceptable as long as DID is used for guidance.
Block 9: Use Distribution Statement D: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. Department of Defense contractors only; Critical Technology determined April 2012.
Blocks 10, 12 & 13: Submit ASREQ.
Block 14: Submit in an electronic format agreed upon by both Government and Contractor prior to 1st submittal.
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Naval Air Warfare Center, Weapons Division, China Lake, CA 93555-6100 |
| 140819 |
140819
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Launch Test Capability (LTC) |
| N68936-13-R-0069 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A009 |
| MAINTENANCE SUPPORT PLAN |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| DI-ILSS-81225 |
| PWS Para. 3.1.5.6, 3.2.2, 3.2.3, 4.0 |
| NAWCWD Code 470000D |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
lt
b. COPIES
| 8. APP CODE |
| see blk 16 |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
N/A
16. Remarks
Block 4: Contractor format is acceptable as long as DID is used for guidance.
Block 9: Use Distribution Statement D: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. Department of Defense contractors only; Critical Technology determined April 2012.
Blocks 10, 12 & 13: Submit ASREQ.
Block 14: Submit in an electronic format agreed upon by both Government and Contractor prior to 1st submittal.
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Naval Air Warfare Center, Weapons Division, China Lake, CA 93555-6100 |
| 140819 |
140819
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Launch Test Capability (LTC) |
| N68936-13-R-0069 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A00A |
| OPERATING PROCEDURES MANUAL |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| DI-MISC-81418 |
| PWS Para. 3.1.6.1, 3.2.7 , 4.0 |
| NAWCWD Code 470000D |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
lt
b. COPIES
| 8. APP CODE |
| see blk 16 |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
N/A
16. Remarks
Block 4: Contractor format is acceptable as long as DID is used for guidance.
Block 9: Use Distribution Statement D: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. Department of Defense contractors only; Critical Technology determined April 2012.
Blocks 10, 12 & 13: Submit ASREQ during each phase; final due at SVR.
Block 14: Submit in an electronic format agreed upon by both Government and Contractor prior to 1st submittal.
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Naval Air Warfare Center, Weapons Division, China Lake, CA 93555-6100 |
| 140819 |
140819
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Launch Test Capability (LTC) |
| N68936-13-R-0069 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A00b |
| INSTALLATION CONTROL DRAWINGS |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| DI-DRPR-81242 |
| PWS Para. 3.1.6.2 , 4.0 |
| NAWCWD Code 470000D |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
lt
b. COPIES
| 8. APP CODE |
| see blk 16 |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
N/A
16. Remarks
Block 4: Contractor format is acceptable as long as DID is used for guidance.
Block 9: Use Distribution Statement D: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. Department of Defense contractors only; Critical Technology determined April 2012.
Blocks 10, 12 & 13: Submit ASREQ; final due at SVR.
Block 14: Submit in an electronic format agreed upon by both Government and Contractor prior to 1st submittal.
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Naval Air Warfare Center, Weapons Division, China Lake, CA 93555-6100 |
| 140819 |
140819
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Launch Test Capability (LTC) |
| N68936-13-R-0069 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A00C |
| CONTRACTOR’S PROGRESS, STATUS AND MANAGEMENT REPORT |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| DI-MGMT-80227 |
| PWS Para. 4.0, 5.1.5, 5.1.5.1 |
| NAWCWD Code 470000D |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
lt
b. COPIES
| 8. APP CODE |
| see blk 16 |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
N/A
16. Remarks
Block 4: Contractor format is acceptable as long as DID is used for guidance.
Block 9: Use Distribution Statement D: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. Department of Defense contractors only; Critical Technology determined April 2012.
Block 14: Submit in an electronic format agreed upon by both Government and Contractor prior to 1st submittal.
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Naval Air Warfare Center, Weapons Division, China Lake, CA 93555-6100 |
| 140819 |
140819
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Launch Test Capability (LTC) |
| N68936-13-R-0069 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| DI-MISC-81943 |
| PWS Para. 4.0, 5.1.1 |
| NAWCWD Code 470000D |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
lt
b. COPIES
| 8. APP CODE |
| see blk 16 |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
N/A
16. Remarks
Block 4: Contractor format is acceptable as long as DID is used for guidance.
Block 9: Use Distribution Statement D: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. Department of Defense contractors only; Critical Technology determined April 2012.
Blocks 10, 12 & 13: Submit NLT 5 days after completion of trip.
Block 14: Submit in an electronic format agreed upon by both Government and Contractor prior to 1st submittal.
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Naval Air Warfare Center, Weapons Division, China Lake, CA 93555-6100 |
| 140819 |
140819
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| Launch Test Capability (LTC) |
| N68936-13-R-0069 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A00e |
| SITE PREPARATION REQUIREMENTS AND INSTALLATION PLAN |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| DI-MGMT-8033A |
| PWS Para. 3.1.6 , 4.0 |
| NAWCWD Code 470000D |
| 7. DD 250 REQ |
| 9.DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
lt
b. COPIES
| 8. APP CODE |
| see blk 16 |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
N/A
16. Remarks
Block 4: Contractor format is acceptable as long as DID is used for guidance.
Block 9: Use Distribution Statement D: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. Department of Defense contractors only; Critical Technology determined April 2012.
Blocks 10, 12 & 13: Submit NLT 30 DAC.
Block 14: Submit in an electronic format agreed upon by both Government and Contractor prior to 1st submittal.
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Naval Air Warfare Center, Weapons Division, China Lake, CA 93555-6100 |
| 140819 |
140819