DEPARTMENT OF THE NAVY
NAVAL AIR WARFARE CENTER WEAPONS DIVISION
1 ADMINISTRATION CIRCLE
CHIN.fo LAKE. CA 93$M-11100
575 I AVENUE SUITE 1
POINT MUGU. CA 113042-50ol8
JUSTIFICATION AND APPROVAL
FOR USE OF OTHER THAN FULL AND OPEN COMPETITION
1. Contracting Activity.
Naval Air Warfare Center Weapons Division (NAWC-WD)- China Lake, CA
2. Description of the Action Being Approved.
IN REPLY REFER TO
J&A_I3_23258
This JUStification and approval (J&A) authorizes and approves. on a sole source bas1s under contract N68936-12-C-0141, a Level-of-Effort (LOE) contract modification to The Boeing Company (Boeing) providing an additional28,246 hours in support of the AV-8B Joint Systems Support Activity (JSSA), China Lake. CA.
3. Description of Supplies/Services.
The N68936-12-C-O 141 contract provides continued post-production support of the AV-8B Weapons System for the United States Marine Corp (USMC), Spanish Navy, and Italian Navy by modifying and/or upgrading the avionics, weapons components. and software on the AV-8B. These efforts include change proposals for developmental and operations test support, prototypes, demonstrations with applicable on Site technical support. and both technical and logistics analysis. In addition to the aforementioned efforts this contract requ1res the production and delivery of modified avionics, av1onics and support system software, analysis reports. logistics analysis reports, weapon system improvement recommendation reports. and improvement studies
Th1s modification will increase the level of effort to accomplish unanticipated and additional taskmg New tasking mcludes additional flight qualification and analysis for the AIM-120 Missile including Ground Vibration Testing (GVT) and analysis. GVT analysis will require airframe fatigue hfe extension studies.
airframe component fatigue life measurement and analysis (specifically frames 41-43 and Speed Brake), obsolescence study and analysis of airframe and avionics components (e.g., V-Fin antenna, Radar Warning Rece1ver. Advanced Memory Unit). and analysis of British GR-9 aircraft components (both airframe and avionics) for compatibility with US AV-8B aircraft Potential System Configuration Set (SCS) additional tasks include Warfare Management Computer Automated Test Procedure enhancement.
The modification will increase the basic contract already in place. The total estimated contract value including this modification will be $12,215,181 ($6.023,795 current basic plus $6,191.385 modification) and will be funded with a combmation of FY12-17 REDACTED funds. Total period of contract performance will be from 18 Apri12012 to 17 April2017.
See Appendix A for Estimated Dollar Value
J&A 13 23258
4. Statutory Authority Permitting Other Than Full and Open Competition.
10 U.S.C. 2304(c)(1), Only one responsible source and no other supplies or services will satisfy agency requirements.
5. Rationale Justifying Use of Cited Statutory Authonty.
McDonnell Douglas Corporation, now The Boeing Company (Boeing), was the prime contractor for production of the AV-8B aircraft As the sole developer and manufacturer of the production aircraft, Boeing has been integrally engaged with the JSSA for the engineering design and software development for the tactical software and integration of functional improvements and new weapons upgrades. The tactical software, system integration expertise, and aircraft performance knowledge available from Boeing was acquired over a period of approximately 32 years. The Integration of additional capabilities or corrections to existing capabilities into the AV-8B weapon system for the duration of the AV-8B service life requires the knowledge and expertise that Boeing developed over these past 32 years. The increased complexity of tactical software, system integration expertise. and aircraft performance knowledge requires Boeing's experienced resources espec1ally in the areas of flying qualities, aircraft modifications. and support publications updates. The Government does not have the necessary rights to the aircraft techmcal data package that would be reqwed to perform this effort. In order for any other vendor to accomplish updating the software it would require access to Boeing's technical data for the aircraft. Inquiry into purchasing the AV-8B data rights package (in either part or whole) from The Boeing Company to accomplish full and open competition was ultimately shown to be cost prohibitive. Furthermore, The Boeing Company has declined to relinquish data rights for the AV-8B platform.
6. Description of Efforts Made to Solicit Offers from as Manv Offerors as Practicable.
In accordance with FAR 5.201(b)(1), this reqwement was synopsized via the Federal Business Opportunities webs1te on 04/30/2013 No responses or inquiries were received. Any future responses will be evaluated by the Contracting Officer.
7. Determination of Fair and Reasonable Cost.
In accordance with FAR 15.402. the Contracting Officer shall ensure that all supplies and services ordered under this contract are procured at a fair and reasonable price The Contractor w111 submit a formal price proposal with certified cost or pricing data and sufficient information to support the accuracy and reliability of the estimate. The proposed cost Will be reviewed by experienced technical analysts and contract specialists with the atd of necessary field pncing support. Analysts will be based on historical cost and rate information provided by field pricing support agencies. The Contracting Officer will use the cost and price analys1s as the basis for negotiating a fair and reasonable price with the contractor.
8. Actions to Remove Barriers to Future Competition.
None at this time. Based on the rationale identified 1n paragraph 5, the efforts under this J&A are sole source to The Boeing Company.
J&A 13 23258
Appendix A
Estimated Dollar Value In Thousands
FY13 l FY14 FY15 FY16 FY17 FY18 FY19 + _ _]Qtal _ -
±= REDACTED
-'" $6191 k