This is a Quality Assurance Surveillance Plan (QASP) for a Naval Construction Group Two maintenance and management support contract at Naval Construction Battalion Center Gulfport, MS. The plan establishes performance metrics and monitoring procedures for contractor-provided services related to Maritime Prepositioning Force and Naval Construction Force Construction Capability Augment Tables of Allowance.

The QASP details ten primary tasks with defined performance objectives, standards, frequencies, acceptable quality levels (AQL), and surveillance methods. Task 4.1 requires effective supervision and technical expertise for data input, systems management, inventory management, equipment maintenance, and material processing for DLA Disposition Services, with 95% accountability as the command goal and daily Monday-through-Friday oversight via random inspections and weekly production reports. Task 4.2 addresses R-Supply system maintenance and management with 95% compliance for data input accuracy (5% error tolerance). Task 4.3 covers CESE repair parts and centrally managed material inventory management for four TOAs and 854 pieces of equipment at 95% compliance. Task 4.4 requires maintenance of MDS/PMS databases in OMMS-NG and SKED 3-M systems for 1,600 pieces of equipment at 95% compliance. Tasks 4.5 through 4.10 address property inventory management system updates, physical inventory and maintenance of TOA material and MLO construction materials, preventive maintenance scheduling with weekly PMS reports, and Navy ERP data input for over 4,500 units of equipment. All tasks require daily Monday-through-Friday performance with surveillance conducted through random inspections, customer surveys, and work review feedback, with AQLs typically set at 95-98% compliance rates.

View the file

Other files

File Type Posted
2.02a WD New.pdf PDF
2.02 RFQ N6883627Q0003.pdf PDF
1.03 PWS.pdf PDF
2.05 CAP.pdf PDF
2.02 CDRL.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan

NAVAL CONSTRUCTION GROUP TWO

MARITIME PREPOSITIONING FORCE AND NAVAL CONSTRUCTION FORCE

CONSTRUCTION CAPABILITY AUGMENT TABLES OF ALLOWANCE

MAINTENANCE AND MANAGEMENT SUPPORT

NAVAL CONSTRUCTION BATTALION CENTER GULFPORT, MS

TASK Performance Objective

Performance Standards Frequency

Acceptable Quality level

(AQL)

Surveillance Method

4.1.

The Contractor shall provide effective supervision and technical expertise to manage and coordinate the data input, systems management, inventory management, equipment maintenance management, equipment tracking, movement, shipment, packing/unpacking of material and processing material for DLA Disposition Services

Adhere to requirements specified in PWS.

Perform QA checks. Ensure data is inputted and updated. Supply management, 3-M and property inventory management systems are managed properly, material inventory is scheduled and performed, packed and stowed, quantity and material condition is acceptable, material is properly maintained, equipment maintenance support is provided

Daily

Monday thru Friday

Perform QA checks. Ensure data is inputted and updated. R- Supply, 3-M and property inventory management systems are managed properly, material inventory is scheduled and performed, packed and stowed, quantity and material condition is acceptable, material is properly maintained, equipment maintenance support is provided 95% accountability of TOA material is the overall command goal.

Random inspections/Customer Surveys or feedback/review of completed work.

Provide weekly production reports

4.2

The Contractor will utilize the NTCSS R-Supply system or most current automated Navy Supply management system to Maintain and manage Supply system applications.

Apply NTCSS R- Supply functions.

Provide NTCSS R- Supply financial and inventory

Manage and maintain the R- Supply instances for four (4) MPF NCE TOAs and supply support within the supply program

Daily management and processing financial requirements

95% compliance of data input accuracy and all reports (5% error)

Random inspections/Customer Surveys or feedback/review of completed work.

MARITIME PREPOSITIONING FORCE AND NAVAL CONSTRUCTION FORCE

CONSTRUCTION CAPABILITY AUGMENT TABLES OF ALLOWANCE

system management.

Generate and run all required R-Supply reports

4.3

The contractor shall maintain and manage CESE repair parts/spares COSAL and other MPF and NCG 2 centrally managed material inventory for inventory management applications utilizing R-Supply or other property inventory management systems

Adhere to requirements specified in the PWS. Manage and maintain MPF

NCE, TOA

COSAL and NCG 2 centrally managed TOA material for four

(4) TOAs.

Maintaining CESE repair parts for 854 pieces of equipment and other material

Daily management and COSAL maintenance of COSAL and material inventory validity (5% error)

Random inspections/Customer Surveys or

4.4

The contractor shall maintain an accurate MDS/PMS database in OMMS- NG and SKED 3-M systems, for the MPF NCE and FIE, NCG 2 and NCFCCA centrally managed TOA

Adhere to requirements specified in the PWS. Maintain, update and manage 3-M systems for maintenance and configuration data for 1600 pieces of CESE and Non- CESE equipment.

Daily 3-M system management of configuration data validity and equipment PMS system management (5% error)

Random inspections/Customer Surveys or

MARITIME PREPOSITIONING FORCE AND NAVAL CONSTRUCTION FORCE

CONSTRUCTION CAPABILITY AUGMENT TABLES OF ALLOWANCE

4.5

The contractor shall maintain and manage Navy property inventory management systems and on-hand inventory data in current inventory management systems

Adhere to requirements specified in the PWS. Maintain and update property inventory management system and update TOA on-hand inventory data in inventory management systems for 4 MPF TOAs, NCG 2 centrally managed TOA and other TOA data.

Daily Inventory management system update and management

98% compliance of inventory validity in inventory management systems (2% error)

Random inspections/Customer Surveys or feedback/review of completed work.

4.6

The contractor shall perform inventory and maintain TOA material in warehouse and TOA locations, to include shelf life surveillance for deployed TOA material.

Adhere to requirements specified in the PWS. Conduct, inventory, inspection, receipt, and re-stow of received and returned material and equipment;

and receive and stow new material.

Daily perform inventory and maintain TOA material Monday thru Friday

95% compliance of inventory validity in inventory management (5% error)

Random inspections/spot checks or feedback/review of completed work.

4.7

The contractor shall Inventory and track installed equipment C4I and C5I communications integration gear on all NCG 2 and Subordinate CESE and maintain CESE C4I and C5I integration management data lists

Adhere to requirements specified in the PWS. Inventory, track and maintain integration lists for C4I and C5I Communication integration gear on all NCG 2 Subordinate TOA CESE, for deployed, MPF and Homeport NMCB TOAs, NCR TOA, UCT 1

Daily inventory and track C4I and C5I Comm integration gear.

Monday thru Friday

95% compliance of inventory validity in inventory management (5% error

Random inspections/spot checks or

MARITIME PREPOSITIONING FORCE AND NAVAL CONSTRUCTION FORCE

CONSTRUCTION CAPABILITY AUGMENT TABLES OF ALLOWANCE

TOA and CBMU

TOA

4.8

The contractor shall manage and maintain MLO construction material inventories in warehouse locations and monitor, assess and correct process deficiencies

Adhere to requirements specified in the PWS. Conduct, inventories, inspection, receipt, and re-stow of received and returned material;

and receive and stow new material and assess process management.

Daily perform inventory and maintain

MLO

construction material Monday thru Friday

95% compliance of inventory validity in inventory management (5% error)

Random inspections/spot checks or feedback/review of completed work.

4.9

The contractor shall perform scheduled equipment preventive maintenance, and submit completed weekly PMS reports

Adhere to requirements specified in the PWS. perform equipment scheduled preventive maintenance in accordance with maintenance procedural manuals, under the Navy (3-M) System.

Daily.

perform equipment scheduled preventive maintenance Monday thru Friday

95% accuracy of completion of

PMS

Customer review of the weekly reports and equipment inspection and 3-M spot checks

4.10

The Contractor shall perform data input and maintain Navy equipment inventory in the Navy ERP and Navy Property Accountability system databases daily, maintaining

Adhere to requirements specified in the PWS. Maintain and update inventory management systems, and update TOA inventory data in

Adhere to requirements specified in the PWS.

Daily Inventory management system update and management

98% compliance of inventory validity in inventory management systems (2% error)

Random inspections/Customer Surveys or

MARITIME PREPOSITIONING FORCE AND NAVAL CONSTRUCTION FORCE

CONSTRUCTION CAPABILITY AUGMENT TABLES OF ALLOWANCE

records and management of Civil Engineer Support Equipment

(CESE).

management systems for MPF TOAs, NCG 2 TOA, centrally managed TOA and other TOA data for over 4,500 units of Equipment.