December 17rd 2018
STATEMENT OF WORK
INSTALLATION OF ACCORDION PARTION WALL
NAVY TRAINING SPACE
BUILDING 511
CENTER FOR INFORMATION WARFARE TRAINING
CORRY STATION
640 ROBERTS AVENUE
PENSACOLA, FL 32511-5138
TABLE OF CONTENTS
Section/Paragraph
TITLE
PAGE
Cover Page
Table of Contents
1.0
Purpose
2.0
Scope
3.0
Requirements
4.0 Location of Task 3
5.0
Special Instructions
6.0
Safety
7.0
Billing and Payment Plan
8.0
Points of Contact
1.0 PURPOSE: This Statement of Work (SOW) provides for the installation of sound rated accordion bi-parting partition wall to allow the separation and sound reduction of a very large training space. The contractor will provide all other necessary materials for the project completion.
2.0 SCOPE: This SOW describes the task requirements to be performed, location and the materials specific to the project. The Period of Performance is 120 work days, after award.
3.0 REQUIREMENTS: The contractor shall perform task assignments within the parameters of the specific requirements outlined in this section.
3.1 TASK: The contractor shall install a STC 41 sound rated accordion bi-parting partition wall for a space opening of 29 feet wide by 9 feet high.
3.2 The contractor will provide all necessary materials, including the uni-span component for the project completion.
3.3 The contractor shall apply the applicable installation methods to ensure that the accordion bi-parting partition wall is safe for continuous use with the navy space.
4.0 LOCATION OF TASK: The installation of the sound rated accordion bi-parting partition wall is between the Navy’s rooms 124 and 125, in building 511, Corry Station, 640 Roberts Avenue, Pensacola.
5.0 SPECIAL INSTRUCTIONS: The contractor shall dispose of all construction debris according to Florida regulations and best commercial business practices. The contractor will return the workspace to its new install and original condition upon project completion.
6.0 SAFETY: The contractor will ensure that all navy safety policies are reviewed and methods approved by base safety office. The method of installation shall meet applicable building codes. The use of Personal Protection Equipment (PPE) is enforced during project.
7.0 Billing and Payment Plan: Upon project completion, project invoice shall be submitted via the Wide Area Work Flow System.
8.0 Points of Contact: Center of Information Warfare Training (CIWT) Facilities, primary; Facilities Operations Specialist – Richard Mahon; Com: (850) 452-6450, Email Richard.t.mahon@navy.mil or secondary; Facilities Operations Supervisor - Darrel Bishop; Com: (850) 452-6355; Email Darrel.bishop@navy.mil