BID_SCHEDULE_-_N6883619Q0016_EP19_PUERTO_CASTILLA_-_HONDURAS.xlsx

XLSX spreadsheet 64 KB Posted

Attached to
Expeditionary Logistics Support - Enduring Promise Puerto Castilla, Honduras
Solicitation number
N6883619Q0016
Issued by

View the file

Other files

File Type Posted
N6883619Q0016_SF_1449.pdf PDF
N6883619Q0016_N6883619Q0016_Synopsis.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

OPERATION ENDURING PROMISE - PUERTO CASTILLA

BID SCHEDULE SUMMARY
SITESOM&N
Med Site #1 Banana Cruise Port$ - 0
Med Site #2 Centro de Education Basica Dr. Jesus Augilar Paz. Corocito$ 1,500.00
Helo Landing Zone (HLZ) #1$ - 0
Fleet Landing Zone$ - 0
ACE Team$ - 0
Helo Landing Zone (HLZ) #2$ - 0
GRAND TOTAL$ 1,500.00

MEDSITE #1

MED SITE #1 BANANA COAST CRUISE PORT

COMMENTS
PERIOD6 DEC 2018 - 14 DEC 201806-07 Setup. 08-12 Mission Execute. 13-14 Breakdown.
DAYS OF SERVICE9
PERSONNEL
MAIN PERSONNEL120
TOTAL120
ITEMDESCRIPTION OF SUPPLIES OR SERIVESDAYSQTYUNIT PRICEOM&N TotalCOMMENTS
TRANSPORTATIONDAYSQTYTOTALNot Needed due to Fleet Landing = Med Site
240 Pax Bus w/Driver & Fuel03531.51012 HOURS/DAY REQUIRED TO TRANSPORT 120 PERSONNEL TO EACH MED SIGHT
BOTTLE WATERDAYSQTYTOTAL
18CASES OF WATER945$0.0024-16.9oz per case (45 cases delivered every morning).
ICEDAYSQTYTOTAL
20ICE (units in quantity are kg)9100$0.00100kg per day delivered with insulated ice chests provided.
WASTEDAYSQTYTOTAL
2255 Gallon Trash Can910$0.00Emptied 2x daily.
LATRINE/WATER WASTEDAYSQTYTOTAL
24Portable Latrines (PORTA POTTIES) (3'X3'X7')916$0.00To include cleaning/restocking four (4) rolls of toilet paper and pumping 2x per day early in the morning and evening.
25Triple-sink Handwashing station 3 faucets, soap & paper dispenser95$0.00Cleaned, Restocked, and pumped 2x per day, loaded and offloaded from the camp-site by contractor.
VECTOR/GRASSDAYSQTYTOTAL
28VECTOR CONTROL (spraying)1EA$0.00Aprrox four (4) acres to be performed on 03 December 2018.
POTABLE WATERDAYSQTYTOTAL
30Distilled Water (Dental Chairs)1150$0.00Delivered in Distilled five (5) Gal Containers.
FUELDAYSQTYTOTAL
32MOGAS (GAL)1300$0.00FPCON FUEL REQUIREMENTS
33DIESEL (GAL)1340$0.00FPCON FUEL REQUIREMENTS
RENTAL EQUIPTMENTDAYSQTYTOTAL
34Security Barriers, pedestrian, size 5' length9675$0.00Length is in Feet. 5’ length per section, 135 sections, totaling 675’
35Canopies (15' x 15') free standing91$0.00
36Chairs , plastic, stacking or folding9600$0.00
37Tables, 6' Folding950$0.00
38Portable warehouse fan97$0.007,500-10,000 CFM
39Portable Pedastal Oscillating fan940$0.0018" oscillating adjustable height floor or pedestal fans or equivalent
40Rental Generators (3kw)/With Fuel911$0.00NOT TO EXCEED 50 Decibles (DBS)
41Rental Generators (10kw)/With Fuel92$0.00120V
42Rental Generators (20kw)/With Fuel91$0.00240-120V
43Night Security Lighting gas powered w/fuel915$0.0015' high with 12 hours of use. Fueled Daily.
CONSTRUCTIONDAYSQUANTITYU/POM&N TotalCOMMENTS
54Building Cleaning19$0.00Clean/Sanitize nine (9) rooms throughout four (4) buildings
55Furniture Movement16$0.00Aprox 5000 lbs six (6) Roooms
56Pavers11$0.00In accordance with the medical site schematics (attached) Remove and haul away roughly two (2) inches of dirt in the three (3) identified dirt floor buildings. Level and Install approximately 5,000 square feet of pavers (reuse existing pavers as needed) taking care to ensure that the pavers are below the door sills and doors can easily open and close. The pavers are to present a smooth surface for patient movement using something like a wheelchair.
SITE TOTAL$0.00

MEDSITE #2

MED SITE #2 Centro de Education Basica Dr. Jesus Augilar Paz. Corocito, Bonito Oriental, Colon, Honduras

COMMENTS
PERIOD6 DEC 2018 - 14 DEC 201806-07 Setup. 08-12 Mission Execute. 13-14 Breakdown.
DAYS OF SERVICE9
PERSONNEL
MAIN PERSONNEL120
TOTAL120
ITEMDESCRIPTION OF SUPPLIES OR SERIVESDAYSQTYUNIT PRICEOM&N TotalCOMMENTS
TRANSPORTATIONDAYSQTYTOTAL
240 Pax Bus w/Driver & Fuel93$0.0012 HOURS PER DAY REQUIRED TO TRANSPORT 120 PERSONNEL TO EACH MED SIGHT
BOTTLE WATERDAYSQTYTOTAL
19CASES OF WATER945$0.0024-16.9oz per case (45 cases delivered every morning)
ICEDAYSQTYTOTAL
21ICE (units in quantity are kg)9100$0.00100kg per day delivered with insulated ice chests provided.
WASTEDAYSQTYTOTAL
2355 Gallon Trash Can910$0.00Emptied 2x daily
LATRINE/WATER WASTEDAYSQTYTOTAL
26Portable Latrines (PORTA POTTIES) (3'X3'X7')916$0.00To include cleaning/restocking four (4) roles of toilet paper and pumping 2x per day early in the morning and evening.
27Triple-sink Handwashing station 3 faucets, soap & paper dispenser95$0.00Cleaned, Restocked, and pumped 2x per day loaded and offloaded from the camp-site by contractor.
VECTOR/GRASSDAYSQTYTOTAL
29VECTOR CONTROL (spraying)1EA$0.00Aprrox 1 acre to be performed on 03 December 2018
POTABLE WATERDAYSQTYTOTAL
31Distilled Water (Dental Chairs)1150$0.00Delivered in Distilled five (5) Gallon containers
RENTAL EQUIPTMENTDAYSQTYTOTAL
44Security Barriers, pedestrain, size 5' length9250$0.00Length is in Feet. 5’ length per section, 50 sections, totaling 250’
45Canopies (15' x 15') free standing912$0.00
46Chairs , plastic, stackable or foldable9684$0.00
47Tables, 6' Folding956$0.00
48Portable warehouse fan96$0.007,500-10,000 CFM
49Portable Pedastal Oscillating fan932$0.0018" oscillating adjustable height floor or pedestal fans or equivalent
50Rental Generators (3kw)/With Fuel916$0.00NOT TO EXCEED 50 Decibles (DBS)
51Rental Generators (10kw)/With Fuel92$0.00120V
52Rental Generators (20kw)/With Fuel91$0.00240-120V
53Night Security Lighting gas powered w/fuel916$0.0015' high with 12 hours of use. Fueled Daily.

Elkhay, Heather M CIV NAVSUP FLC Jacksonville, 230: Elkhay, Heather M CIV NAVSUP FLC Jacksonville, 230:

To match PWS

CONSTRUCTIONDAYSQUANTITYU/POM&N TotalCOMMENTS
57Railing, Temporary11$0.00Construction of 75 Feet of temporary railing, specified in attached drawings.

Elkhay, Heather M CIV NAVSUP FLC Jacksonville, 230: Elkhay, Heather M CIV NAVSUP FLC Jacksonville, 230:

To match PWS

MISCELLANEOUS MATERIALSDAYSQUANTITYU/POM&N TotalCOMMENTS
58Miscellaneous materials to assist in tasking11$1,500.00$1,500.00NOT TO EXCEED (NTE) $1,500.00 and all and/or any cost must be approved by the COR before proceeding.
SITE TOTAL$1,500.00

HLZ #1

HELO LANDING ZONE #1 Aeropuerto de Trujillo

COMMENTS
PERIOD6 DEC 2018 - 14 DEC 201806-07 Setup. 08-12 Mission Execute. 13-14 Breakdown.
DAYS OF SERVICE9
PERSONNEL
MAIN PERSONNEL240
TOTAL240
ITEMDESCRIPTION OF SUPPLIES OR SERIVESDAYSQTYUNIT PRICEOM&N TotalCOMMENTS
LINE HAULDAYSQTYTOTAL
6Line Haul from location 3 to location 122$0.0060' Diesel flatbed trucks to move a variety of TRICON CONTAINERS (8 ft L X 6 ft W X 8 ft, approx. 6,000 lbs each), ISU-90 Containers (88"x108"x90 approx.6,000 lbs each). Shall include driver, fuel, unlimited mileage and associated chains, straps/load securing gear.Med Site 1
710,000 LB FORKLIFT and W/DRIVER, FUEL, UNLIMITED MILEAGE, 14 hours a day.21$0.00One (1) All-Terrain Forklift per truck w/operator, fuel, unlimited mileage to load and offload. Forklift shall have adjustable and extended forks. Capable of driving off road.
8TRUCK TRACTOR W/ 52’SEMITRAILER LOWBED 55 TON W/ DRIVER, FUEL, UNLIMITED MILAGE AND ASSOCIATED STRAPS/LOAD SECURING GEAR 14 hours a day21$0.00Truck Tractor with an attached 8’ x 52’ LOWBED SEMITRAILER to move one (1) 10k all-terrain forklift with (preferred) hydraulic powered self-contained detachable gooseneck. Shall include chains, straps/securing gear. Truck Tractor provided w/operator, fuel and unlimited mileage to load and transport one (1) 10K Forklift.
9Line Haul from location 3 to location 222$0.0060' Diesel flatbed trucks to move a variety of TRICON CONTAINERS (8 ft L X 6 ft W X 8 ft, approx. 6,000 lbs each), ISU-90 Containers (88"x108"x90 approx.6,000 lbs each) Shall include driver, fuel, unlimited milleage and associated chains, straps/load securing gear.Med Site 2
1010,000 LB FORKLIFT and W/DRIVER, FUEL, UNLIMITED MILEAGE, 14 hours a day.21$0.001 All-Terrain Forklift per truck w/operator, fuel, unlimited mileage to load and offload. Forklift shall have adjustable and extended forks. Capable of driving off road.
11TRUCK TRACTOR W/ 52’SEMITRAILER LOWBED 55 TON W/ DRIVER, FUEL, UNLIMITED MILAGE AND ASSOCIATED STRAPS/LOAD SECURING GEAR 14 hours a day21$0.00Truck Tractor with an attached 8’ x 52’ LOWBED SEMITRAILER to move one (1) 10k all-terrain forklift with (preferred) hydraulic powered self-contained detachable gooseneck. Shall include chains, straps/securing gear driver, fuel, unlimited milated and associated chains, straps/load securing gear. Truck Tractor provided w/operator, fuel and unlimited mileage to load and transport (1) 10K Forklift.
12Line Haul from location 1 to location 322$0.0060' Diesel flatbed trucks to move a variety of TRICON CONTAINERS (8 ft L X 6 ft W X 8 ft, approx. 6,000 lbs each), ISU-90 Containers (88"x108"x90 approx.6,000 lbs each). Shall include driver, fuel, unlimited mileage and associated chains, straps/load securing gear.Med Site 1
1310,000 LB FORKLIFT and W/DRIVER, FUEL, UNLIMITED MILEAGE, 14 hours a day.21$0.001 All-Terrain Forklift per truck w/operator, fuel, unlimited mileage to load and offload.
14TRUCK TRACTOR W/ 52’SEMITRAILER LOWBED 55 TON W/ DRIVER, FUEL, UNLIMITED MILAGE AND ASSOCIATED STRAPS/LOAD SECURING GEAR 14 hours a day21$0.00Truck Tractor with an attached 8’ x 52’ LOWBED SEMITRAILER to move one (1) 10k all-terrain forklift with (preferred) hydraulic powered self-contained detachable gooseneck. Shall include chains, straps/securing gear. Truck Tractor provided w/operator, fuel and unlimited mileage to load and transport one (1) 10K Forklift.
15Line Haul from location 2 to location 322$0.0060' Diesel flatbed trucks to move a variety of TRICON CONTAINERS (8' L X 6' W X 8' H, approx. 6,000 lbs each), ISU-90 Containers (88"x108"x90 approx.6,000 lbs each). Shall include driver, fuel, unlimited mileage and associated chains, straps/load securing gear.Med Site 2
1610,000 LB FORKLIFT and W/DRIVER, FUEL, UNLIMITED MILEAGE, 14 hours a day.21$0.00One (1) All-Terrain Forklift per truck w/operator, fuel, unlimited mileage to load and offload.
17TRUCK TRACTOR W/ 52’SEMITRAILER LOWBED 55 TON W/ DRIVER, FUEL, UNLIMITED MILAGE AND ASSOCIATED STRAPS/LOAD SECURING GEAR 14 hours a day21$0.00Truck Tractor with an attached 8’ x 52’ LOWBED SEMITRAILER to move one (1) 10k all-terrain forklift with (preferred) hydraulic powered self-contained detachable gooseneck. Shall include chains, straps/securing gear. Truck Tractor provided w/operator, fuel and unlimited mileage to load and transport one (1) Forklift.
TOTAL$0.00

FLEET LANDING

FLEET LANDING: BANANA COAST CRUISE PORT

COMMENTS
PERIOD6 DEC 2018 - 14 DEC 2018
DAYS OF SERVICE9
PERSONNEL
MAIN PERSONNEL240
TOTAL240
ITEMDESCRIPTION OF SUPPLIES OR SERIVESDAYSQTYUNIT PRICEOM&N TotalCOMMENTS
TRANSPORTATIONDAYSQTYTOTAL
36-Pax 4x4 SUV 4WD/w DRIVER, UNLIMITED MILEAGE92$0.00COMMAND ELEMENT 24 HOURS/DAY
COMMUNICATIONDAYSQTYTOTAL
5SMART PHONES WITH SIM CARD920$0.00HOST NATION CARRIER PROVIDED Unlimited local and international calls and txt, and data
TOTAL$0.00

ACE TEAM

ACE TEAM HONDURAS - Aeropuerto Internacional Ramón Villeda Morales, San Pedro Sula

COMMENTS
PERIOD1 DEC 2018 -14 DEC 2018
DAYS OF SERVICE14
PERSONNEL
MAIN PERSONNEL5DESRON Lead, Medical Planner x2, COR
ITEMDESCRIPTION OF SUPPLIES OR SERIVESDAYSQTYUNIT PRICEOM&N TotalCOMMENTS
TRANSPORTATIONTOTAL
16-Pax 4x4 SUV 4WD/w DRIVER, UNLIMITED MILEAGE142$0.0024 HOURS/DAY turned over to base camp upon departure of ACE team.
COMMUNICATIONDAYSQTYTOTAL
4SMART PHONES WITH SIM CARD145$0.00HOST NATION CARRIER PROVIDED Unlimited international calls, local calls, txt, and data
TOTAL$0.00

HLZ #2 (Back Up)

HELO LANDING ZONE #2 Base Naval de Puerto Castilla
Back-Up HLZ
COMMENTS
PERIOD6 DEC 2018 - 14 DEC 201806-07 Setup. 08-12 Mission Execute. 13-14 Breakdown.
DAYS OF SERVICE9
PERSONNEL
MAIN PERSONNEL240
TOTAL240
ITEMDESCRIPTION OF SUPPLIES OR SERIVESDAYSQTYUNIT PRICEOM&N TotalCOMMENTS
LINE HAULDAYSQTYTOTAL
Line Haul from location 4 to location 220$469.58$0.0060' Diesel flatbed truck to move a variety of TRICON CONTAINERS (8 ft L X 6 ft W X 8 ft, approx. 6,000 lbs each), ISU-90 Containers (88"x108"x90 approx.6,000 lbs each)
10,000 LB FORKLIFT and W/DRIVER, FUEL, UNLIMITED MILEAGE, 14 hours a day.20$861.50$0.001 All-Terrain Forklift per truck w/operator, fuel, unlimited mileage to load and offload.
TRUCK TRACTOR W/ 52’SEMITRAILER LOWBED 55 TON W/ DRIVER, FUEL, UNLIMITED MILAGE AND ASSOCIATED STRAPS/LOAD SECURING GEAR 14 hours a day20$800.00$0.00Truck Tractor with an attached 8’ x 52’ LOWBED SEMITRAILER to move one (1) 10k all-terrain forklift with (preferred) hydraulic powered self-contained detachable gooseneck. Shall include chains, straps/securing gear. Truck Tractor provided w/operator, fuel and unlimited mileage to load and transport (1) Forklift
Line Haul from location 2 to location 420$469.58$0.0060' Diesel flatbed truck to move a variety of TRICON CONTAINERS (8 ft L X 6 ft W X 8 ft, approx. 6,000 lbs each), ISU-90 Containers (88"x108"x90 approx.6,000 lbs each)
10,000 LB FORKLIFT and W/DRIVER, FUEL, UNLIMITED MILEAGE, 14 hours a day.20$861.50$0.001 All-Terrain Forklift per truck w/operator, fuel, unlimited mileage to load and offload.
TRUCK TRACTOR W/ 52’SEMITRAILER LOWBED 55 TON W/ DRIVER, FUEL, UNLIMITED MILAGE AND ASSOCIATED STRAPS/LOAD SECURING GEAR 14 hours a day20$800.00$0.00Truck Tractor with an attached 8’ x 52’ LOWBED SEMITRAILER to move one (1) 10k all-terrain forklift with (preferred) hydraulic powered self-contained detachable gooseneck. Shall include chains, straps/securing gear. Truck Tractor provided w/operator, fuel and unlimited mileage to load and transport (1) Forklift
TOTAL$0.00

MEDSITE #1 ALTERNATE

MED SITE #1 Escuela Guia Tecnica No. 16 Naciones Unidas, Trujillo, Colon

COMMENTS
PERIOD24 NOV 2018 - 02 DEC 201824-25 Setup. 26-30 Mission Execute. 01-02 Breakdown.
DAYS OF SERVICE9
PERSONNEL
MAIN PERSONNEL120
TOTAL120
ITEMDESCRIPTION OF SUPPLIES OR SERIVESDAYSQTYUNIT PRICEOM&N TotalCOMMENTS
TRANSPORTATIONDAYSQTYTOTAL
240 Pax Bus w/Driver & Fuel93$531.51$14,350.7712 HOURS/DAY REQUIRED TO TRANSPORT 120 PERSONNEL TO EACH MED SIGHT
BOTTLE WATERDAYSQTYTOTAL
19CASES OF WATER945$11.67$4,726.3524-16.9oz per case (45 cases delivered every morning)
ICEDAYSQTYTOTAL
21ICE (units in quantity are kg)9100$0.08$72.90100kg a day delivered with insulated ice chests provided.
WASTEDAYSQTYTOTAL
2355 Gallon Trash Can910$11.36$1,022.40Emptied 2x daily
LATRINE/WATER WASTEDAYSQTYTOTAL
25Portable Latrines (PORTA POTTIES) (3'X3'X7')916$92.00$13,248.00To include cleaning/restocking 4 roles of toilet paper/pumping 2x a day early in the morning and evening.
26Triple-sink Handwashing station 3 faucets, soap & paper dispenser95$134.55$6,054.75Cleaned, Restocked, and pumped 2x a day loaded and offloaded from the camp-site by contractor.
VECTOR/GRASSDAYSQTYTOTAL
29VECTOR CONTROL (spraying)1EA$431.25$431.25Vector Control on 21 November 2018
POTABLE WATERDAYSQTYTOTAL
31Distilled Water (Dental Chairs)1150$0.52$78.00Delivered in Distilled 5 GL Containers
FUELDAYSQTYTOTAL
33MOGAS (GAL)1400$3.42$1,368.00FPCON FUEL REQUIREMENTS
34DIESEL (GAL)1420$3.42$1,436.40FPCON FUEL REQUIREMENTS
35DIESEL (GAL)110,000$3.42$34,200.00Delivered as directed by the COR. DELIVERIES WILL BE MADE VIA HOSE FROM TRUCK TO FUEL BDAs
RENTAL EQUIPTMENTDAYSQTYTOTAL
36Security Barriers, pedestrain, size 3' length9200$5.18$9,324.00Length is in Feet
37Canopies (15' x 15') free standing92$86.25$1,552.50
38Chairs , plastic, stacking or folding9300$0.81$2,187.00
39Tables, 6ft Folding960$4.03$2,176.20
40Portable warehouse fan94$8.51$306.367,500-10,000 CFM
41Portable Pedastal Oscillating fan930$5.51$1,487.70
42Rental Generators (3kw)/With Fuel96$30.25$1,633.50NOT TO EXCEED 50 DBS
43Rental Generators (10kw)/With Fuel92$40.25$724.50120V
44Rental Generators (20kw)/With Fuel91$60.25$542.25240-120V
45Night Security Lighting gas powered w/fuel910$120.75$10,867.5012 hours of use. Fueled Daily.
CONSTRUCTIONDAYSQUANTITYU/POM&N TotalCOMMENTS
57Classroom Cleaning112$100.00$1,200.00Clean/Sanitize Classrooms
58Scrap and Level11$2,000.00$2,000.00Aprox 1 acres
59Walkway, Temporary11$5,000.00$5,000.00230 Ft Walkway Setup
60Chain Link Fence, Temporary11$1,500.00$1,500.00100 Ft Temporary Chain Link Fence
SITE TOTAL$117,490.33