ATTACH_2_CONT_PERFORM_EVAL_RATING_SH.docx

DOCX document 17 KB Posted

Attached to
Hardware/software
Solicitation number
N68836-14-R-0005
Issued by

About this file

Contractor Performance Eval Sheet

View the file

Other files

File Type Posted
N68836-14-R-0005_AMENDMENT_0001.pdf PDF
ATTACH_1_CONT_PERFORM_DATA_SH.docx DOCX document
N68836-14-R-0005.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR PERFORMANCE EVALUATION SURVEY RATING SHEET

Contractor: _______________________

RATING SCALE

Please use the following ratings to answer the questions. If you are unable to rate an item because it was not a requirement, never an issue, or you have no knowledge of the item in question, then you should mark “NA”.

EVALUATION CRITERIA

Acceptable - The Company’s performance was satisfactory and you would consider doing business with them again. There were minor performance problems, which were satisfactorily corrected.

In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can reasonably be assigned, the Offeror may not be evaluated favorably or unfavorably on past performance.

Therefore, the Offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.

Unacceptable - The Company’s performance was entirely unsatisfactory and you would not do business with them again under any circumstances. There were serious performance issues with the contractor for which the contractor’s corrective actions were ineffective.

NOTE: For statements indicating “Unacceptable” please provide an explanation in the comments section of the survey.

Acceptable

Unacceptable

A. QUALITY OF PRODUCT OR SERVICE:

(1) The Contractor provided a product or service that conformed to contract requirements, specifications, and standards of good workmanship.

(2) The Contractor submitted accurate reports.

(3) The Contractor utilized personnel that were appropriate to the effort performed.

B. COST CONTROL:

(1) The Contractor performed the effort within the estimated cost/price.

(2) The Contractor submitted accurate invoices on a timely basis.

(3) The Contractor demonstrated cost efficiencies in performing the required effort.

(4) The actual costs/rates realized closely reflected the negotiated costs/rates.

C. SCHEDULE:

(1) The tasks required under this effort were performed in a timely manner and in accordance with the period of performance of the contract.

(2) The Contractor was responsive to technical and/or contractual direction.

D. BUSINESS RELATIONSHIPS:

(1) The Contractor demonstrated effective management over the effort performed.

(2) The Contractor maintained an open line of communication so that the Contracting Officer’s Representative (COR) and/or Technical Point of Contact (TPOC) were apprised of technical, cost, and schedule issues.

(3) The Contractor presented information and correspondence in a clear, concise, and businesslike manner.

(4) The Contractor promptly notified the COR, TPOC, and/or Contracting Officer in a timely manner regarding urgent issues.

(5) The Contractor cooperated with the Government in providing flexible, proactive, and effective recommended solutions to critical program issues.

(6) The Contractor made timely award to, and demonstrated effective management of, its subcontractors.

(7) The Contractor demonstrated an effective small/small disadvantaged business subcontracting program.

E. CUSTOMER SATISFACTION:

(1) The products/services provided adequately met the needs of the program.

(2) The Contractor was able to perform with minimal or no direction from the COR or the TPOC.

(3) I am satisfied with the performance of the Contractor under this effort.

F. KEY PERSONNEL:

(1) The labor turnover in key personnel labor categories was minimal and did not adversely affect Contractor performance.

(2) The Contractor proposed qualified personnel to fulfill the requirements of the contract.

G. OTHER:

(1) Would you award this firm another contract? ( ) Yes ( ) No If you answered “No” provide an explanation.______________________________________________________________________

(2) Was the contract terminated for default? ( ) Yes ( ) No

If you answered “Yes”, provide an explanation. ___________________________________________

ATTACHMENT 2

SOLICITATION #: N68836-13-R-0102

File details come from the government source that posted it. Updated .