This is an amendment (U0001) to solicitation N6852025Q0007 that extends the response due date from January 6, 2025 to January 8, 2025 and adds paragraph 3.4 to the Statement of Work. The amendment is issued by the COMFRC Procurement Group at Patuxent River, MD.
The underlying solicitation requires off-site abrasive blast cleaning and painting services for twelve Jet-Blast Deflector panels from the USS Theodore Roosevelt (CVN71). Each panel measures 14ft x 6ft x 1ft and weighs 2,100 lbs. The work includes aluminum oxide blasting, flame spraying sides with aluminum coating, applying METCO sealant, priming with Formula 150, painting with Formula 152 White (minimum 2 coats), and adding caution stripes. The government will deliver/pickup within 85 miles of FRC Southwest; beyond that radius the contractor is responsible for transportation. The contractor must provide a 12-month warranty and submit detailed Field Summary Reports and Certificate of Completion documentation. Technical oversight is provided by FRC Southwest personnel in San Diego.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N6852025Q0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 06-Jan-2025 05:00 PM to 08-Jan-2025 05:00 PM.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
STATEMENT OF WORK
STATEMENT OF WORK
Abrasive Blast and Painting of Twelve (12) Jet-Blast Deflector (JBD) Panels
1. SCOPE:
1.1 This Statement of work (SOW) identifies necessary supplies and services to establish off-site services of
Government-owned assets, at Fleet Readiness Center Southwest (FRCSW), Naval Air Station (NAS) North Island P.O. Box 357058, San Diego, CA 92135-7058.
1.2 The requested services are to refurbish twelve (12), Jet-Blast Deflector (JBD) Panel Assemblies, which are coming from the USS Theodore Roosevelt CVN71. The dimensions of each panel are (14ftx6ftx1ft) and weight (2100 lbs).
2 APPLICABLE DOCUMENTS:
2.1 COMNAVAIRFORINST 4790.2B Naval Aviation Maintenance Program
2.2 General Service Bulletin No. 8, Revision P Visual Landing Aids
2.3 Material and Process Requirement (MPR) 1223 Abrasive Blast Preparations
2.4 Material and Process Requirement (MPR) 1233 Abrasive Blast Preparations
2.5 Material and Process Requirement (MPR) 1222 Flame Spray Aluminum
2.6 Material and Process Requirement (MPR) 1221-32 Epoxy Paint Finish
2.7 NAVAIR Drawing 617018
2.8 NAVAIR Drawing 616845
3 GENERAL REQUIREMENTS:
3.1 The Contractor must have full knowledge of the referenced equipment, must be able to perform all work in-compliance with paragraph 2 in accordance with this SOW.
3.2 The FRCSW Technical Point of Contact (TPOC) is the only Government employee, in addition to the Contracting Officer, Contract Specialist or Purchasing Agent at Commander, Fleet Readiness Center (COMFRC), who is authorized to discuss details of the contract. Any changes made by someone other than the Contracting Officer are not considered legally binding on the government.
3.3 The Government will deliver and pick up the GFP within an 85-mile radius of FRC Southwest. Outside of that radius, the Contractor is responsible for pickup and delivery back to FRC Southwest.
3.4 Upon delivery of the GFP to contractor, it is the contractor’s responsibility to move and maneuver the panel however they need, to accomplish blast and paint.
4 SPECIFIC REQUIRMENTS: .
4.1 Aluminum Oxide Blast all surfaces:
As per document listed in paragraph 2.3, the inspection and/or identification of components for wear and cracks, flame spraying of the sides with an approved aluminum coating (per paragraph 2.5) and painting as specified in MPR 1221-32.
4.2 Upon completion of abrasive blasting operations, the Contractor shall contact the TPOC to request scheduling of an inspection at the Contractor’s facility.
4.3 Flame Spray Long Sides
4.4 Coat Wire Spray sides with METCO Sealant (per paragraph 2.6)
4.5 Prime all surfaces of jet-blast doors with Formula 150 (per paragraph 2.6)
4.6 Paint all surfaces, with the exception of the Side Plate Cut-Outs (P/N: 626145) and the top surface of the door, with minimum of two (2) coats of Formula 152 White (per paragraph 2.6)
4.7 Per instructions from VRT Paint caution stripes on the edges (Per Service Bulletin No.8 Revision P). (per paragraph 2.2)
4.8 Upon completion of the contract effort, the Contractor shall notify the TPOC and arrange for Government pick-up of all GFP previously delivered to the contractor’s facility, by the Government.
5 INSPECTION AND ACCEPTANCE:
5.1 Inspection
5.1.1 The TPOC shall inspect the jet-blast panels at the contractor facility after all paint has been removed, and prior to final paint to ensure compliance.
5.1.2 The Government has the right to reject defective supplies or services within a reasonable time following delivery by written notification to the Contractor.
5.1.3 In such event, the Contractor shall replace, correct or repair the rejected supplies or services at the Contractor’s expense.
5.2 Acceptance
5.2.1 Upon completion of services, the Contractor shall provide the TPOC with a detailed Field
Summary Report (FSR) identifying the date and time of receipt of the JBD panels, date and time of completion of the work performed. The report shall also include the name of the technician(s) who performed the services, the date(s) the services were provided, model and serial numbers of all the equipment serviced, replaced and/or installed, a detailed report of the work performed. Any discrepancies should be noted along with a list of parts and/or services suggested to return, or keep the equipment fully operational.
5.2.2 An electronic copy of the FSR shall be provided to the TPOC via email within seven (7) days of completing service. (CDRL A001)
5.2.3 The Contractor shall provide the TPOC a Certificate of Completion (COC). The COC shall function as the Government’s inspection and acceptance (I/A) document.
(CDRL A002)
6 WARRANTY:
6.1 The Contractor shall provide the Government with a standard commercial warranty for a minimum period of twelve (12) months after the Period of Performance for the requested services.
7 SPECIAL REQUIREMENTS:
7.1 Technical Points-of-Contact:
7.1.1 Joseph Marasigan, (619) 545-7328, joseph.marasigan2.civ.@us.navy.mil
7.1.2 Julius Velas, (619) 545-9792, Julius.v.velas.civ@us.navy.mil
(End of Summary of Changes)