Statement of Work_Bronze Material 8.30_UPDATED.pdf

PDF 181 KB Posted

Attached to
Bronze Raw Material
Solicitation number
N68335-23-R-0269
Issued by

View the file

Other files

File Type Posted
Bronze Material_Proposal Spreadsheet_UPDATED 8.31.xlsx XLSX spreadsheet
Bronze Material_Proposal Spreadsheet.xlsx XLSX spreadsheet
Statement of Work_Bronze Material_post.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Bronze Raw Material

SCOPE

This Statement of Work (SOW) is for the Firm Fixed Price procurement for raw material for the MOD 4 Sheave Damper Packing project. The following are applicable material specifications and sizes.

1.0 MATERIAL INFORMATION

PART NUMBER DESCRIPTION QUANTITY

ASTM B271, C86300. Alternate material;

ASTM B138/B138M, C67000, H02 (PN-

3491AS0717-2)

11.13” outer diameter,4.88” inner diameter x 4.69” length

ASTM B505/B505M, Alloy, C86300 or ASTM B271/ 271M. Alloy, C86300 or Alternate Material; ASTM B138/138M, Alloy, C67000, H02 (PN-3491AS0712-5)

9.80” outer diameter, 5.31” inner diameter x 7.99” length

P/N C87890-27, ASTM B271, C95200 5.008” inside diameter + 0.002” – 0.000”, 5.992” outside diameter + 0.000” - 0.002”, 0.500” thickness +/-

0.010”

P/N 320537-17, ASTM B271, C95200 5.020” inside diameter +.005”

– 0.000”, 5.980” outside diameter + 0.000” – 0.005, .406” thickness +/- 0.015”

(ALL QUESTIONS ARE TO BE SUBMITTED VIA SAM.GOV – NO

EXCEPTIONS!)

2.0 REQUIREMENTS

2.1 General

The Contractor shall manufacture and deliver the required parts in accordance with this SOW, and the requirements of the contract.

2.2 Certificate of Conformance

The Contractor shall provide a Certificate of Quality Compliance and material certifications are required. This should include chemical and mechanical properties.

- Material and original mill certifications are required and must be in English.

- Mill markings must be clearly visible on material when received.

- Material must be DFARS compliant.

- Material must meet these specifications.

After machining and fabrication of the stock material by the Prototype and Manufacturing Division, the final shape / part must pass inspection criteria as described below for each line item or part number.

- P/N – 3491AS0712-5 and 3491AS0717-2 o Each finished part shall be 100% dye penetrant inspected in accordance with ASTM E1417 / E1417M, Type 1, Method A, Sensitivity, Level 6. Parts must meet the Class 1 Linear and Non-Linear requirement of MIL-STD-6035 whether made from a cast or wrought material. Finish: 250 RMS and +/- 0.03” all over.

- P/N- C87890-27 o Each finished casting shall be 100% penetrant inspected in accordance with

ASME E1417, type 1, Method A sensitivity Level 2. Parts must meet the Class 1 non-linear requirements and the class 1 linear requirements of MIL-STD-2035

- P/N- 320537-17 o Finish requirement of 125√ o Each finished casting shall be 100% penetrant inspected in accordance with

ASME E1417, type 1, Method A, sensitivity level 2. Parts must meet the class 2 non-linear requirements and the class 2 linear requirements of MIL-STD-2035

2.3 Quality Assurance

The Contractor shall have in place a production quality assurance (QA) system. This QA system shall be able to ensure that manufactured configuration items are built to print, functional, and reliably made IAW controlling technical drawings, specifications and standards. Each item manufactured as part of this contract shall have passed a Government final inspection prior to acceptance of the DD-250.

2.4 Government Inspection and Acceptance

Government Inspection and Acceptance of all production units shall be accomplished at

DESTINATION.

3.0 PACKAGING, PRESERVATION AND SHIPPING

Packaging and preservation for shipping shall be in accordance with best commercial practices.

Shipments shall be packaged individually and transported (FOB Destination) via safe, secure, reliable, and traceable means of transportation and provide protection from normal climatic/weather conditions and incidental mishandling during shipping to prevent any damage or loss during shipment. All shipments under this contract shall be addressed to the NAVAIR Lakehurst as indicated below:

Naval Air Warfare Center, Aircraft Division Highway Route 547 Building 148 MCC1

ATTN: TPOC

Joint Base MDL, New Jersey 08733

**No Friday, Saturday or Sunday Deliveries or after 1500 Monday through Thursday**

All exterior shipping containers/packaging shall at a minimum be marked with the following information:

Part Number; Nomenclature; Quantity; Contract Number.

Delivery date is 90 days after contract

*Early and partial deliveries are acceptable.

4.0 POINTS OF CONTACT

Technical Point of Contact: TBD

File details come from the government source that posted it. Updated .