L_and_M_CA-1_-_Proposal_PWBS_with_CLIN_Hours_and_Prices_20190507.xlsx
XLSX spreadsheet 53 KB Posted
- Attached to
- Consolidated Automated Support System (CASS) Fourth Generation Electro-Optics (EO4) Subsystem
- Solicitation number
- N68335-19-R-0063
About this file
PWBS with Pricing
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CA-2_Historical_and_Forecasted_Indirect_Rates.xlsx | XLSX spreadsheet | |
| L_and_M_TA-2_-_Proposal_PWBS_with_Hours__20190507.xlsx | XLSX spreadsheet | |
| DRAFT_Solicitation_N68335-19-R-0063.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTRUCTIONS
Instructions for completing this CA-1 Cost Attachment worksheet
| WBS HOURS AND PRICES TAB |
| Instruction: Fill in yellow cells with hours and prices |
| If you decide to use the fields marked "other," provide Statement of Work (SOW) and Contractor Work Breakdown Structure (CWBS) identification |
| Hours and prices in the gray cells are pre-filled. Do not adjust these numbers. |
| Additional rows within WBS levels may be added if necessary. Include SOW and CWBS identification as a cross reference |
| CLIN HOURS AND PRICES TAB |
| CLIN hours and prices populate automatically from the WBS Hours and Prices Tab. Do not adjust the formulas in this worksheet unless changes to the WBS Hours and Prices Tab require it. |
| There is an error catch that will alert a discrepancy and turn RED if the hours and price totals do not match the ones on the WBS Prices Tab |
| When the totals on the WBS and CLIN tabs are in agreement, the error catch returns a sum of zero and turns GREEN. |
| Additional pricing detail may be provided at lower levels. Please include lower level detail on a separate tab. Links from supplementary data to the WBS Hours and Prices tab are allowed and encouraged. Retain formulas in cells so that mathematical logic may be followed. |
| BOE SAMPLE WORKSHEET |
| This worsheet is an example of the level of cost substantiation required to support the assigned hours and prices. |
WBS HOURS AND PRICES
| EO4 Development Product Work Breakdown Structure (PWBS) | |||||||
| CLIN ALIGNMENT | PWBS # | SOW PARAGRAPH | Level 1 | Level 2 | Level 3 | TOTAL HOURS | TOTAL PRICE |
| eCASS EO4 Development Grand Total | 4000 | $ 130,000.00 | |||||
| 0001 | 1.0 | 1.1 | EMD Labor (NonRecurring) | ||||
| 0001 | 1.1 | 3.1 | Management | ||||
| 1.1.1 | 3.1.1, 3.1.17 | Program Management | 0 | $ - 0 | |||
| 1.1.2 | 3.1.1 | Finance Management | 0 | $ - 0 | |||
| 1.1.3 | 3.1.1 | Contract Management | 0 | $ - 0 | |||
| 1.1.4 | 3.1.2, 3.1.14 | Subcontract Management | 0 | $ - 0 | |||
| 1.1.5 | 3.1.3, 3.4.3 | Configuration Management | 0 | $ - 0 | |||
| 1.1.6 | 3.1.20, 3.3.4 | Data Management | 0 | $ - 0 | |||
| 1.1.7 | 3.1.1, 3.1.9, 3.10, 3.1.13, 3, 3.2.1 | Engineering Management | 0 | $ - 0 | |||
| 1.1.8 | 3.1.1, 3.1.12, 3.4.2 | Logistics Management | 0 | $ - 0 | |||
| 1.1.9 | 3.1.8 | Risk/Opportunity Management | 0 | $ - 0 | |||
| 1.1.10 | 3.11 | Quality Assurance | 0 | $ - 0 | |||
| 1.1.11 | (enter SOW and CWBS identifiers) | Other (Specify) | 0 | $ - 0 | |||
| 0001 | 1.2 | Reviews/Meetings | |||||
| 1.2.1 | 3.1.16, 3.2.2 | Engineering Reviews/Meetings | 0 | $ - 0 | |||
| 1.2.2 | 3.1.16 | Program Reviews/Meetings | 0 | $ - 0 | |||
| 1.2.3 | 3.1.16 | Logistics Reviews/Meetings | 0 | $ - 0 | |||
| 1.2.4 | (enter SOW and CWBS identifiers) | Other (Specify) | 0 | $ - 0 | |||
| 0001 | 1.3 | 3.2.3.3, 3.2.3.4, 3.2.3.5, 3.2.3.6, 3.2.3.7, 3.2.3.8, 3.2.3.9, except data rights | Hardware Development | 0 | $ - 0 | ||
| 0001 | 1.4 | 3.2.4, except 3.2.4.13 and data rights | Software Development | 0 | $ - 0 | ||
| 0001 | 1.5 | Integration, Pre-Test & Checkout | |||||
| 1.5.1 | 3.2.3.2, 3.2.8 | interoperability with eCASS | EO4 Hardware Integration | 0 | $ - 0 | ||
| 1.5.2 | 3.2.5 | this is the whole OTPS compatibility section | EO4 Software Integration | 0 | $ - 0 | ||
| 1.5.3 | (enter SOW and CWBS identifiers) | Other EO4 Integration (Specify) | 0 | $ - 0 | |||
| 0001 | 1.6 | Test Events | |||||
| 1.6.1 | 3.3.5.1, 3.3.5.2, 3.3.5.3, 3.3.5.4, 3.3.5.5, 3,3,5,6 | DT-B1 Phase 1 (DVT) | 0 | $ - 0 | |||
| 1.6.2 | 3.3.5.7 | DT-B1 Phase 2 (Environmental) | 0 | $ - 0 | |||
| 1.6.3 | 3.3.5.8 | DT-B1 Phase 3 (Support for Govt Test) | 0 | $ - 0 | |||
| 1.6.4 | (enter SOW and CWBS identifiers) | Other System Test & Evaluation (Specify) | 0 | $ - 0 | |||
| 0001 | 1.7 | Logistics | |||||
| 1.7.1 | 3.4.1, 3.4.4, 3.4.7 | General Logistics | 0 | $ - 0 | |||
| 1.7.2 | 3.4.10 | Technical Manuals | 0 | $ - 0 | |||
| 1.7.3 | 3.4.11 | Training | 0 | $ - 0 | |||
| 1.7.4 | (enter SOW and CWBS identifiers) | Other (Specify) | 0 | $ - 0 | |||
| 0001 | 1.8 | Data (Delivered on CLIN 0009) | |||||
| 1.8.1 | 3.1.4, 3.1.5, 3.1.7, 3.1.18, 3.1.19.1, 3.1.20.1, 3.1.20.4, 3.1.22, 3.2.5.1, 3.4.3.3 | Admin/Management Data CDRLs A001-A00A (Except for EVM CDRL A004) | 0 | $ - 0 | |||
| 1.8.2 | 3.2.3.9, 3.2.5.1, 3.2.7.6, 3.2.8, 3.4.3.4 | Engineering Data CDRLs B001-B00S (Except for TDP CDRL B00H) | 0 | $ - 0 | |||
| 1.8.3 | 3.2.6.2 | Techical Data Package (TDP) Data CDRL B00H | 0 | $ - 0 | |||
| 1.8.4 | 3.1.1, 3.3.5, 3.4.3.4, | Test Data CDRLs C001-C003 | 0 | $ - 0 | |||
| 1.8.5 | 3.4.3.1, 3.4.3.2, 3.4.4.3, 3.4.5, 3.4.6, 3.4.7.1, 3.4.7.2, 3.4.8, 3.4.9 | Logistics Data CDRLs D001-D009 | 0 | $ - 0 | |||
| 1.8.6 | 3.4.10 | Technical Manual Data CDRLs E001-E005 | 0 | $ - 0 | |||
| 1.8.7 | 3.4.11 | Training Data CDRLs F001-F005 | 0 | $ - 0 | |||
| 1.8.8 | 3.1.20.2, 3.2.3.1, 3.3.3 | Independent Data Environment (IDE) Repository System/Hardware/Tools | 0 | $ - 0 | |||
| 1.8.9 | 3.2.4.12 | Data Rights (Specify) | 0 | $ - 0 | |||
| 1.8.10 | (enter SOW and CWBS identifiers) | Other Data (Specify) | 0 | $ - 0 | |||
| 0001 | 1.9 | Maintenance & Support | |||||
| 1.9.1 | 3.1.15 | Repair/calibration and maintenance of GFP (host eCASS, etc) | 0 | $ - 0 | |||
| 1.9.2 | 3.1.21, 3.2.7 | Repair/calibration and maintenance of EDM EO4 Subsystems | 0 | $ - 0 | |||
| 1.9.3 | (enter SOW and CWBS identifiers) | Other (Specify) | 0 | $ - 0 | |||
| 0001 | 1.10 | EO4 Principal Subcontractors | |||||
| 1.10.1 | (enter SOW and CWBS identifiers) | Principal Subcontractor #1 | 0 | $ - 0 | |||
| 1.10.2 | (enter SOW and CWBS identifiers) | Principal Subcontractor #2 | 0 | $ - 0 | |||
| 1.10.3 | (enter SOW and CWBS identifiers) | Principal Subcontractor #3 | 0 | $ - 0 | |||
| 1.10.4 | (enter SOW and CWBS identifiers) | (etc.) | 0 | $ - 0 | |||
| 0002 | 2.0 | EO Subsystems (Recurring) | |||||
| 2.1 | 1.2 | Console Hardware | 0 | $ - 0 | |||
| 2.1 | 1.2 | Console Software | 0 | $ - 0 | |||
| 2.1 | 1.2 | Console Assembly/Build | 0 | $ - 0 | |||
| 2.1 | 1.2 | Console Test (PAT/PRAT) | 0 | $ - 0 | |||
| 2.1 | 1.3 | EO Cart | 0 | $ - 0 | |||
| 2.1 | 1.4 | EO Install Kits | 0 | $ - 0 | |||
| 2.1 | (enter SOW and CWBS identifiers) | Other (Specify) | 0 | $ - 0 | |||
| 0003 | 3.0 | 1.5 | SMAT/CAL OTPS Mod Kits (Recurring) | 0 | $ - 0 | ||
| 0004 | 4.0 | 1.6 | Spares Kits | 0 | $ - 0 | ||
| 0005 | 5.0 | 1.7, 3.1.6 | Earned Value Management (EVM) | (Includes EVM CDRL A004) | 0 | $ - 0 | |
| 0006 | 6.0 | 1.8, 3.5 | Engineering and Logistics Support Labor | 4000 | $ - 0 | ||
| 0007 | 7.0 | 1.9, 3.5 | Engineering and Logistics Support Material | 0 | $ 100,000.00 | ||
| 0008 | 8.0 | 1.10, 3.5 | Engineering and Logistics Support Travel | 0 | $ 30,000.00 | ||
| 0009 | 9.0 | 1.11 | Data (NSP) | NSP | $ - 0 |
CLIN SUMMARY
| CLIN | CLIN DESCRIPTION | TOTAL HOURS | TOTAL PRICE | |
| 0001 | EMD NRE | 0 | $ - 0 | |
| 0002 | EO Consoles, Carts and Install Kits | 0 | $ - 0 | |
| 0003 | SMAT/CAL OTPS Upgrade Kits | 0 | $ - 0 | |
| 0004 | Spares Kits | 0 | $ - 0 | |
| 0005 | Earned Value Management (EVM) | 0 | $ - 0 | |
| 0006 | Engineering and Logistics Support Labor | 4000 | $ - 0 | |
| 0007 | Engineering and Logistics Support Material | 0 | $ 100,000.00 | |
| 0008 | Engineering and Logistics Support Travel | 0 | $ 30,000.00 | |
| 0009 | Data (***Not Separately Priced***) | NSP | $ - 0 | |
| Total | 4000 | $ 130,000.00 | ||
| Error Catch | 0 | $ - 0 | (Green is good, red is bad) |
BOE SAMPLE
| SECTION L COST ATTACHMENT 3 |
| COST SUBSTANTIATION (BOE) - Sample |
| CWBS #______ Note: Include WBS at the lowest level at which your estimate was developed.____________ | ||||||||||||||
| 1. PROGRAM | ||||||||||||||
| LABOR / MATERIAL | COST ESTIMATE TY$ | ANALOGOUS COST TY$ | ||||||||||||
| BREAKOUT | A | B | C | D | E | F | G | H | ||||||
| 1921-1 | Contractor | Contractor | Contractor | Subcontractor | Subcontractor | Subcontractor | 1921-1 | Contractor | Contractor | Contractor | Subcontractor | Subcontractor | Subcontractor | |
| Category | Labor Hours | Labor Cost | Mat'l Cost | Labor Hours | Labor Cost | Mat'l Cost | Category | Labor Hours | Labor Cost | Mat'l Cost | Labor Hours | Labor Cost | Mat'l Cost | |
| Nonrecurring |
Recurring
| TOTAL | ||
| TOTAL COST ESTIMATE (TY$) A+B+C+D | TOTAL COST ANALOGOUS EFFORT (TY$) E+F+G+H |
DESCRIPTION OF WORK CONTENT / TECHNICAL PARAMETERS DESCRIPTION OF DIFFERENCES IN WORK CONTENT
ESTIMATE BASE - (Analogous program) BASE COST TY$ ADJUSTMENTS / CALCULATIONS ADJUSTMENTS COST TY$ TOTAL COST ESTIMATE (TY$)
DESCRIPTION OF ESTIMATE BASE / PROCESS DESCRIPTION OF ADJUSTMENTS / CALCULATIONS OTHER (IF NECESSARY)
SECTION L COST ATTACHMENT 4