CDRLs.docx
DOCX document 43 KB Posted
- Attached to
- Bend-Over Sheave Wire Rope Fatigue Testing Federal contract opportunity
- Solicitation number
- N68335-19-R-0058
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Statement_of_Work.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
FORM APPROVED
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Office for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. Exhibit |
B
| C. Category: | ||
| TDP ___ | TM ___ | Other Mgmt Data |
D. SYSTEM ITEM
Wire Rope Fatigue Samples
E. CONTRACTOR/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM
A001
2. TITLE OF DATA ITEM
Qualification Test Report (QTR)
3. SUBTITLE
QTR
4. AUTHORITY (Data Acquisition Document No.)
DI-QCIC-81890
5. CONTRACT REFERENCE
ENGINEERING SOW
6. REQUIRING OFFICE
NAVAIR LKE
7. DD 250 REQ
DD
9. DIST STATEMENT
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
See Block 16
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
AD
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION
See Block 16
| Draft |
| Final |
| Reg |
| Repr |
16. REMARKS
Block 4: Contractor format acceptable, DID provided for guidance only. MS Office 2016 format preferred. The QTR shall contain the following:
1. Contract number
2. Full description of demonstration procedures, time and date
3. 2BOSWRT operator name(s)
4. Detailed demonstration and validation of the following:
· Inspection of the 2BOSWRT
· Installation of WRFS
· Bi-directional cycling of the WRFS
· Display of maximum cable tension within required tolerance
· Display of maximum cable temperature under maximum allowance
Block 8: Approval and distribution statement required.
Block 9: Distribution authorized to the Department of Defense and U.S. DoD contractors only; “Critical Technology”; to protect information subject to the provisions of DoD 5230.25. Other requests for this document shall be referred to Naval Air Warfare Center, Aircraft Division Lakehurst, NJ 08733
Block 12/13: The contractor shall submit one (1) electronic draft NLT 10 days after the Test Readiness & Demonstration Review (TRDR). The Navy will review the technical content and return comments (if required) NLT than 10 days after receipt. Final electronic submission shall be made NLT 5 working days after comments are returned.
Block 14: All draft and final copies shall be sent electronically to:
LKE ENG 4811:
LKE ENG 4822:
LKE PM 13392:
| PCO |
| 0 |
| 1 |
| 1 |
| DCMA/ACO |
| 0 |
| 0 |
| 0 |
| LKE ENG 4811 |
| 1 |
| 0 |
| 1 |
| LKE ENG 4822 |
| 1 |
| 0 |
| 1 |
LKE PM
13392
| 1 |
| 0 |
| 1 |
| 15. Total |
| 3 |
| 1 |
| 4 |
G. PREPARED BY
H. DATE
9 August 2018
I. APPROVED BY
J. DATE
11 December 2018
DD FORM 1423, AUG 96 Previous Edition May be Used. Page 1 of 1 Pages
FORM APPROVED
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Office for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. Exhibit |
B
| C. Category: | ||
| TDP ___ | TM ___ | Other Mgmt Data |
D. SYSTEM ITEM
| E. CONTRACTOR/PR NO. |
| F. CONTRACTOR |
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Wire Rope Fatigue Sample Test Data
3. SUBTITLE
WRFS Report
| 4. AUTHORITY (Data Acquisition Document No.) |
| DI-QCIC-81536A |
5. CONTRACT REFERENCE
ENGINEERING SOW
6. REQUIRING OFFICE
NAVAIR LKE
7. DD 250 REQ
DD
9. DIST STATEMENT
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
AD
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION
See Block 16
| Draft |
| Final |
| Reg |
| Repr |
16. REMARKS
Block 4: Contractor format acceptable, DID provided for guidance only. MS Office 2016 format preferred. A single test report shall be compiled for all fatigued samples. At a minimum, the test report data shall include the following for each sample:
1. Sample ID
2. Date and time sample was installed on the 2BOSWRT
3. Date and time sample was removed from 2BOSWRT
4. Recorded number of fatigue cycles at failure
5. Monitored tension measurements
6. Monitored temperature measurements
Block 8: Approval and distribution statement required.
Block 9: Distribution authorized to the Department of Defense and U.S. DoD contractors only; “Critical Technology”; to protect information subject to the provisions of DoD 5230.25. Other requests for this document shall be referred to Naval Air Warfare Center, Aircraft Division Lakehurst, NJ 08733
Block 12/13: The contractor shall submit one (1) electronic copy NLT 10 days after completion of all fatigue testing of the GFM provided wire rope samples. The Navy will review the technical content and return comments (if required) NLT than 10 days after receipt.
Block 14: All draft and final copies shall be sent electronically to:
LKE ENG 4811:
LKE ENG 4822:
LKE PM 13392:
| PCO |
| 0 |
| 1 |
| 1 |
| DCMA/ACO |
| 0 |
| 0 |
| 0 |
| LKE ENG 4811 |
| 1 |
| 0 |
| 1 |
| LKE ENG 4822 |
| 1 |
| 0 |
| 1 |
LKE PM
| 1 |
| 1 |
| 0 |
| 15. TOTAL |
| 3 |
| 2 |
| 3 |
G. PREPARED BY
H. DATE
9 August 2018
I. APPROVED BY
J. DATE
DD FORM 1423, AUG 96 Previous Edition May be Used. Page 1 of 1 Pages
FORM APPROVED
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Office for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. Exhibit |
B
| C. Category: | ||
| TDP ___ | TM ___ | Other Mgmt Data |
D. SYSTEM ITEM
| E. CONTRACTOR/PR NO. |
| F. CONTRACTOR |
1. DATA ITEM
A003
2. TITLE OF DATA ITEM
Wire Rope Fatigue Samples
3. SUBTITLE
Fatigued Samples
4. AUTHORITY (Data Acquisition Document No.)
DI-PACK-80120C
5. CONTRACT REFERENCE
ENGINEERING SOW
6. REQUIRING OFFICE
NAVAIR LKE
7. DD 250 REQ
SD
9. DIST STATEMENT
N/A
10. FREQUENCY
ONETIME
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
See Block 16
| Draft |
| Final |
| Reg |
| Repr |
16. REMARKS
Block 4: DID provided for guidance only. The contractor shall deliver each shortened wire rope fatigue samples to NAVAIR LKE. Samples shall be boxed and shipped in accordance with best commercial practice. The samples shall be shipped to the following address:
Naval Air Warfare Center Highway 547 Lakehurst NJ 08733-5035 Bldg. 148
Block 7: The packaged wire rope samples shall be inspected at the contractor’s facility by DCMA.
Block 8: The contractor shall return the 80 (eighty) wire rope samples that were fatigue tested on the 2BOSWRT.
Block 12: The contractor shall ship the wire rope samples NLT 10 working days after approval of the sample test data deliverable (A002).
Block 13: No subsequent submissions required
| PCO |
| 0 |
| 1 |
| 0 |
| DCMA/ACO |
| 0 |
| 1 |
| 0 |
| LKE ENG 4811 |
| 0 |
| 0 |
| 0 |
| LKE ENG 4822 |
| 0 |
| 0 |
| 0 |
| LKE ENG 4884 |
| 0 |
| 1 |
| 0 |
LKE PM
| 0 |
| 0 |
| 0 |
| 15. Total |
| 0 |
| 3 |
| 0 |
G. PREPARED BY
H. DATE
9 August 2018
I. APPROVED BY
J. DATE
DD FORM 1423, AUG 96 Previous Edition May be Used. Page 1 of 1 Pages
| Contract Data Requirements List | |
| Form Approved | |
| OMB No. 0704-0188 |
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.
A. Contract Line Item No.
B. Exhibit B
| C. Category: | ||
| TDP ___ | TM ___ | Other Mgmt Data |
D. System/Item Wire Rope Fatigue Samples E. Contract/PR No.
TBD
F. Contractor
TBD
1. Data Item No.
B001
2. Title Of Data Item
PAOC Meeting Minutes
3. Subtitle Meeting Minutes
4. Authority (Data Acquisition document no.)
DI-ADMN-81250A
5. Contract Reference
ENGINEERING SOW
6. Requiring Office
NAVAIR LKE
7. DD 250 REQ
DD
9. Dist Statement Requirement
D
10. Frequency
ONE/R
12. Date of First Submission
14. Distribution
| a. ADDRESSEE |
| b. COPIES |
8. APP Code
AD
11. As Of Date N/A
13. Date of Subsequent Submission See Block 16
| Draft |
| Final |
| Reg |
| Repro |
16. Remarks
Block 4: Contractor format acceptable, DID provided for guidance only. MS Office 2016 format preferred.
Block 8: Approval and distribution statement required.
Block 9: Distribution authorized to the Department of Defense and U.S. DoD contractors only; “Critical Technology”; to protect information subject to the provisions of DoD 5230.25. Other requests for this document shall be referred to Naval Air Warfare Center, Aircraft Division Lakehurst, NJ 08733
Block 12/13: The contractor shall submit one (1) electronic draft NLT 10 working days after the PAOC. The Navy will review and provide comment/corrections or concurrence within 5 working days after receipt. The contractor shall re-submit electronically for final approval.
Block 14: All draft and final copies shall be sent electronically to:
LKE ENG 4811:
LKE ENG 4822:
LKE PM 13392:
| PCO |
| 0 |
| 1 |
| 1 |
| DCMA/ACO |
| 0 |
| 0 |
| 0 |
| LKE ENG 4811 |
| 1 |
| 0 |
| 1 |
LKE PM
| 1 |
| 0 |
| 1 |
| 15. Total |
| 2 |
| 1 |
| 3 |
G. Prepared By
H. Date 9 August 2018 I. Approved By
J. Date
DD FORM 1423, AUG 96 Previous Edition May be Used. Page 1 of 1 Pages
File details come from the government source that posted it.