Statement of Work for

MQ-4C Tow Bar Adapter

9 November 2018

1.0 SCOPE

This Statement of Work (SOW) is for the procurement of the Tow Bar Adapters, part number (P/N)

3574AS350-1, for the MQ-4C Triton Unmanned Air Systems (UAS) Program.

This Tow Bar Adapter will mount to either the MD-1 (Air Force common aircraft tow bar) or ALBAR

(Navy/Marine Corps common aircraft tow bar) for towing the MQ-4C Triton. The Tow Bar Adapter is designed with the shear pin that will shear when the towing load limit exceeds pre-defined safety limits.

1.1 Applicable Documents:

a) MIL-STD-130N – Identification Marking of U.S. Military Property

b) Drawing #3909AS9999 Rev B, Identification Plate for Support Equipment/UID Markings

c) Drawing #3574AS350, Tow Bar Adapter

d) Drawing #3574AS351, Rear Plate

e) Drawing #3574AS352, Upright Plate Assy.

f) Drawing #3574AS353, Pin Hook Plate

g) Drawing #3574AS354, Hook Rod

h) Drawing #3574AS355, Pin Receptacle

i) Drawing #3574AS356, Clevis Assy.

j) Drawing #3574AS357, Clevis

k) Drawing #3574AS358, Slide Plate

l) Drawing #3574AS359, Shear Pin

2.0 REQUIREMENTS

2.1 General

Contractor shall manufacture and deliver Tow Bar Adapters in accordance with (IAW) this SOW, the

Government furnished drawing package and the requirements of the contract.

The program is requesting a Five-Year Indefinite Delivery/Indefinite Quantity (IDIQ) type contract.

P/N Description Base Yr.

Min. Qty.

Base Yr.

Max. Qty.

Year 2

Qty.

Year 3

Qty.

Year 4

Qty.

Year 5

Qty.

3574AS350-1 Tow Bar Adapter 3 5 6 6 6 5

Year 1 quantities are valid from date of award through 365 days.

Year 2 quantities are valid from date of award through 730 days.

Year 3 quantities are valid from date of award through 1095 days.

Year 4 quantities are valid from date of award through 1460 days.

Year 5 quantities are valid from date of award through 1825 days.

2.2 Proof Load Testing

Signed proof loading certificates that indicate Safe Working Load (SWL) and proof load shall be provided for every item ordered. The proof load tag shall indicate the SWL, proof load, and date the equipment was proof loaded. "SWL" shall be stamped before the SWL weight on the tag. The proof load shall be submitted on company letterhead and shall have the serial number documented for each item. Copies of the proof load certificates shall be shipped with each item by placing them in a plastic pouch/envelope and attaching them to each unit or by using a temporary fastening device such as a zip tie. The original copies of all Proof Load Certificates shall be provided to the procuring activity in accordance with (IAW) Contract Data Requirements List (CDRL) A001. The Government shall be given the opportunity to witness the proof load testing.

For each procurement, an additional sample of one (1) shear pin shall be provided for proof load testing of the shear pins which shall not count towards the production quantities.

Each Tow Bar Adapter shall be delivered fully assembled.

2.3 Certificate of Conformance

The Contractor shall provide a Certificate of Conformance (COC) with each Tow Bar Adapter certifying that it conforms to the government drawing package, this SOW, and the requirements of the contract.

The COC shall be on company letterhead and signed by management. Each COC shall identify the part number and serial number. If any items are found to be non-conforming, they shall be replaced at the

Contractor's expense. Electronic copies of each COC shall also be sent to technical point of contact;

2.4 Quality Assurance

The QA system shall be able to ensure that manufactured configuration items are built to print, functional, and reliably made in accordance with controlling technical drawings, specifications and standards. Each item manufactured as part of this contract shall have passed a Government final inspection prior to DD-250.

2.5 Government Inspection and Acceptance

Government Inspection and Acceptance of all production units shall be accomplished at the source by representatives of Defense Contract Management Agency (DCMA).

2.6 Item Unique Identification (IUID) Marking of US Military Property

In accordance with DFARS Clause 252.211-7003 Item Identification and valuation, the Contractor is required to mark and register all end items and their components meeting the requirements called out in

MIL-STD-130N. These include components for which the Governments unit acquisition cost is $5,000 or greater, or any component, subassembly or embedded part that is serially managed, mission essential or a controlled inventory item.

2.6.1 Construct and Method

Details on creating the UID and the marking method are contained in MIL-STD-130N. The UID may be either UID Construct #1 or Construct #2 with Construct #2 being the preferred method.

2.6.2 UID Location and Marking

The locations and marking methods selected should bear no impact on the performance of the part and minimal configuration change(s) to the part. The UID (including 2D Matrix) should be incorporated onto the data plate in accordance with Drawing 3909AS9999 Rev B (Identification Plate/UID Markings). If the

2D matrix can't be incorporated onto the data plate, a 2D matrix sticker can be applied onto the main data plate provided it can be done without covering any critical data. When the 2D Data Matrix is placed directly onto the data plate, the Part Number, Serial Number and CAGE human readable characters are not required. If the above cannot be accomplished, a separate data plate can be attached which contains the

2D Matrix plus the human readable characters for the Part Number, Serial Number and CAGE. This added data plate should be attached in close proximity to the main data plate.

2.6.3 Permanency and Legibility

The UID marking and identification plates, tags, or labels when used on equipment, parts, assemblies, subassemblies, units, sets, or groups shall be permanent during the normal life expectancy of the item and be capable of withstanding the environmental test and cleaning procedures specified for the item.

Legibility shall be as required for ready readability as per MIL-STD-130N.

2.6.4 UID Registration

The prime Contractor has the responsibility to furnish Item Unique Identification (IUID) data to the IUID registry. Data submission of IUID data and acquisition cost should be via Wide Area Work Flow

(WAWF), IUID XML file, IUID flat file or web entry. Additional information regarding data submission as well as the actual marking can be found at <http://www.acq.osd.mil/dpap/UID/>.

2.6.5 Records

The Contractor shall maintain an accurate, current list of UIDs for all manufactured items on this contract and supply to the Government upon request. The list shall include P/N, Serial #, CAGE, UID Location, Construct used, how it was marked and the registration method used.

3.0 PACKAGING, PRESERVATION AND SHIPPING

Packaging and preservation for shipping shall be IAW best commercial practices for long term preservation. Shipments shall be packaged and transported (FOB Destination) via safe, secure, reliable, and traceable means of transportation and provide protection from normal climatic/weather conditions and incidental mishandling during shipping to prevent any damage or loss during shipment. All shipments under this contract shall be addressed to the DLA Distribution Facility as indicated below:

Mechanicsburg Pa 17050-0789

Deliveries shall be made within three (3) months after order receipt.

All exterior shipping containers/packaging shall at a minimum be marked with the following information:

Part Number; Nomenclature; Quantity; Serial number(s); Contract Number; National Stock Number; and

Manufacturer’s Name, Address, and CAGE Code.

3.1 Shipping Document

The Contractor shall notify the Acquisition Point of Contact (POC) via email when the shipment is ready and to confirm the shipping address. Upon shipment, a copy of the shipping document shall be emailed to the Acquisition POC.

Note: Please request drawings by sending certified DD Form-2345 to email to

Vivian.diazhernandez@navy.mil Drawings will be sent via secured email system.