This is Amendment 0001 to Solicitation N6817127QN004, issued by NAVSUP FLC Sigonella Naples Office on October 28, 2026, with an effective date of October 28, 2026. The solicitation was originally dated October 19, 2026. The amendment does not extend the offer receipt deadline and requires offerors to acknowledge receipt of this amendment prior to the hour and date specified in the original solicitation or as amended. Acknowledgment must be made by completing items 8 and 15 and returning copies of the amendment, by acknowledging receipt on each copy of the offer submitted, or by separate letter or electronic communication referencing the solicitation and amendment numbers. Failure to acknowledge receipt at the designated place may result in rejection of the offer.

The amendment addresses Questions and Answers (Q&As) regarding Work Items 0502 and 0023 related to asbestos removal and hazardous waste handling. The key clarifications are: (1) contractors must not assume or price any baseline asbestos removal in their initial proposals for Item 0502, as no physical dimensions or quantities are provided at this time; (2) if asbestos is suspected or identified during pre-work inspection, the contractor must submit a Condition Found Report (CFR) to address cost, remediation, and disposal; and (3) all costs associated with asbestos removal, handling, transportation, and disposal must be excluded from the initial bid for Item 0502 and will be handled separately through the CFR and Change Order process under Item 0023. Inquiries should be directed to Juan Tapia at juan.c.tapia5.civ@us.navy.mil or 314-626-6408.

View the file

Other files

File Type Posted
J-2 Work Specification Package.pdf PDF
RFQ - N6817127QN004.pdf PDF
J-1 Pricing Breakdown.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Block 14 (Description of Amendment/Modification): The purpose of this amendment is to provide responses to industry questions. See below for Questions and Answers (Q&As).

Q&As Question 1. (For Work Item 0502) Asbestos Removal - Quantity and Scope We understand that the scope involves 16 pipe hangers across 8 locations, with asbestos-containing insulation to be removed using the glove-bag method. However, in order to estimate the quantity of asbestos-containing material to be removed and disposed of, we would appreciate more details on the following: a) What is the approximate length of asbestos-containing insulation to be removed at each pipe hanger?, b) What is the approximate thickness of the existing insulation?, and c) Is the asbestos removal limited to the 16 pipe hangers, or does it also include insulation on the adjacent piping?

Answer 1.

No initial action required. The contractor is not to assume or price any baseline asbestos removal for this scope. No physical dimensions or quantities are provided at this time, as asbestos removal is not part of the initial priced work. The contractor shall not include pricing for asbestos removal or remediation in their initial proposal for Item 0502. If asbestos is suspected or identified during the pre-work inspection, the contractor will submit a Condition Found Report (CFR) to address the cost, remediation, and disposal.

Question 2. (For Work Items 0502 & 0023) Asbestos Remediation and Disposal Costs - Contractual Clarification We note that Item 0502 specifies that asbestos remediation costs associated with the pipe hangers shall be charged to this work item. However, Item 0023 appears to provide for hazardous waste handling and disposal costs to be addressed through a Condition Found Report (CFR) and subsequent Change Order. Could you please clarify whether all asbestos removal, handling, transportation, and disposal costs must be included in the initial quotation for Item 0502, or whether any of these costs will be handled separately under Item 0023 through the CFR/Change Order process?

Answer 2.

Do not price asbestos in the initial quotation. All costs associated with asbestos removal, handling, transportation, and disposal must be excluded from the initial bid for Item 0502. Should asbestos-containing material be identified during the inspection, the contractor shall immediately document it and submit a CFR. Cost and remediation will be handled via the CFR and subsequent Change Order process under Item 0023. The contractor shall not include pricing for asbestos removal or remediation in their initial proposal for Item 0502. If asbestos is suspected or identified during the pre-work inspection, the contractor will submit a Condition Found Report (CFR) to address the cost, remediation, and disposal.

N6817127QN0040001

IDCode: J
Page: 1
Pages: 2
AmendNo: 0001
EffDate: 28 Oct 2026
ReqNo: See Continuation Sheet
ProjNo:
IssCode: N68171
AdmCode:
IssuedBy: NAVSUP FLC SIGONELLA NAPLES OFFICE

NAVAL REGIONAL CONTRACTING CEN DET, PSC 817 BOX 50

FPO, AE 09622-0050

UNITED STATES

Juan Tapia, Email: juan.c.tapia5.civ@us.navy.mil Telephone: 314-626-6408 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: N6817127QN004
SolDate: 19 Oct 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G - Contract Administration Data
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: See Schedule
ContNameTitle:
CoNameTitle: Antonella De Fraia Frangipane
ContDate:
CODate: 28 Oct 2026

File details come from the government source that posted it. Updated .