This document is a Performance Work Statement (PWS) for repairs and maintenance on the USS NEW YORK (LPD 21). The PWS covers a variety of repairs and services such as relief valve testing, insulation repair, pump and motor replacements, window wiper assembly replacement, and crane/rigging services. Key details include:

The work is to be performed under the oversight of the Designated Government Representative (the "SUPERVISOR"). The PWS identifies specific equipment, locations, and repair/replacement requirements. Contractors must have the capability to perform hydrostatic testing, alignment, operational testing, and compartment closeout inspections. The government will provide some long lead time material. The period of performance is in fiscal year 2025. This PWS supports an upcoming solicitation by the Department of the Navy NAVSUP Fleet Logistic Center in Sigonella, Italy for maintenance and repair services for the USS NEW YORK.

View the file

Other files

File Type Posted
S-1 Non Disclosure Agreement NDA.docx DOCX document
J-1 Contractors Price Breakdown.XLSX XLSX spreadsheet
J-3 Contract Qualification Checklist-QA.pdf PDF
N6817124Q0123.pdf PDF
J-4 Foreign National Access Control Plan Questionnaire.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

FDRMC NAPLES

FPO, AE

USS NEW YORK (LPD 21)

SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED

SPECIFICATION NUMBER: NAPL-025-24

INCLUDES ALL CHANGES THROUGH 7/9/2024

INDEX

SHIP: USS NEW YORK (LPD 21) NAPL-025-24

ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.

CATEGORY I. FY-25 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.

ITEM_NO. TITLE CHANGE DATE CHANGE

009-01 General Criteria; accomplish 09/29/2023 Original

009-02 Environmental Compliance Report for Material Usage; accomplish 09/29/2023 Original

009-03 Toxic and Hazardous Substance; control 09/29/2023 Original

009-04 Quality Management System; provide 03/13/2024 CH-1

009-05 Temporary Access; accomplish 09/29/2023 Original

009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;

accomplish

09/29/2023 Original

009-07 Confined Space Entry, and Certification; accomplish 09/29/2023 Original

009-08 Shipboard Fire Protection and Fire Prevention; accomplish 09/29/2023 Original

009-10 Asbestos-Containing Material (ACM); control 09/29/2023 Original

009-18 Mine Warfare Ships Magnetic Material; control 09/29/2023 Original

009-19 Provisioning Technical Documentation (PTD); provide 09/29/2023 Original

009-20 Government Property; control 03/13/2024 CH-1

009-21 Alteration Verification, Logistic and Technical Data; provide 09/29/2023 Original

009-23 Interference; remove and install 09/29/2023 Original

009-24 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness; accomplish 09/29/2023 Original

009-34 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 09/29/2023 Original

009-39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for

Commercial Equipment/Component; accomplish

09/29/2023 Original

009-40 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a

Naval Facility; provide

09/29/2023 Original

009-60 Schedule and Associated Report for CNO Availability; provide and manage 09/29/2023 Original

009-61 Shipboard Use of Fluorocarbons; control 09/29/2023 Original

009-67 Integrated Total Ship Testing; manage 09/05/2023 Original

009-69 Heavy Weather/Mooring Plan; provide 09/29/2023 Original

009-70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and

Housekeeping for Unmanned Vessels; accomplish

09/29/2023 Original

009-72 Physical Security at a Private Contractor Facility; accomplish 09/29/2023 Original

009-73 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair

09/29/2023 Original

009-74 Occupational, Safety and Health Plan; accomplish 09/29/2023 Original

009-80 Ship Facility; maintain 09/05/2023 Original

009-81 Compartment Closeout; accomplish 09/29/2023 Original

009-82 Installation of Equal Component Vice Specified Component; report 09/29/2023 Original

009-84 Threaded Fastener Requirement; accomplish 09/05/2023 Original

009-88 Collection, Holding and Transfer (CHT) and Motor Gasoline (MOGAS) Tank, Space, and Piping, including Sewage or MOGAS-Contaminated Tank, Space, and Piping; certify

09/18/2023 Original

009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution

Prevention Act (PPA) Information; provide

09/29/2023 Original

009-99 Ship Departure Report; provide 09/29/2023 Original

Page 1 of 4 EXECUTING WORK

ITEM_NO. TITLE CHANGE DATE CHANGE

009-100 Ship's Stability; maintain 09/05/2023 Original

009-101 Ship Transit and Berthing; accomplish 09/29/2023 Original

009-106 Work Authorization Form Coordinator (WAFCOR); provide 09/29/2023 Original

009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 09/29/2023 Original

009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 09/29/2023 Original

009-111 Schedule and Associated Report for Non-CNO Availability; provide and manage 10/01/2023 Original

009-117 Combat Systems, Light-Off Suport; provide 09/29/2023 Original

009-118 CG Deck Loading; accomplish 09/29/2023 Original

009-120 Fact Finding and Critique of Unplanned Event; manage 09/06/2023 Original

009-122 Temporary Padeye; install and remove 08/23/2023 Original

009-125 Boat 65 Feet (20meters) Long and Less; accomplish 09/06/2023 Original

009-126 Schedule Model Review (SMR); accomplish 10/01/2023 Original

Page 2 of 4 EXECUTING WORK

CATEGORY II. FY-25 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER.

TITLE CHANGE DATEITEM NO. CHANGE

009-09 Process Control Procedure (PCP); provide and accomplish

09/29/2023 Original

009-11 Insulation and Lagging; accomplish 09/29/2023 Original

009-12 Weld, Fabricate, and Inspect; accomplish 03/13/2024 CH-1

009-13 Meter, Gauge, Switch, and Thermometer; repair 09/29/2023 Original

009-15 Rotating Machinery; balance 09/29/2023 Original

009-17 Rotating Electrical Equipment; repair 09/29/2023 Original

009-25 Structural Boundary Test; accomplish 09/29/2023 Original

009-32 Cleaning and Painting Requirements; accomplish 03/13/2024 CH-1

009-33 Rotating Electrical Equipment; rewind 09/29/2023 Original

009-36 Controller; repair 09/29/2023 Original

009-52 Relief Valve; repair 09/29/2023 Original

009-58 Pump and Driver Shaft Alignment; accomplish 09/29/2023 Original

009-71 Piping System; test 09/29/2023 Original

009-87 Chemical disinfection Procedures; accomplish 09/18/2023 Original

009-90 Technical Representative; provide 09/29/2023 Original

009-104 Vibration Testing and Analysis; accomplish 09/29/2023 Original

009-113 Rotating Electrical Equipment with a Sealed Insulation

Systems (SIS); rewind

09/29/2023 Original

Page 3 of 4 EXECUTING WORK

ITEM NO. TITLE

Relief Valve Shop Test; accomplish256-10-001

VCHT Relief Valve Pop Test; accomplish256-10-002

Lagging and Insulation; repair508-11-001

Reverse Osmosis (RO) High Pressure Pump; replace531-11-001

Low Pressure Air Compressor Relief Valve Pop Test; accomplish531-50-001

Potable Water Pump; repair533-12-001

JP-5 Transfer Pump Drive Motor; replace542-21-001

Radar Cross Section Reduction (RCSR) Door; repair624-11-001

Well Deck Control Station Window Wiper Assembly; replace625-11-003

Compartment and Pipe Insulation Replacement; accomplish635-11-001

Pneumatic Chain Hoist; install712-11-001

Crane and Rigging Services; provide993-00-001

Page 4 of 4 EXECUTING WORK

SHIP: USS NEW YORK (LPD 21) ITEM NO: 256-10-001

COAR: 26 PCN: See Attachment A

CMP: NONE

PLANNER: KRIEGER, DANIEL

GOOCH, MELISSA

LAFONTAINE,

CHRISTOPHER

NICHOLAS, JARED

STAPLES, MICHAEL

SSP: NAPL-025-24 1 of 4 ITEM NO: 256-10-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Relief Valve Shop Test; accomplish

1.2 Location of Work:

1.2.1 Contractor's Facility

1.3 Identification:

1.3.1 Quantity (7 EA), One Inch, Relief Valves; HPW-V-71, HPW-V-081, HPW-V-074, HPW-V-082, HPW-V-073, HPW-V-076, and HPW-V-083

1.3.2 Quantity (2 EA), One Inch, Relief Valves, OWT-V-92A OWS No.

1A, OWT-V-92B OWS NO. 1B

1.3.3 Quantity (1 EA), 1/2 Inch, Relief Valve, ALP-V-368

1.3.4 Quantity (1 EA), 1-1/2 Inch, Relief Valve, WM-V-7

2. REFERENCES:

2.1 Standard Items, (FY25) CH-1

2.2 S9086-RJ-STM-010/CH-504 Rev 7, Pressure, Temperature And Other Mechanical And Electromechanical Measuring Instruments

2.3 505-7319021 Rev J, AMPHIBIOUS TRANSPORT DOCK LPD-17 - List of Relief Valves

3. REQUIREMENTS:

3.1 Receive each equipment listed in 1.3 from Ship's Force via the SUPERVISOR and inspect for damage and deterioration. See Note 4.2 and 4.1.

3.1.1 Submit one legible copy in English, in hard copy or approved transferrable media, of a report listing results of the requirements of 3.1 to the SUPERVISOR.

3.2 Hydrostatic test equipment must have the following capabilities:

3.2.1 Manual overpressure protection release valve.

3.2.2 Protection equipment must be accessible and test gauges must be located where clearly visible and readable to pump operator and inspector.

3.2.3 Self-actuated and resetting relief valve with a set point no greater than 100 PSIG above the test pressure or 10 percent above the test pressure, whichever is less.

3.2.4 Master and backup test gauges with gauge range and graduation in accordance with Table 504-6-1 of 2.2. The backup gauge must be

SHIP: USS NEW YORK (LPD 21)

SSP: NAPL-025-24 2 of 4 ITEM NO: 256-10-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

cross-checked to the master hydrostatic test gauge up to the maximum test pressure just prior to start of testing. Master and backup gauges must track within 2 percent of each other.

(I)(G) "SHOP TEST"

3.3 Accomplish a Shop Test and ensure each relief valve is set as listed using 2.3 for guidance.

3.3.1 Ensure the lifting pressure is set to 110 (PSIG), for 7 (EA) HPW relief valves listed in 1.3.1, using 2.3 as guidance.

3.3.1.1 Ensure the test medium is clean, fresh water.

3.3.2 Ensure the lifting pressure is set to 28 (PSIG) and seat tightness is set to 25 (PSIG), for 2 (EA) OWT relief valve listed in 1.3.2, using 2.3 as guidance.

3.3.2.1 Ensure the test medium is clean, fresh water.

3.3.3 Ensure the lifting pressure is set to 57 (PSIG) and the seat tightness is set to 51 (PSIG), for 1 (EA), ALP relief valve listed in 1.3.3, using 2.3 as guidance.

3.3.3.1 Ensure the test medium is clean, dry air.

3.3.4 Ensure the lifting pressure is set to 1245 (PSIG) and the seat tightness is set to 1060 (PSIG), for 1 (EA) WM-V-7 relief valve listed in 1.3.4, using 2.3 as guidance.

3.3.4.1 Ensure the test medium is clean, fresh water.

3.4 Submit one legible copy In English, in hard copy or approved transferrable media, of a report listing results of the requirements of

3.3.1 through 3.3.4.1 to the SUPERVISOR.

3.5 Install a wire and/or lead lock seal and attach a metal test tag to each relief valve including the following information:

3.5.1 Ship name and hull number.

3.5.2 Valve number or identification.

3.5.3 Valve lifting pressure.

3.5.4 Date valve tested and set in Month, Day, Year.

3.5.5 Name of repair facility.

3.6 Use hard plastic FME (Foreign Material Exclusion) protective plugs to prevent entry of foreign material into each pressure relief valve.

(V)(G) "RECEIPT INSPECTION"

3.7 Deliver each relief valve to Ship's Force via the SUPERVISOR. Verify each relief valve has a metal test tag attached, new for passed, and existing for rejected.

3.7.1 Submit one legible copy in English, in hard copy or approved transferrable media, of a report listing results of the requirements of 3.7 to the SUPERVISOR.

SSP: NAPL-025-24 3 of 4 ITEM NO: 256-10-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

4. NOTES:

4.1 The Word "SUPERVISOR" in all capital letters means the Designated Representative of The United States Government. It is either the Shipbuilding Specialist or Project Manager working directly for Forward Deployed Regional Maintenance Center. The SUPERVISOR will be onsite for all work being accomplished. Direct any and all questions to the SUPERVISOR. Do not take direction from anyone other than the SUPERVISOR.

4.2 Ship's Force shall remove each valve from each system and provide to the contractor.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

SSP: NAPL-025-24 4 of 4 ITEM NO: 256-10-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

Attachment A

PCN Identification

ER04-4363 TEST PRESSURE RELIEF VALVE

ER09-2509 FILTER CLEANER RLF VLV TEST

EM04-1286 POPTEST RELIEF VALVE

EA01-1100 HOT WATER RELIEF VALVE POPTEST

EA01-1105 HOT WATER RELIEF VALVE POPTEST

EA01-1099 HOT WATER RELIEF VALVE POPTEST

EA01-1101 HOT WATER RELIEF VALVE POPTEST

EA01-1102 HOT WATER RELIEF VALVE POPTEST

EA01-1103 HOT WATER RELIEF VALVE POPTEST

EM04-1285 POPTEST RELIEF VALVE

EA01-1104 HOT WATER RELIEF VALVE POPTEST

SHIP: USS NEW YORK (LPD 21) ITEM NO: 256-10-002

COAR: 26 PCN: ER01-2526

CMP: NONE

PLANNER: STAPLES, MICHAEL

GOOCH, MELISSA

LAFONTAINE,

CHRISTOPHER

NICHOLAS, JARED

SSP: NAPL-025-24 1 of 2 ITEM NO: 256-10-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: VCHT Relief Valve Pop Test; accomplish

1.2 Location of Work:

1.2.1 Passage (6-24-0-L)

1.2.2 Passage (6-95-3-L)

1.3 Identification:

1.3.1 Quantity (2 EA), Relief Valves; VCHT-V-220 and VCHT-V-509

2. REFERENCES:

2.1 Standard Items, (FY25) CH-1

2.2 505-7319021 Rev J, Pressure, Temperature And Other Mechanical And Electromechanical Measuring Instruments

2.3 505-7319021 Rev J, AMPHIBIOUS TRANSPORT DOCK LPD-17 - List of Relief Valves

3. REQUIREMENTS:

3.1 Provide rigging support for each relief valve listed in 1.3.1 and located in 1.2, for removal from the ship to the contractor shop.

3.1.1 Inspect all rigging gear being utilized and ensure it is certified for use. All rigging equipment shall be within calibration for dates work is to be accomplished. Provide certification and calibration records for all rigging gear used on site upon request by the SUPERVISOR.

3.1.2 Submit one legible copy in English, in hard copy or approved transferrable media, of a report listing results of the requirements of 3.1 to the SUPERVISOR.

3.2 Hydrostatic test equipment must have the following capabilities:

3.2.1 Manual overpressure protection release valve.

3.2.2 Protection equipment must be accessible and test gauges must be located where clearly visible and readable to pump operator and inspector.

3.2.3 Self-actuated and resetting relief valve with a set point no greater than 100 PSIG above the test pressure or 10 percent above the test pressure, whichever is less.

3.2.4 Master and backup test gauges with gauge range and graduation in accordance with Table 504-6-1 of 2.2. The backup gauge must be cross-checked to the master hydrostatic test gauge up to the maximum test pressure just prior to start of testing. Master and backup

SSP: NAPL-025-24 2 of 2 ITEM NO: 256-10-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

gauges must track within 2 percent of each other.

(I)(G) "SHOP TEST"

3.3 Shop test and set each relief valve identified in 1.3.1 and 1.3.2 using 2.1 through 2.4 as guidance.

3.3.1 Ensure the test medium is clean, fresh water.

3.3.2 Ensure the lifting pressure is 125 PSIG.

3.3.3 Ensure seat tightness is 117 PSIG.

3.3.4 Submit one legible copy in English, in hard copy or approved transferrable media, of a report listing results of the requirements of 3.3 to the SUPERVISOR.

3.4 Install a wire and/or lead lock seal and attach a metal test tag to each relief valve including the following information:

3.4.1 Ship name and hull number.

3.4.2 Valve number or identification.

3.4.3 Valve lifting pressure.

3.4.4 Date valve tested and set in Month, Day, Year.

3.4.5 Name of repair facility.

3.5 Use hard plastic FME (Foreign Material Exclusion) protective plugs to prevent entry of foreign material into each pressure relief valve.

3.6 Provide rigging support for each relief valve listed in 1.3.1 to be loaded out in location identified in 1.2.

(V)(G) "RECEIPT INSPECTION"

3.7 Verify each relief valve has a metal test tag attached per 3.4.

3.7.1 Submit one legible copy in English, in hard copy or approved transferrable media, of a report listing results of the requirements of 3.7 to the SUPERVISOR.

4. NOTES:

4.1 None

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: USS NEW YORK (LPD 21) ITEM NO: 508-11-001

COAR: 26 PCN: EA04-1526

EE01-0650

EA05-1865

CSWT FILE NO: 508-001 (LSD 41) CMP: NONE

REVISED: 29 SEP 2023 PLANNER: NICHOLAS, JARED

STAPLES, MICHAEL

SSP: NAPL-025-24 1 of 2 ITEM NO: 508-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Lagging and Insulation; repair

1.2 Location of Work:

1.2.1 Deballast Air Compressor Room No. One (4-48-4-Q)

1.2.2 AMR2 Auxiliary Machinery Room No. 2 (7-80-0-E)

1.2.3 Passageway (2-128-2-L)

1.3 Identification:

1.3.1 Quantity (8 LF), 4 Inch Auxiliary Sea Water Pipe Lagging.

1.3.2 Quantity (30 SF), Chill Water Pump Casings Lagging.

1.3.3 Quantity (15 LF), 6 Inch Chill Water Pipe Lagging.

1.3.4 Quantity (6 LF), 4 Inch Chill Water Pipe lagging.

2. REFERENCES:

2.1 Standard Items, (FY25) CH-1

2.2 S9086-RK-STM-010/CH-505 Rev 6, Piping Systems

2.3 MIL-STD-769(CH 1) Rev K, Insulation Requirements for U.S. Naval Vessels

3. REQUIREMENTS:

3.1 Record and document any compartment designations, equipment labeling and system markings affected by the lagging removal in 3.2 through 3.4.

3.1.1 Submit one legible copy, in hard copy or approved

transferrable media, in English, of a report listing the results of

3.1 to the SUPERVISOR.

3.2 Remove and dispose of up to 8 linear feet of 4 inch insulation from Auxiliary Sea Water piping identified in 1.3.1 and located in 1.2.1 as designated by the SUPERVISOR.

3.3 Remove and dispose of up to 30 square feet of insulation from chill water pump casing identified in 1.3.2 and located in 1.2.1 as designated by the SUPERVISOR.

3.4 Remove and dispose of up to 15 linear feet of 6 inch insulation from chill water piping identified in 1.3.3 and located in 1.2.2 as designated by the SUPERVISOR.

3.5 Remove and dispose of up to 6 linear feet of 4 inch insulation from chill water piping identified in 1.3.4 and located in 1.2.3 as designated by the SUPERVISOR.

3.6 Accomplish the requirements of 009-11 of 2.1 for the installation of

SSP: NAPL-025-24 2 of 2 ITEM NO: 508-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

new insulation and lagging removed in 3.2 through 3.5, using Section 2 of 2.2, and 2.3 for guidance. See Note 4.2.

(V)(G) "COMPARTMENT CLOSEOUT INSPECTION"

3.7 Accomplish a compartment inspection with the SUPERVISOR and the Commanding Officer's designated representative upon completion, inspection, and acceptance, by the contractor, of work within each compartment. Ensure Attachment A, Work Completion Certification, is completed in accordance with 009 04 of 2.1.

4. NOTES:

4.1 The Word "SUPERVISOR" in all capital letters means the Designated Representative of The United States Government. It is either the Shipbuilding Specialist or Project Manager working directly for Forward Deployed Regional Maintenance Center. The SUPERVISOR will be onsite for all work being accomplished. Direct any and all questions to the SUPERVISOR. Do not take direction from anyone other than the SUPERVISOR.

4.2 Ships Force will accomplish the cleaning and painting requirement for 3.2 of 009-11, for new insulation, lagging, and reusable covers to match surrounding areas.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: USS NEW YORK (LPD 21) ITEM NO: 531-11-001

COAR: 26 PCN: EM02-2551

CMP: NONE

PLANNER: KRIEGER, DANIEL

GOOCH, MELISSA

NICHOLAS, JARED

STAPLES, MICHAEL

SSP: NAPL-025-24 1 of 3 ITEM NO: 531-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Reverse Osmosis (RO) High Pressure Pump; replace

1.2 Location of Work:

1.2.1 Main Machinery Room No.2 (7-110-0-E)

1.3 Identification:

1.3.1 Quantity (One EA), No. 3 Reverse Osmosis (R.O.) Plant High Pressure Reciprocating Pump Assembly, Mfr.: FMC Technologies Inc., Mfr. ID: P510689, Mfr. Dwg.: P510689, P510478, TRIPLEX Plunger Pump, Model-M1222 NS, Disch. Press. 900PSI, APL: 01A030061

2. REFERENCES:

2.1 Standard Items, (FY25) CH-1

2.2 S9531-DC-MMA-010 Rev 1, Reverse Osmosis Desalination Unit 24,000 Gallons Per Day

2.3 S9086-CJ-STM-010 Rev 7, NSTM Chapter 075, Fasteners

2.4 MIL-STD-777F Chg-2 Rev F, Schedule of Piping, Valves, Fittings, and Associated Piping Components for Naval Surface Ships

2.5 531-8328773, Reverse Osmosis Desalination System Operational Test

2.6 622-7318262 Rev C, Equipment Items Removal Routes (Intra Ship)

3. REQUIREMENTS:

3.1 Remove existing and install new the equipment listed in 1.3, located in 1.2, and provided in 5.1.1 using 2.6 for guidance.

3.1.1 Provide rigging services, equipment and personnel to

accomplish the requirements of 3.1.

3.1.2 Ensure all means are provided for protecting ship's deck, bulkheads and existing equipment from damage.

3.2 Inspect all rigging gear being utilized and ensure it is certified for use. All rigging equipment shall be within calibration for dates work is to be accomplished.

3.2.1 Provide certification and calibration records for all rigging gear used on site upon request by the SUPERVISOR.

3.3 Remove existing and install new equipment listed in 1.3.1 and located in 1.2.1, using 2.2 as guidance.

3.3.1 Remove and dispose of each system fluid in accordance with local laws, codes, ordinances, and regulations.

3.3.2 Restore each piping flange mating surface exposed by

disassembly of the piping system. Repair by removing each high spot, SSP: NAPL-025-24 2 of 3 ITEM NO: 531-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

burr, abrasion, and foreign matter, where removal can be accomplished by hand tools. Take precautions to maintain phonographic finish on each flange that have it.

3.3.3 Clean and visually inspect each pulley sheave and fastener.

Chase and tap exposed threaded areas. Inspect each fastener and replace, if necessary.

3.3.4 Install new gaskets in accordance with 2.4, including Category and Group D-1 and D-3.

3.3.5 Fill the oil sump to proper operating level with approximately (3 GAL) of lubricating oil, in accordance with 4.5.1 of 2.2.

(V)(G) "BELT TENSION AND ALIGNMENT"

3.4 Verify acceptable belt tension and alignment of the pulley sheaves for equipment listed in 1.3.1 and located in 1.2.1, in accordance with Paragraph 4.5.2 of 2.2.

3.4.1 Place straight edge across belt span length for belt defection reference. Measure force required to deflect belt 0.25” using lower O-ring on tension gage as a guide. Adjust belt tension as required to obtain a 5 to 9 lb force.

(V)(G) "OPERATIONAL TEST"

3.5 Accomplish an operational test of the equipment listed in 1.3.1 and located in 1.2.1, in accordance with 2.5. SEE NOTE 4.2 Allowable leakage:

None.

(V)(G) "COMPARTMENT CLOSEOUT INSPECTION"

3.6 Accomplish a compartment inspection with the SUPERVISOR and the Commanding Officer's designated representative upon completion, inspection, and acceptance, by the contractor, of work within each compartment. Ensure Attachment A, Work Completion Certification, is completed in accordance with 009 04 of 2.1.

4. NOTES:

4.1 The Word "SUPERVISOR" in all capital letters means the Designated Representative of The United States Government. It is either the Shipbuilding Specialist or Project Manager working directly for Forward Deployed Regional Maintenance Center. The SUPERVISOR will be onsite for all work being accomplished. Direct any and all questions to the SUPERVISOR. Do not take direction from anyone other than the SUPERVISOR.

4.2 Ships Force shall accomplish any start up maintenance required for operational testing

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

TOTAL

QUANTITY

NAME Of PART

PIECE REF

NATIONAL

STOCK

REQ

SSP: NAPL-025-24 3 of 3 ITEM NO: 531-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

PROVIDED NO. NO. NO. PARA NO.

1. 1 EA

Reciprocating Pump 4 2.2

4320-01- 514-4052 3.3

2. 3 GL

MIL SPEC TEP-

2190 2.2 3.3.5

SHIP: USS NEW YORK (LPD 21) ITEM NO: 531-50-001

CMP: NONE

PLANNER: LAFONTAINE,

CHRISTOPHER

GOOCH, MELISSA

NICHOLAS, JARED

STAPLES, MICHAEL

SSP: NAPL-025-24 1 of 3 ITEM NO: 531-50-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Low Pressure Air Compressor Relief Valve Pop Test; accomplish

1.2 Location of Work:

1.2.1

1.3 Identification:

1.3.1 Quantity (6 EA), Low Pressure Air Compressor Relief Valve

2. REFERENCES:

2.1 Standard Items, (FY25) CH-1

2.2 551-8303123 Rev C, LPD Class, Diagram Low Pressure Ship Service Air System.

3. REQUIREMENTS:

3.1 Receive each equipment listed in 1.3 from Ship's Force via the SUPERVISOR and inspect for damage and deterioration.

3.1.1 Submit one legible copy in English, in hard copy or approved transferrable media, of a report listing results of the requirements of 3.1 to the SUPERVISOR.

(V)(G) "SHOP TEST"

3.2 Accomplish a shop test and set each relief valve to the lifting pressures in accordance with 2.2.

3.3 Relief valves that match the required relief setting pressure, install a wire and/or lead lock seal and attach a metal test tag to each relief valve.

3.3.1 Ship name and hull number

3.3.2 Valve number or identification

3.3.3 Valve lifting pressure

3.3.4 Date valve tested and set

3.3.5 Name of repair facility

(V)(G) "RECEIPT INSPECTION"

3.4 Deliver each relief valve to Ship's Force via the SUPERVISOR.

Allowable damage: None

3.4.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.4 to the SUPERVISOR.

SSP: NAPL-025-24 2 of 3 ITEM NO: 531-50-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

4. NOTES:

4.1 The Word "SUPERVISOR" in all capital letters means the Designated Representative of The United States Government. It is either the Shipbuilding Specialist or Project Manager working directly for Forward Deployed Regional Maintenance Center. The SUPERVISOR will be onsite for all work being accomplished. Direct any and all questions to the SUPERVISOR. Do not take direction from anyone other than the SUPERVISOR.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SSP: NAPL-025-24 3 of 3 ITEM NO: 531-50-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

Attachment A

PCN Identification

EM04-1282 RELIEF VALVE POPTEST

EM04-1283 RELIEF VALVE POPTEST

EM05-1463 POPTEST RELIEF VALVE

EM04-1287 POPTEST RELIEF VALVE

EM04-1284 RELIEF VALVE POPTEST

EM04-1288 POPTEST RELIEF VALVE

SHIP: USS NEW YORK (LPD 21) ITEM NO: 533-12-001

COAR: 26 PCN: EA05-1915

CSWT FILE NO: 533-002 (LPD 17) CMP: NONE

REVISED: 29 SEP 2023 PLANNER: NICHOLAS, JARED

GOOCH, MELISSA

KRIEGER, DANIEL

STAPLES, MICHAEL

SSP: NAPL-025-24 1 of 4 ITEM NO: 533-12-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Potable Water Pump; repair

1.2 Location of Work:

1.2.1 Main Machinery Room No.2 (7-110-0-E)

1.3 Identification:

1.3.1 Quantity (One EA), Number 3 Potable Water Pump, Mfr: Carver Pump Company, Mfr ID: 998-1110-B-02, Mfr Dwg: 998-1110-B-02 Rev 4, APL 01A020042

2. REFERENCES:

2.1 Standard Items, (FY25) CH-1

2.2 S6226-RT-MMC-010 Rev 2, Pump, Potable Water Recirculation 2 X 1-1/2 X 10H, Part No. 999-1110-B-01

2.3 532-7319013 Rev H, Diagram Hot and Cold Potable Water System

3. REQUIREMENTS:

3.1 Receive from ships force GFM listed in 5.1.

3.1.1 Submit one legible copy in English, in hard copy or approved transferrable media, of a report listing results of the requirements of 3.1 to the SUPERVISOR.

3.2 Visually inspect piping alignment for equipment listed in 1.3 and located in 1.2, using 2.2 for guidance.

3.2.1 Submit one legible copy in English, in hard copy or approved transferrable media, of a report listing results of the requirements of 3.2 to the SUPERVISOR.

3.3 Remove and dispose of each system fluid in accordance with local laws, codes, ordinances, and regulations.

3.3.1 Install plugs, caps and/or blanks to all disturbed tubing, piping and machinery/Equipment openings to prevent foreign material exclusion (FME).

3.4 Provide rigging services, equipment and personnel as necessary to accomplish the removal equipment identified in 1.3.1, and transfer to contractor's shop.

3.4.1 Protect the ship's deck, bulkheads and existing equipment from damage by installing herculite, canvas or other suitable protective coverings, and/or fire retardant plywood during component rigging and handling evolutions. All necessary precautions shall be taken to avoid damaging ship and ship's equipment.

3.4.2 Inspect all rigging gear being utilized and ensure it is

SSP: NAPL-025-24 2 of 4 ITEM NO: 533-12-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

certified for use. All rigging equipment shall be within calibration for dates work is to be accomplished.

3.4.3 Provide certification and calibration records for all rigging gear used on site upon request by the SUPERVISOR.

3.5 Disassemble each equipment listed in 1.3 and located in 1.2, in accordance with 2.2.

3.5.1 During disassembly, match-mark parts so they can be replaced in their original position.

3.5.2 Clean each exposed part free of foreign matter or debris, leaving no residue or injurious effects.

3.5.3 Clear and clean each pocket and passage free of each

obstruction and foreign matter.

3.5.4 Inspect each part for wear and defect, in accordance with 2.2.

3.5.5 Measure and record each serial number, size, and clearance, of each equipment listed in 1.3, using 2.2 for guidance.

3.5.6 Include each size, clearance, fit and finish for each wearing part, bearing surface, thrust and journal bearing, seal and packing area, and physical condition of each part not specified for renewal.

3.5.6.1 Submit one legible copy in English, in hard copy or

approved transferrable media, of a report listing results of the requirements of 3.5.3 to 3.5.5 to the SUPERVISOR.

3.5.7 Remove each high spot, burr, abrasion, nick, corrosion, gasket material, and foreign matter from each exposed flange and mating surface.

3.5.8 Remove each burr and high spot from each exposed sliding surface, screw thread, key, and keyway.

3.6 Remove existing and install new material provided in 5.1 in accordance with 2.2.

3.6.1 Remove each existing and install new gasket, o-ring, pin, key, stud, bolt, and nut. Material must conform to specifications in Figure 8-1 of 2.2.

3.6.2 Rotate shaft by hand one complete revolution. Rubbing or binding of the rotating assembly is not allowed.

3.6.3 Measure and record each final size and clearance, using 2.2 for guidance.

3.6.3.1 Submit one legible copy in English, in hard copy or

approved transferrable media, of a report listing results of the requirements of 3.6.3 to the SUPERVISOR.

(V)(G) "STRAIN FREE"

3.7 Align the piping to each equipment listed in 1.3. Piping must be supported independently and must not impose a strain on the equipment.

Accomplishment of alignment by adjustment of the first adjacent hanger is to be considered within the scope of the work.

3.7.1 Submit one legible copy in English, in hard copy or approved

SSP: NAPL-025-24 3 of 4 ITEM NO: 533-12-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

transferrable media, of a report listing results of the requirements of 3.7 to the SUPERVISOR.

(V)(G) "OPERATIONAL TEST"

3.8 Accomplish an operational test of equipment listed in 1.3 and located in 1.2, in accordance with 2.2.

3.8.1 Submit one legible copy in English, in hard copy or approved transferrable media, of a report listing results of the requirements of 3.8 to the SUPERVISOR.

(V)(G) "COMPARTMENT CLOSEOUT INSPECTION"

3.9 Accomplish a compartment inspection with the SUPERVISOR and the Commanding Officer's designated representative upon completion, inspection, and acceptance, by the contractor, of work within each compartment. Ensure Attachment A, Work Completion Certification, is completed in accordance with 009 04 of 2.1.

4. NOTES:

4.1 The Word "SUPERVISOR" in all capital letters means the Designated Representative of The United States Government. It is either the Shipbuilding Specialist or Project Manager working directly for Forward Deployed Regional Maintenance Center. The SUPERVISOR will be onsite for all work being accomplished. Direct any and all questions to the SUPERVISOR. Do not take direction from anyone other than the SUPERVISOR.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

TOTAL

QUANTITY

PROVIDED NAME Of PART

PIECE

NO.

REF

NO.

NATIONAL

STOCK

NO.

REQ

PARA NO.

1. 1 EA

IMPELLER, PUMP,

CENTER

3013A417

8EA68 2.2

LLH92500

8 3.1

2. 2 EA

SLEEVE, SHAFT,

PUMP

3013A417

8EA69 2.2

01525854 9 3.1

3. 1 EA SLINGER

3013A417

8EA70 2.2

01431747 9 3.1

4. 1 EA RING, WEARING

3013A417

8EA72 2.2

01581768 6 3.1

5. 1 EA Mechanical Seal 91-175- 99-0005D 3.1

6. 1 EA Impeller Bolt

805- 0500-08- 900 3.1

7. 1 EA

Undersize Wear Ring

US7-02-

006-305 3.1

5.2 PUSH MATERIAL:

1. None.

SSP: NAPL-025-24 4 of 4 ITEM NO: 533-12-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

SHIP: USS NEW YORK (LPD 21) ITEM NO: 542-21-001

COAR: 26 PCN: V401-L012

CSWT FILE NO: 542-003 (LPD 17) CMP: NONE

REVISED: 29 SEP 2023 PLANNER: LAFONTAINE,

CHRISTOPHER

NICHOLAS, JARED

STAPLES, MICHAEL

SSP: NAPL-025-24 1 of 3 ITEM NO: 542-21-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: JP-5 Transfer Pump Drive Motor; replace

1.2 Location of Work:

1.2.1 JP-5 Pump Room (8-143-0-J)

1.3 Identification:

1.3.1 Quantity (1 EA), Number One JP-5 Transfer Pump Drive Motor, Mfr: Reliance Electric, Mfr. Dwg: 801635-521 REV A, Mfr. ID: 801635- 521, 1,200 RPM, AMPS-40, 60HZ, 440VAC, APL 17A020029, Weight 1,200

LBS.

2. REFERENCES:

2.1 Standard Items, (FY25) CH-1

2.2 S6226-RL-MMC-010 Rev 2, Pump, JP-5 Transfer Model BHXL4NFD, Part E-

2.3 622-7318262 Rev C, Equipment Items Removal Routes (Intra Ship)

3. REQUIREMENTS:

3.1 Provide rigging services, equipment, and personnel as necessary to accomplish this work item.

3.1.1 Inspect all rigging gear being utilized and ensure it is certified for use. All rigging equipment shall be within calibration for dates work is to be accomplished. Provide calibration and certification documentation to the SUPERVISOR upon request.

3.2 Disconnect each cable from the equipment listed in 1.3.1, located in

1.2.1 and pull back. Record and retain electrical hook-up data in English.

3.2.1 Remove equipment listed in 1.3.1, located in 1.2.1, using 2.1 through 2.3 for guidance.

3.2.2 Submit one legible copy in English, in approved transferrable media, of a report listing equipment and parts removed as interference in 3.2.1, to the SUPERVISOR. The report must identify Location/Space, Item description (e.g., piping size, valve number cable identification, gauge number, etc), and System for each interference piece removed

3.2.3 Chase and tap exposed threaded areas. Inspect each fastener and replace, if necessary, as required by 009 84 of 2.1.

3.3 Install equipment provided in 5.2.1 in location listed in 1.2.1, in accordance with 2.2, using 2.1 and 2.3 for guidance.

3.3.1 Use Paragraph 6-17 of 2.2 for new component remounting as

SSP: NAPL-025-24 2 of 3 ITEM NO: 542-21-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

guidance.

3.3.2 Accomplish insulation resistance test on each cable for continuity. Ensure a minimum of 1.0 Megaohms on each cable conductor to ground and between conductors.

3.3.3 Submit one legible copy in English, in hard copy or approved transferrable media, of a report listing results of the requirements of 3.3.1 to the SUPERVISOR.

3.3.4 Accomplish a Timing Belt Sprocket Alignment and Timing Belt Tension adjustment in accordance with section 6.3 and 6.4 of 2.2.

(V)(G) "TIMING BELT TENSION CHECK"

3.4 Apply 20 pound of force on the long side of the Timing Belt. Verify belt deflection is one half inch when force is applied as shown in Figure 6-2 of 2.2. Acceptable Criteria: One half inch of deflection.

3.4.1 Submit one legible copy in English, in hard copy or approved transferrable media, of a report listing results of the requirements of 3.4 to the SUPERVISOR.

(V)(G) "OPERATIONAL TEST"

3.5 Accomplish an operational test of Number One JP-5 Transfer Pump Drive Motor in accordance with Ships Force operating instructions. See Note 4.1.

3.5.1 Submit one legible copy in English, in hard copy or approved transferrable media, of a report listing results of the requirements of 3.5 to the SUPERVISOR.

(V)(G) "COMPARTMENT CLOSEOUT INSPECTION"

3.6 Accomplish a compartment inspection with the SUPERVISOR and the Commanding Officer's designated representative upon completion, inspection, and acceptance, by the contractor, of work within each compartment. Ensure Attachment A, Work Completion Certification, is completed in accordance with 009 04 of 2.1.

4. NOTES:

4.1 Ships force will operate equipment.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

TOTAL

QUANTITY

PROVIDED NAME Of PART

PIECE

NO.

REF

NO.

NATIONAL

STOCK

NO.

REQ

PARA NO.

1. 1 EA

Number One JP-5 Transfer Pump Drive Motor 2.2

NIIN:015

016395 3.1

SSP: NAPL-025-24 3 of 3 ITEM NO: 542-21-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

2. 6 EA

Grooved Pin 0.44 x 1.75 2.2 930567 3.1

SHIP: USS NEW YORK (LPD 21) ITEM NO: 624-11-001

COAR: 26 PCN: DA01-L033

CMP: NONE

PLANNER: LAFONTAINE,

CHRISTOPHER

GOOCH, MELISSA

NICHOLAS, JARED

STAPLES, MICHAEL

SSP: NAPL-025-24 1 of 3 ITEM NO: 624-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Radar Cross Section Reduction (RCSR) Door; repair

1.2 Location of Work:

1.2.1 Fueling at Sea Station (FAS) No. One (01-83-1-Q)

1.3 Identification:

1.3.1 Quantity, One (EA), Electric Cylinder, Radar Cross Section Reduction (RCSR) Door, FAS ONE, NIN: 01-568-1301.

1.3.2 Quantity, One (EA), Electric Gear Motor, Radar Cross Section Reduction (RCSR) Door, FAS One, NIN: 01-569-6508.

2. REFERENCES:

2.1 Standard Items, (FY25) CH-1

2.2 S9167-A8-MMO-010 Rev 7, Radar Cross Section Reduction (RCSR) Closures for LPD 17 Class

2.3 DMT 512-002 Rev A, SERMC, Electric Motor Operational Test Procedure

3. REQUIREMENTS:

3.1 Verify with the SUPERVISOR and Ship's Force, that the work site is safe and equipment identified 1.3 and located in 1.2 is adequately isolated, de-energized, drained and depressurized as necessary, using 2.2 for guidance.

3.2 Remove existing, fit and Install new One (EA) Cylinder identified

1.3.1 and located in 1.2.1 under the direct oversight of the OEM Technical representative and the SUPERVISOR, using 2.2 for guidance.

3.2.1 Mechanically disconnect the cylinder identified in 1.3 and located in 1.2.1 in accordance with 2.2.

3.2.2 Matchmark, identify and retain for reuse existing parts for equipment identified in 1.3.1 and located in 1.3.2 using 2.2 for guidance.

3.2.3 Clean, Chase and Tap each exposed threaded surface of existing parts. Retain parts for reuse.

3.2.4 Repair by removing each high spot, burr, abrasion, and

foreign matter, where removal can be accomplished for equipment identified in 1.3 and located in 1.2 using 2.2 for guidance.

3.3 Remove existing and install new 1(EA) electric motor identified in

1.3.2 and located in 1.2 in accordance with 2.2.

3.3.1 Accomplish electrical disconnect of the equipment identified in 1.3 and located in 1.2.1 using 2.2 for guidance. Take insulation

SSP: NAPL-025-24 2 of 3 ITEM NO: 624-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

resistance readings, testing each cable for continuity. The minimum acceptable readings of each cable conductor to ground and between conductors is a minimum of 1.0 Megaohm for power circuits. Record and retain electrical hook-up data in English.

3.4 Accomplish an alignment of each motor and gearbox for equipment identified in 1.3 and located in 1.2 in accordance with 2.2.

(V)(G) "OPERATIONAL TEST"

3.5 Accomplish an operational test of equipment identified in 1.3 and located in 1.2 in accordance with 2.2. Allowable binding or sticking:

None.

3.5.1 Submit one legible copy in English, in hard copy or approved transferrable media, of a report listing results of the requirements of 3.7 to the SUPERVISOR.

(V)(G) "COMPARTMENT CLOSEOUT INSPECTION"

3.6 Accomplish a compartment inspection with the SUPERVISOR and the Commanding Officer's designated representative upon completion, inspection, and acceptance, by the contractor, of work within each compartment. Ensure Attachment A, Work Completion Certification, is completed in accordance with 009 04 of 2.1. Compartment shall be left in "as good or better" condition than the compartment was in prior to work being accomplished.

4. NOTES:

4.1

KNOWN OEM SOURCE:

SUN MANUFACTURING, LLC

1291 BURNBRIDGE ROAD

SUITE 103 FOREST, VA 24551

PHONE: KEN WALLACE 434-426-6096

PHONE: SONYA WILLIAMS 434-942-4626

SMWILLIAMS@SUNMFGUSA.COM

KRWALLACE@SUNMFGUSA.COM

4.1.1 Government to provide OEM for oversight of Radar Cross Section Reduction (RCSR) Door repair only.

4.2 The Word "SUPERVISOR" in all capital letters means the Designated Representative of The United States Government. It is either the Shipbuilding Specialist or Project Manager working directly for Forward Deployed Regional Maintenance Center. The SUPERVISOR will be onsite for all work being accomplished. Direct any and all questions to the SUPERVISOR. Do not take direction from anyone other than the SUPERVISOR.

4.3 S/F has new actuating Cylinder onboard (NIIN: 01-568-1301).

4.4 PE IS IN POSSESSION OF DRIVE MOTOR (NIIN: 01-569-6508) AND WILL HAVE

IT SENT TO SHIP.

SSP: NAPL-025-24 3 of 3 ITEM NO: 624-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

4.5 THIS WORK ITEM WAS WRITTEN TO FACILITATE THE REPLACEMENT OF THE

HOISTING CYLINDER AND DRIVE MOTOR IAW TM S9167-A8-MMO-010 AND RESTORE TO

FAS 1 RCSR DOOR TO READINESS CONDITION.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

TOTAL

QUANTITY

PROVIDED NAME Of PART

PIECE

NO.

REF

NO.

NATIONAL

STOCK

NO.

REQ

PARA NO.

1. 1 EA

Cylinder, Electric N/A 2.2

NIN 01-

568-1301 3.2

2. 1 EA Gear Motor N/A 2.2

NIN 01-

569-6508 3.2

5.2 PUSH MATERIAL:

1. None.

SHIP: USS NEW YORK (LPD 21) ITEM NO: 625-11-003

COAR: 26 PCN: DB01-L056

CMP: NONE

PLANNER: NICHOLAS, JARED

GOOCH, MELISSA

SSP: NAPL-025-24 1 of 2 ITEM NO: 625-11-003

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Well Deck Control Station Window Wiper Assembly; replace

1.2 Location of Work:

1.2.1 Well Deck Control Station, Ballast Control Room and Conflag Station Number 5 (2-135-2-C)

1.3 Identification:

1.3.1 Quantity (1 EA), Wiper Assembly for Well Deck Control Station, Wiper Type C, MFR: In-Mar Systems Inc, MFR DWG: Q7924-02 Rev 4, MFR

ID: Q7924-02, NSN: 2090-01-506-1066, APL: 35A030005

2. REFERENCES:

2.1 Standard Items, (FY25) CH-1

2.2 801-8303100 Rev C, LPD 21, Book of General Drawings

2.3 S9625-BD-MMC-010 Rev 1, Wiper, Type 'C' Straight Line With IM-1001- 100-L03 Control System

2.4 600-7318149 Rev G, Outfitting Items Structural Unit 2582

2.5 320-7318483 Rev F, Pwr Sys 60Hz Supply to Elex Sys Deck Plan Electrical Zone No. 8

2.6 62511-3-001 Rev E, Heated Windows and Wipers Electrical and Operability Test Procedure

3. REQUIREMENTS:

3.1 Provide staging to accomplish this work item. The work area is approximately 30 Feet above the deck, use 2.2 as guidance.

3.2 Remove existing wiper assembly listed in 1.3, located in 1.2, using

2.1 and 2.3 for guidance.

3.2.1 Disconnect each cable from the equipment listed in 1.3.1, located in 1.2.1 and pull back. Record and retain electrical hook-up data in English.

3.2.2 Template exact size, configuration and location from each existing shipboard condition.

3.2.3 Retain and inventory each part removed using 2.3 as guidance.

3.2.3.1 Submit one legible copy in English, in hard copy or

approved transferrable media, of a report listing results of the requirements of 3.2.3 to the SUPERVISOR.

3.2.3.2 Accomplish the requirements of 009 84 of 2.1, inspect each fastener intended for reuse for wear and defects.

3.2.3.3 Clean each fastener free of foreign matter (including paint).

SSP: NAPL-025-24 2 of 2 ITEM NO: 625-11-003

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

3.2.3.4 Chase and tap each exposed threaded area.

3.2.4 Restore each mating surface exposed by removal. Repair by removing each high spot, burr, abrasion, and foreign matter, where removal can be accomplished by a hand tool.

3.3…