Motor Calibrations CDRLs_Redacted.pdf

PDF 240 KB Posted

Attached to
Rotary Stepper Motor Calibrations
Solicitation number
N6660427Q0046
Issued by

About this file

This document is a Contract Data Requirements List (DD Form 1423-1) specifying deliverables for a Department of Defense contract related to the USRD APTF and OTF system.

The contract (N6660426PXXXX) requires two technical report data items to be submitted to NUWCDIVNPT Code 1512. Data Item A001 is a Calibration Report (Visit Report) referenced in SOW Paragraph 5.1, and Data Item A002 is a Certificate of Calibration referenced in SOW Paragraph 5.2. Both reports are categorized as Technical Report – Study/Services under the miscellaneous category and utilize authority DI-MISC-80508B. Each report must be submitted once per contract line item number (CLIN) within 10 business days after completion of calibration or on-site work. Distribution is restricted to the Department of Defense and U.S. DoD contractors only under a Critical Technology distribution statement dated 28 December 2023, with distribution controlled by NUWCDIVNPT Code 15. The delivery requirements specify two final copies of each report (CODE 1512: 0 Draft, 2 Final, 0 Repro; CODE 1532: 0 Draft, 1 Final, 0 Repro) for a total of three copies per data item. DD 250 forms are required, and the contractor status is currently listed as TBD.

View the file

Other files

File Type Posted
Motor Calibrations Statement of Workpdf.pdf PDF
OTF Rotator Diagram_15-0048_MV.jpg JPG image
Rotator Diagram_15-0048_DP.pdf PDF
Motor Calibrations RFQ.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

000X

B. EXHIBIT

A

C. CATEGORY

TDP_________ TM___________ OTHER_______MISC__________

D. SYSTEM/ITEM

USRD APTF AND OTF

E. CONTRACT / PR NO.

N6660426PXXXX

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM:

TECHNICAL REPORT – STUDY/SERVICES

3. SUBTITLE

CALIBRATION REPORT (VISIT

REPORT)

17. PRICE GROUP

4. AUTHORITY (Date Acquisition Document No.)

DI-MISC-80508B

5. CONTRACT REFERENCE

SOW Para 5.1

6. REQUIRING OFFICE

NUWCDIVNPT Code 1512

18. ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMNT

REQUIRED

10. FREQUENCY

Once per CLIN (total of X)

12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION *

LT See Block 16* b. COPIES

8. APP CODE SEE BLOCK 16 11. AS OF DATE 13. DATE OF SUBSEQNT

SUBMISSION

a. ADDRESSEE Draft Final

N/A N/A N/A Reg Repro

16. REMARKS CODE 1512 0 2 0

BLOCK 9: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD Contractors only; CRITICAL TECHNOLOGY; 28 December 2023. Other requests for this document shall be referred to NUWCDIVNPT Code 15.

CODE 1532 0 1 0

BLOCK 12: Report must be submitted 10 business days after completion of calibration/on-site work.

15. TOTAL

______> 0 3 0

H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page _ 1 _ of _ 2 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

000X

B. EXHIBIT

A

C. CATEGORY

TDP_________ TM___________ OTHER_______MISC__________

D. SYSTEM/ITEM

USRD APTF AND OTF

E. CONTRACT / PR NO.

N6660426PXXXX

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM:

TECHNICAL REPORT – STUDY/SERVICES

3. SUBTITLE

CERTIFICATE OF CALIBRATION

17. PRICE GROUP

4. AUTHORITY (Date Acquisition Document No.)

DI-MISC-80508B

5. CONTRACT REFERENCE

SOW Para 5.2

6. REQUIRING OFFICE

NUWCDIVNPT Code 1512

18. ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMNT

REQUIRED

10. FREQUENCY

Once per CLIN (total of X)

12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION *

LT See Block 16* b. COPIES

8. APP CODE SEE BLOCK 16 11. AS OF DATE 13. DATE OF SUBSEQNT

SUBMISSION

a. ADDRESSEE Draft Final

N/A N/A N/A Reg Repro

16. REMARKS CODE 1512 0 2 0

BLOCK 9: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD Contractors only; CRITICAL TECHNOLOGY; 28 December 2023. Other requests for this document shall be referred to NUWCDIVNPT Code 15.

CODE 1532 0 1 0

BLOCK 12: Report must be submitted 10 business days after completion of calibration/on-site work.

15. TOTAL

______> 0 3 0

G. PREPARED BY: H. DATE J. DATE

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page _ 2 _ of _ 2 Pages

File details come from the government source that posted it. Updated .