N6660425Q0591 Amendment 0001.pdf

PDF 374 KB Posted

Attached to
NUWCDIVNPT Construction-B1319 Room B25 Epoxy Floor Renovation Project
Solicitation number
N6660425Q0591
Issued by

About this file

This is a solicitation amendment (Amendment 0001) for contract N6660425Q0591 issued by the Naval Undersea Warfare Center Division Newport. The amendment is dated August 7, 2025, and is issued by Zachary Silveira from the Contracts Department. The primary purpose of this amendment is to update the wage determination in Attachment 3, specifically replacing the Rhode Island Davis Bacon Wage determination dated July 4, 2025, with a newer version dated July 25, 2025.

The solicitation includes five attachments: specifications (166 pages), drawings (2 pages), the updated Davis Bacon Wage determination (15 pages), a hazmat user log (1 page), and a generator user log (1 page). The amendment increases the Davis Bacon Wage determination from 14 pages to 15 pages while maintaining all other solicitation terms and conditions unchanged. Key personnel contacts are Zachary Silveira (Zachary.g.silveira.civ@us.navy.mil) and Michael Ouellette (Michael.N.Ouellette.civ@us.navy.mil). The document follows standard federal contracting amendment procedures, requiring offerors to acknowledge receipt of the amendment to avoid rejection of their proposals.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1301270204

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to update the w age determinatiuon Attachment 3.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Aug-2025

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6660425Q0591

X 9B. DATED (SEE ITEM 11)

18-Jul-2025

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Aug-2025

CODE

NAVAL UNDERSEA WARFARE CENTER DIV. NPT.

ZACHARY SILVEIRA, CODE 0232

CONTRACTS DEPARTMENT

1176 HOWELL STREET, BLDG. 1258

NEWPORT RI 02841-1708

N66604 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6660425Q0591

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The following have been modified:

GENERAL INFORMATION

Distribution: To be provided at award NUWCDIVNPT PR Number: To be provided at award

NUWCDIVNPT PID: N66604-25-SIMACQ-NPT-10-0372

NUWCDIVNPT Points of Contact: Zachary Silveira Zachary.g.silveira.civ@us.navy.mil and Michael Ouellette Michael.N.Ouellette.civ@us.navy.mil

Amendment 0001

The purpose of this amendment is to replace RI Davis Bacon Wage determination dated 4 July 2025 with RI Davis Bacon Wage determination dated 25 July 2025.

All other solicitation terms and conditions remain unchanged.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Specifications 166 17-JUN-2025 Attachment 2 Drawings 2 17-JUN-2025 Attachment 3 Davis Bacon WD 14 04-JUL-2025 Attachment 4 Hazmat User Log 1 01-SEP-2024 Attachment 5 Generator User Log 1 01-NOV-2024 to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Specifications 166 17-JUN-2025 Attachment 2 Drawings 2 17-JUN-2025

N6660425Q0591

Attachment 3 Davis Bacon Wage Determination

15 25-JUL-2025

Attachment 4 Hazmat User Log 1 01-SEP-2024 Attachment 5 Generator User Log 1 01-NOV-2024

(End of Summary of Changes)

File details come from the government source that posted it. Updated .