N6660425Q0171 Amendment 0001.pdf

PDF 551 KB Posted

Attached to
Construction-B1259 1st Floor Bathroom Renovation Project Federal contract opportunity
Solicitation number
N6660425Q0171
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This is Amendment 0001 to solicitation N6660425Q0171 for the B1259 1st Floor Bathroom Renovation Project at Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT). The amendment provides answers to two questions: 1) The dumpster site and material/equipment storage area location will be provided at the pre-construction meeting, and 2) A negative air space system is not deemed necessary for the project as the existing ventilation system will remain operational during demolition and construction.

The amendment indicates this is a DO-C2 rated order under the Defense Priorities and Allocations System (DPAS). Points of contact are Zachary Silveira and Michael Ouellette. The amendment's effective date is February 10, 2025, and all other solicitation terms and conditions remain unchanged. Contractors must have active SAM.gov registration but do not need JCP certification to receive solicitation documents.

View the file

Other files for this federal contract opportunity

Other files attached to Construction-B1259 1st Floor Bathroom Renovation Project, newest first.
File Type Posted
Attachment 3 - RI Davis Bacon WD.pdf PDF
N6660425Q0171.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1301213154

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Page 2

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Feb-2025

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6660425Q0171

X 9B. DATED (SEE ITEM 11)

22-Jan-2025

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Feb-2025

CODE

NAVAL UNDERSEA WARFARE CENTER DIV. NPT.

ZACHARY SILVEIRA, CODE 0232

CONTRACTS DEPARTMENT

1176 HOWELL STREET, BLDG. 1258

NEWPORT RI 02841-1708

N66604 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6660425Q0171

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The following have been modified:

GENERAL INFORMATION

Distribution: To be provided at award NUWCDIVNPT PR Number: To be provided at award

NUWCDIVNPT PID: N66604-25-SIMACQ-NPT-10-0137

NUWCDIVNPT Points of Contact: Zachary Silveira Zachary.g.silveira.civ@us.navy.mil and Michael Ouellette Michael.N.Ouellette.civ@us.navy.mil

This is a DO-C2 rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700)

Amendment 0001

The purpose of amendment 0001 is to:

1. Provide answers to RFI 001 as seen below:

RFI 0001

1. Please provide location of area for bidder to use as a dumpster site and material/equipment storage area.

1. Answer: location will be provided at the pre-construction meeting.

2. Pursuant to practicing good Site Safety and Health requirements, the contractor may wish to install and operate negative air machinery to maintain Indoor Air Quality. Please identify a location of a window or door that can be used.

2. Answer: We do not believe a negative air space system will be needed for this project. The existing ventilation system is remaining operation during demo/construction.

All other solicitation terms and conditions remain unchanged

(End of Summary of Changes)

File details come from the government source that posted it. Updated .