This is Amendment 0002 to solicitation N6660425Q0116 issued by the Naval Undersea Warfare Center Division Newport (NUWCDIVNPT) for renovations to Building 109 at Dodge Pond. The amendment makes two key changes: (1) replaces Attachment 3 RI Davis Bacon Wage Determination with CT Davis Bacon Wage Determination, and (2) provides answers to contractor questions regarding the work environment and specifications.
The amendment clarifies that the building will be unoccupied during construction, the government will remove and store furniture to be retained while the contractor must dispose of unwanted items, and confirms that acoustic ceiling tiles specified are the intended product despite being more commonly used in residential applications. The amendment also removes the requirement to verify sewer line connections to storm drains. This is a DO-C2 rated order under DPAS for national defense and emergency preparedness. The original solicitation was issued on November 20, 2024, and this amendment is dated December 10, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_3_ Davis Bacon Wage Determination CT - Copy.pdf | ||
| N6660425Q01160001.pdf | ||
| Attachment_3_ Davis Bacon Wage Determination 20241108 - Copy.pdf | ||
| N6660425Q0116.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1301203741
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Page 2
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Dec-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6660425Q0116
X 9B. DATED (SEE ITEM 11)
20-Nov-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Dec-2024
CODE
NAVAL UNDERSEA WARFARE CENTER DIV. NPT.
ZACHARY SILVEIRA, CODE 0232
CONTRACTS DEPARTMENT
1176 HOWELL STREET, BLDG. 1258
NEWPORT RI 02841-1708
N66604 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6660425Q0116
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The following have been added by full text:
GENERAL INFORMATION 0002
Distribution: To be provided at award NUWCDIVNPT PR Number: To be provided at award
NUWCDIVNPT PID: N66604-25-SIMACQ-NPT-10-0068
NUWCDIVNPT Points of Contact: Zachary Silveira Zachary.g.silveira.civ@us.navy.mil and Michael Ouellette Michael.N.Ouellette.civ@us.navy.mil
This is a DO-C2 rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700)
Amendment 0002:
The purpose of this amendment is to:
1. Replace Attachment 3 RI Davis Bacon Wage Determination with CT Davis Bacon Wage Determination.
2. Provide answers to RFI 0001 as seen below.
RFI 0001
1. Will the space be occupied or unoccupied when we are working there?
1A. The building will be unoccupied for the duration of construction.
2. Who moves all the furniture, equipment, items from walls, etc.? Where will it be stored?
2A. The government will remove and store existing furniture to be retained on-site, contractor will be responsible for disposal of furniture, equipment, etc. not retained by government. The contractor will not need to store these items, only dispose of them.
3. 01 14 00, 1.3.5e states for contractor to “verify the sewer line is not incorrectly connected to a storm drain”. Is this a part of this contract? If so, how do you want this done? (dig it up, metal detecting, GPR, send a camera in the pipe?)
3A. Strike this part of the contract as it is unnecessary.
N6660425Q0116
4. The contract documents for this project call for the acoustic ceiling tiles. This is more commonly used as a residential tile. Can you please confirm that this is the intended product, or should we be looking for a commercial ceiling tile?
4A. This is the intended product.
All other solicitation terms and conditions remain unchanged.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Specifications 196 21-OCT-2024 Attachment 2 Drawings 6 21-OCT-2024 Attachment 3 Davis Bacon Wage
Determinations
15 08-NOV-2024
to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Specifications 196 21-OCT-2024 Attachment 2 Drawings 6 21-OCT-2024 Attachment 3 Davis Bacon Wage
Determination CT
13 07-JUN-2024
(End of Summary of Changes)